➡️ All Notice/engineering events of Barharwa-Azimganj-Katwa BAK Loop (including Katwa-Bandel Line) .Engineering blocks on 08/09.01.19 click here
×
37747/Bandel - Katwa Local
BDC/Bandel Junction
131333 views
1
Power and Traffic Block between Bhandartikuri - Agradwip from 18/2/14-21/2/14 in connection with electrification of double line between Purbasthali - Patuli
×
37747/Bandel - Katwa Local
BDC/Bandel Junction
643213 views
5
Traffic Block betweenBandel and Banshberia on 10 &11 NovemberPurbasthali and Agradwip on 10 ,11 ,14,15,16 NovemberNabadwipdham and Agradwip on 12 NovemberSamudragarh and Agradwip on 13 Novemberfor track maintenance and electrification in co nnection with doubling work
×
37915/Howrah - Katwa Local
DHAE/Dainhat
266881 views
1
Traffic Block from Dainhat to Agradwip for 6 days from 27/10/14-2/11/14 in connection with electrification for doubling of track between Patuli and Dainhat
×
37747/Bandel - Katwa Local
PSAE/Purbasthali
158769 views
2
Traffic Block between Purbasthali and Agradwip from 15/10/14-16/10/14 for track maintenance work
Important Note:This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks. Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.