Full Site Search  
Thu Jun 29, 2017 14:40:54 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Large Station Board;
Close-up; Platform Pic; Large Station Board;
Side+view+%2C+Large+station+board+in++Hindi%2C+English+and+telegu.

ADB/Adilabad (3 PFs)
ఆదిలాబాద్     आदिलाबाद

Track: Single Diesel-Line

Type of Station: Regular
Number of Platforms: 3
Number of Halting Trains: 10
Number of Originating Trains: 4
Number of Terminating Trains: 4
Adilabad Railway Station, National Highway 7, Adilabad
State: Telangana
Elevation: 248 m above sea level
Zone: SCR/South Central
Division: Hazur Sahib Nanded
1 Travel Tips
No Recent News for ADB/Adilabad
Nearby Stations in the News

Rating: 2.5/5 (8 votes)
cleanliness - average (1)
porters/escalators - average (1)
food - poor (1)
transportation - good (1)
lodging - poor (1)
railfanning - average (1)
sightseeing - average (1)
safety - good (1)

Nearby Stations

UMM/Umram 11 km     TLMG/Talmadugu 16 km     TDT/Talamadugu Halt 16 km     PMKT/Pimpal Khuti 21 km     KSAE/Kosai 22 km     ABX/Ambari 37 km    

Station News

Page#    Showing 1 to 16 of 16 News Items  
Dec 28 2016 (14:43)  Prime Minister to unveil railway projects worth ₹77,000 crore today (www.thehindubusinessline.com)
back to top
SCR/South Central  -  

News Entry# 289844   Blog Entry# 2108284     
   Tags   Past Edits
Dec 28 2016 (2:43PM)
Station Tag: Gadchandur/GDCR added by San/538295

Dec 28 2016 (2:43PM)
Station Tag: Adilabad/ADB added by San/538295

Posted by: San  10 news posts
New networks in Maharashtra eye improved connectivity
Mumbai, December 23:
A slew of railway projects, totalling about ₹77,000 crore, aimed at improving railway connectivity in Mumbai and other parts of Maharashtra will be kick started by Prime Minister Narendra Modi during his visit to Mumbai on Saturday.
This includes the ₹11,000-crore Mumbai Urban Transport Project III (MUTP III) as well as MoUs
...
more...
with Maharashtra governmnet for three projects in Mumbai (approximately ₹45,000 crore), and nine in Maharashtra worth ₹22,000 crore.
This was announced at a joint press conference by the General Managers of Western and Central Railways and Chairman of Mumbai Rail Vikas Corporation here on Friday. Projects under the MUTP III seek to decongest the Mumbai suburban network by adding additional line capacity, such as the quadrupling of Virar Dahanu Road section of Western Railway, doubling of Panvel-Karjat section, and a new suburban corridor between Kalyan and Navi Mumbai.
This will be done using an elevated link between Airoli and Kalwa which will help passengers avoid changing trains at Thane. Trespass control will be done at 22 locations on Central and Western Railways, and 47 rakes of 12 cars each will also be bought under the project. These rakes will be connected by vestibules, have automatic door closing facility and LED lighting.
In addition, 1,496 PoS machines have also been ordered for tickets reservation counters, unreserved tickets, parcel booking and catering, ushering in electronic payments across Central Railway. Of this, about 400 have already been installed.
MoU with State
Indian Railways will also be signing MoUs with the Maharashtra government for 12 projects, three in Mumbai and nine in other locations.
These include the 72-km long Virar-Vasai-Panvel new double line, Bandra-Virar elevated corridor on a public-private-participation model (PPP), besides the Mumbai CST-Panvel elevated corridor totalling close ₹45000 crore.
Also being inked are nine projects for other areas in Maharashtra worth ₹22,000 crore: new lines for Ahmednagar-Beed-Parli, Wardha-Yavatmal-Nanded, Pune-Nashik, Gadchandur-Adilabad, Manmad-Dhule-Indore, Baramati- Lonand, Kolhapur-Vaibhavwadi, besides gauge conversion of Nagpur-Nagbhid.
(This article was published on December 23, 2016)

2691 views
Dec 28 2016 (16:38)
Foamer~   1903 blog posts
Re# 2108284-1            Tags   Past Edits
If these projects have been inaugurated, would Moderator/Admins please update the IRI atlas. Like for example Kolhapur-Vaibavwadi, Pune-Nashik etc....
-
Also Manoharabad-Kothapalli in Telangana for which foundation stone was laid in Aug. Thanks
Aug 06 2016 (21:28)  INTRODUCTION OF NEW WEEKLY TRAIN "TADOBA EXPRESS" BETWEEN LOKMANYA TILAK TERMINUS - KAZIPET Express (www.cr.indianrailways.gov.in)
back to top
New/Special TrainsSCR/South Central  -  IR Press Release  

News Entry# 276213   Blog Entry# 1957460     
   Tags   Past Edits
Aug 06 2016 (9:30PM)
Station Tag: Amravati (Terminal)/AMI added by 🚂महूअकोलाGC🚃/873766

Aug 06 2016 (9:30PM)
Station Tag: Akola Junction/AK added by 🚂महूअकोलाGC🚃/873766

Aug 06 2016 (9:28PM)
Station Tag: Nagpur Junction/NGP added by 🚂महूअकोलाGC🚃/873766

Aug 06 2016 (9:28PM)
Station Tag: Wardha Junction/WR added by 🚂महूअकोलाGC🚃/873766

Aug 06 2016 (9:28PM)
Station Tag: Thane/TNA added by 🚂महूअकोलाGC🚃/873766

Aug 06 2016 (9:28PM)
Station Tag: Than Junction/THAN added by 🚂महूअकोलाGC🚃/873766

Aug 06 2016 (9:28PM)
Station Tag: Lokmanya Tilak Terminus/LTT added by 🚂महूअकोलाGC🚃/873766

Aug 06 2016 (9:28PM)
Station Tag: Igatpuri/IGP added by 🚂महूअकोलाGC🚃/873766

Aug 06 2016 (9:28PM)
Station Tag: Kazipet Junction/KZJ added by 🚂महूअकोलाGC🚃/873766

Aug 06 2016 (9:28PM)
Station Tag: Chandrapur/CD added by 🚂महूअकोलाGC🚃/873766

Aug 06 2016 (9:28PM)
Station Tag: Adilabad/ADB added by 🚂महूअकोलाGC🚃/873766

Aug 06 2016 (9:28PM)
Station Tag: Kinwat/KNVT added by 🚂महूअकोलाGC🚃/873766

Aug 06 2016 (9:28PM)
Station Tag: Manmad Junction/MMR added by 🚂महूअकोलाGC🚃/873766

Aug 06 2016 (9:28PM)
Station Tag: Hazur Sahib Nanded/NED added by 🚂महूअकोलाGC🚃/873766

Aug 06 2016 (9:28PM)
Station Tag: Parbhani Junction/PBN added by 🚂महूअकोलाGC🚃/873766

Aug 06 2016 (9:28PM)
Station Tag: Jalna/J added by 🚂महूअकोलाGC🚃/873766

Aug 06 2016 (9:28PM)
Station Tag: Aurangabad/AWB added by 🚂महूअकोलाGC🚃/873766

Aug 06 2016 (9:28PM)
Train Tag: Krishna Express/17405 added by 🚂महूअकोलाGC🚃/873766

Aug 06 2016 (9:28PM)
Train Tag: Devagiri Express/17057 added by 🚂महूअकोलाGC🚃/873766

Aug 06 2016 (9:28PM)
Train Tag: Tapovan Express/17617 added by 🚂महूअकोलाGC🚃/873766

Aug 06 2016 (9:28PM)
Train Tag: Nandigram Express/11401 added by 🚂महूअकोलाGC🚃/873766

Posted by: 🚂अलविदा खंडवा मिटरगेज🙋🙋~  88 news posts
Ministry of Railways have decided to introduce ‘Tadoba Express’ a new weekly express train between Lokmanya Tilak Terminus and Kazipet
(A) LOKMANYA TILAK TERMINUS – KAZIPET TADOBA WEEKLY EXPRESS
TrainNo. 11083 Weekly Express will leave Lokmanya Tilak Terminus at 11.30 hrs o­n every Friday from 12.8.2016 and arrive Kazipet at 15.00 hrs next day.
TrainNo. 11084 Weekly Expresswill leave Kazipet at 17.45 hrs
...
more...
o­n every Saturday from 13.8.2016 and arrive Lokmanya Tilak Terminus at 23.15 hrs next day.
HALTS: Thane, Kalyan, Nasik Road, Manmad, Nagarsol, Lasur, Aurangabad, Jalna, Parbhani, Purna Jn., Hazur Sahib Nanded, Mudkhed, Bhokar, Himayat Nagar (Deccan), Kinwat, Adilabad, Pimpalkutti, Wani, Majri Khadan, Chandrapur, Ballarshah, Sirpur Kaghaznagar, Bellampalli, Manchiryal, Ramgundam, Peddapalli and Jammikunta.
COMPOSITION: One AC-2 Tier, Two AC-3 Tier, 8 Sleeper Class, 4 General Second Class, 2 General Second Class cum Guard’s Brake Vans.

* The inaugural special train 01183 will be flagged off remotely by Hon’ble Minister of Railways Shri Suresh Prabhu from Secunderabad. The inaugural special will leave Lokmanya Tilak Terminus at 08.00 hrs o­n 8.8.2016 and arrive Kazipet at 12.25 hrs next day. In return special train 01184 will leave Kazipet at 17.45 hrs o­n 9.8.2016 and arrive Lokmanya Tilak Terminus at 23.15 hrs next day.

RESERVATION: The bookings for inaugural special 01183 o­n special charges already open. The bookings for regular service of 11083 will commence from 8.8.2016 at all PRS centers and through Internet.

14748 views
Aug 10 2016 (13:14)
SHOW SOME THING NEW IN IMG TTS~   13208 blog posts   41 correct pred (48% accurate)
Re# 1957460-1            Tags   Past Edits
Who will take this train for long route and odd arrival time in LTT this will get 100% less patronage.
Jul 31 2016 (02:18)  Permanent Augmentation of Additional Chair Car Coaches to Six Express Trains (www.indiarailwayinfo.com)
back to top
Coach AugmentationsSCR/South Central  -  

News Entry# 275443     
   Tags   Past Edits
Jul 31 2016 (2:24AM)
Station Tag: Hazur Sahib Nanded/NED added by For Better Managed Indian Railways~/1546020

Jul 31 2016 (2:24AM)
Station Tag: Adilabad/ADB added by For Better Managed Indian Railways~/1546020

Jul 31 2016 (2:24AM)
Station Tag: Tirupati Main/TPTY added by For Better Managed Indian Railways~/1546020

Jul 31 2016 (2:24AM)
Station Tag: Secunderabad Junction/SC added by For Better Managed Indian Railways~/1546020

Jul 31 2016 (2:24AM)
Station Tag: Vijayawada Junction/BZA added by For Better Managed Indian Railways~/1546020

Posted by: For Better Managed Indian Railways~  948 news posts
South Central Railway will augment the following Express Trains by attaching additional Chair Car Coaches on permanent basis as per the details mentioned below:-
1. Train No. 12713 / 12714 Vijayawada-Secunderabad-Vijayawada Satavahana Express will be permanently augmented with two additional Chair Car Coaches from 30th July, 2016 Ex. Vijayawada and Secunderabad.
2. Train No. 17405 / 17406 Tirupati-Adilabad-Tirupati Krishna Express will be permanently augmented with one additional Chair Car Coach from 28th July, 2016 Ex. Tirupati and from 29th July Ex. Adilabad.
3.
...
more...
Train No. 17409 / 17410 Adilabad-Nanded-Adilabad Express will be permanently augmented with one additional Chair Car Coach from 29th July, 2016 Ex. Adilabad and Nanded.
Jul 27 2016 (13:13)  राज्य की अधूरी पड़ी 8 बड़ी रेल परियोजनाओं में वर्धा-यवतमाल-नांदेड़ रेल लाइन भी - www.bhaskar.com (www.bhaskar.com)
back to top
New Facilities/TechnologyCR/Central  -  

News Entry# 275012   Blog Entry# 1942997     
   Tags   Past Edits
Jul 27 2016 (1:13PM)
Station Tag: Nagbhir NG/NABN added by For Better Managed Indian Railways~/1546020

Jul 27 2016 (1:13PM)
Station Tag: Chiplun/CHI added by For Better Managed Indian Railways~/1546020

Jul 27 2016 (1:13PM)
Station Tag: Wadsa/WSA added by For Better Managed Indian Railways~/1546020

Jul 27 2016 (1:13PM)
Station Tag: Adilabad/ADB added by For Better Managed Indian Railways~/1546020

Jul 27 2016 (1:13PM)
Station Tag: Karad/KRD added by For Better Managed Indian Railways~/1546020

Jul 27 2016 (1:13PM)
Station Tag: Ahmadnagar/ANG added by For Better Managed Indian Railways~/1546020

Jul 27 2016 (1:13PM)
Station Tag: Wardha Junction/WR added by For Better Managed Indian Railways~/1546020

Jul 27 2016 (1:13PM)
Station Tag: Nasik Road/NK added by For Better Managed Indian Railways~/1546020

Jul 27 2016 (1:13PM)
Station Tag: Indore Junction BG/INDB added by For Better Managed Indian Railways~/1546020

Jul 27 2016 (1:13PM)
Station Tag: Manmad Junction/MMR added by For Better Managed Indian Railways~/1546020

Jul 27 2016 (1:13PM)
Station Tag: Pune Junction/PUNE added by For Better Managed Indian Railways~/1546020

Jul 27 2016 (1:13PM)
Station Tag: Nagpur Junction/NGP added by For Better Managed Indian Railways~/1546020

Posted by: For Better Managed Indian Railways~  948 news posts
मुंबई. राज्य में 8 बड़ी रेल परियोजनाएं वर्षों से अधूरी पड़ी हुई हैं। इनमें नागपुर-नागभीड़ व वर्धा-यवतमाल-नांदेड़ रेल लाइन भी शामिल हैं। विधानमंडल की लोकलेखा समिति की रिपोर्ट में यह बात सामने आई है। समिति के अध्यक्ष कांग्रेस विधायक गोपालदास अग्रवाल ने शुक्रवार को विधानमंडल के दोनों सदनों में यह रिपोर्ट पेश की। समिति ने यह भी कहा है कि इस संबंध में तीन महीने के भीतर क्या कदम उठाए गए, इसकी जानकारी समिति को दी जाए।
- समिति ने अपनी रिपोर्ट में बताया है कि इन रेल परियोजनाओं के लिए राज्य सरकार की हिस्सेदारी के तहत दी जाने वाली अधिकांश रकम दे दी गई है।
-
...
more...
एेसे में इन्हें जल्द से जल्द पूरा करने के लिए केंद्र व राज्य सरकार को मिल कर प्रयास करने की जरूरत है।
- समिति की सिफारिश में कहा गया है कि इन अधूरी परियोजनाओं को पूरा करते वक्त प्रादेशिक संतुलन का ध्यान रखा जाए।
गौरतलब है कि नागपुर-नागभीड़ गेज चौहरीकरण परियोजना को वर्ष 2012-13 में मंजूरी मिली थी। इसकी मूल लागत 376.21 करोड़ थी।
- इसके लिए राज्य सरकार को 50 फीसदी रकम यानी 188.11 करोड़ रुपए देना है।
- समिति को पता चला कि इन परियोजनाओं के लिए 70 फीसदी भूमि अधिग्रहण का कार्य पूरा होने के बाद ही निर्माण कार्य शुरू हो सकता है और जबतक निर्माण कार्य शुरू नहीं होता, तब तक परियोजना के पूरा होने के लिए समय सीमा तय नहीं की जा सकती।
- भूमि अधिग्रहण के बगैर ठेकेदारों को ठेके भी नहीं दिए जा सकते। समिति ने इस संबंध तीन माह के भीतर उठाए गए कदमों की जानकारी मांगी है।
ये हैं लंबित रेल परियोजनाएं
नागपुर-नागभीड़ 106.15 किमी
मनमाड-धुले-इंदौर 350 किमी
पुणे-नाशिक 255 किमी
वर्धा-यवतमाल-नांदेड़ 284 किमी
अहमदनगर-बीड़-परली बैजनाथ 261 किमी
कराड-चिपलूण 111.5 किमी
आदिलाबाद-गडचांदूर 59 किमी
वडसा-देसाईगंज-गड़चिरोली 261 किमी

6750 views
Jul 27 2016 (13:20)
® राहुल जैन ☺ झाडू वाले™🚅🚃🚃🚃🚃🚃*^~   10182 blog posts   14939 correct pred (63% accurate)
Re# 1942997-1            Tags   Past Edits
gr8
Jul 10 2016 (19:39)  Railways announce special trains to Pandharpur for Ekadashi (timesofindia.indiatimes.com)
back to top
New/Special TrainsSCR/South Central  -  

News Entry# 273331     
   Tags   Past Edits
Jul 10 2016 (7:39PM)
Station Tag: Akola Junction/AK added by Vaibhav Agarwal*^/432532

Jul 10 2016 (7:39PM)
Station Tag: Adilabad/ADB added by Vaibhav Agarwal*^/432532

Jul 10 2016 (7:39PM)
Station Tag: Pandharpur/PVR added by Vaibhav Agarwal*^/432532

Posted by: Vaibhav Agarwal*^  1403 news posts
Aurangabad: The Nanded division of South Central Railway (SCR) has announced special trains for Pandharpur to clear the rush of passengers visiting the temple town on the occasion of Ashadhi Ekadashi.
Accordingly, the Adilabad-Pandharpur-Adilabad train will make two trips. It will leave Adilabad on July 14 at 3.40 pm and will reach Pandharpur next day in morning at 9.05 via Nanded and Kinwat.
In its return journey, the train (number 07502) will leave from Pandharpur on July 16 at 7.30 am and will reach Nanded 9pm and at Adilabad next day at 2
...
more...
am.
A train between Nagarsol and Pandharpur is another special train the SCR has announced for the benefit of devotees. It is scheduled to make two trips. Train (number 07515) will leave from Nagarsol at 3 pm on July 14. It will reach Aurangabad at 4.30 pm on same day and proceed for further journey after halt of nearly 15 minutes. The train is scheduled to reach Pandharpur next day at 6.30 am, an official release said.
In its return journey, the train (number 07516) will leave temple town at 9.50 am on July 16. It is scheduled to reach Aurangabad at 12.05 am next day and at final destination by 2.30 am.
A train between Akola and Pandhapur is another special train the SCR will be pressing into service.
Accordingly, train (number 07523) will depart from Akola at 1.50 pm on July 14. It will reach Parbhani at 7.55 pm.
Authorities said the train will be connected with Nagarsol-Aurangabad train (number 07515) at Parbhani. While returning, the train will be converted into train number 07516. At Parbhani, it will be train number 07524 before heading towards Akola where it is scheduled to reach at 2.30 am.
All these trains will have 10 coaches. SCR authorities have appealed passengers to take benefit of these special trains.
Page#    Showing 1 to 16 of 16 News Items  

Scroll to Top
Scroll to Bottom


Go to Desktop site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.