Full Site Search  
Mon Mar 27, 2017 08:30:00 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Large Station Board;
Large Station Board;

AKJ/AkbarGanj (1 PFs)
اکبر گنج     अकबर गंज

Track: Construction - Electric-Line Doubling

Type of Station: Regular
Number of Platforms: 1
Number of Halting Trains: 12
Number of Originating Trains: 0
Number of Terminating Trains: 0
SH 31
State: Uttar Pradesh
Elevation: 112 m above sea level
Zone: NR/Northern
Division: Lucknow Charbagh NR
No Recent News for AKJ/AkbarGanj
Nearby Stations in the News

Rating: /5 (0 votes)
cleanliness - n/a (0)
porters/escalators - n/a (0)
food - n/a (0)
transportation - n/a (0)
lodging - n/a (0)
railfanning - n/a (0)
sightseeing - n/a (0)
safety - n/a (0)

Nearby Stations

SYW/Sindurwa 8 km     CHBS/Chaubisi 9 km     NHH/Nihalgarh 15 km     HGH/Haidergarh 17 km     WGJ/Waris Ganj 22 km     AHZ/Adhinpur 25 km     TEG/Tirbediganj 25 km     CDRL/Chhandrauli 33 km     MFKA/Musafir Khana 34 km    

Station News

Page#    Showing 1 to 4 of 4 News Items  
Jan 03 2015 (09:19)  ट्रैक पर नहीं आया रेल का सपना (www.jagran.com)
back to top
Commentary/Human InterestNR/Northern  -  

News Entry# 207418     
   Tags   Past Edits
Jan 03 2015 (5:11PM)
Station Tag: Maharajganj/MGZ added by Soon electrified triple line SNT RPH**/401739

Jan 03 2015 (5:11PM)
Station Tag: Rae Bareli Junction/RBL added by Soon electrified triple line SNT RPH**/401739

Jan 03 2015 (5:11PM)
Station Tag: AkbarGanj/AKJ added by Soon electrified triple line SNT RPH**/401739

Posted by: 4πu¶am*^~  4373 news posts
महराजगंज क्षेत्र में रेल लाइन का सपना सजोए बैठे लोगों का यह सपना 2014 में भी सपना ही रह गया। काग्रेस अध्यक्ष सोनिया गांधी द्वारा रेल लाइन शिलान्यास के बाद भी योजना को बल नहीं मिल सका। बहरहाल क्षेत्र की जनता अभी भी इस क्षेत्र में रेल लाइन दौड़ने की उम्मीद लेकर बैठी हुई है।
रायबरेली अकबरगंज वाया महराजगंज रेलवे लाइन बनाने के लिए कंाग्रेस की सरकार में घोषणा की गई थी। यही नहीं इस परियोजना को बल देने के लिए जिले की सासंद सोनिया गाधी व रेलवे बोर्ड के चेयरमैन ने 2 दिसंबर 2013 को महराजगंज के हनुमान गढ़ी मंदिर के पास जिले की विभिन्न रेलवे लाइनों का शिलान्यास किया था। इसके लिए एक सप्ताह पूर्व से ही शिलान्यास स्थल पर
...
more...
तैयारिया भी की गई। तैयारियों में विभाग का लाखों रूपये का खर्च भी हुआ। एक साल बीतने के बाद भी रेलवे लाइन की इस परियोजना को बल नही मिल सका।
मात्र सर्वे तक ही सिमट गई योजना : रायबरेली अकबरगंज वाया महराजगंज रेलवे लाइन 69 किमी की परियोजना तय की गई है। इसके लिए सरकार ने 654 करोड़ की लागत तय की है। योजना के शिलान्यास के बाद प्रगति की बात की जाए तो कुछ दिनों तक सर्वे किया गया बाद मे सब कुछ शून्य ही दिखा।
चार स्टेशन बनने की भी हुई घोषणा : इस रेल लाइन मे सेमरौता, मउ महराजगंज व लोधवामऊ में स्टेशन बनने की भी घोषणा की गई है। इसके लिए विभाग जमीन तक नहीं तलाश पाया है। बताते है कि इसके लिये भी विभाग ने सर्वे किया है। बहरहाल भूमि का स्थानान्तरण की कोई पुष्टि नही हो रही है।
पिछली सरकार मे मिले थे 20 करोड़ : रेलवे लाइन के बावत काग्रेस पार्टी से विधायक रहे पूर्व विधायक राजा राम त्यागी की माने तो पिछली सरकार में 20 करोड़ रूपये आंवटित किये थे। सरकार बदल जाने के बाद कोई पता नहीं लग सका है।
एसडीएम बोले
योजना के बावत एसडीएम राकेश गुप्ता ने कहा कि रेलवे लाइन संबन्धित किसी प्रकार के भूमि अधिग्रहण आदि के लिये कोई सुचना विभाग से अब तक नही आई है। न ही इस सबंध में कोई दिशा निर्देश ही है।
Dec 03 2013 (13:33)  CHAIRPERSON UPA SMT SONIA GANDHI LAYS FOUNDATION STONE FOR NEW BG RAIL DEVELOPMENT PROJECT BETWEEN RAE BARELI-MAHARAJGANJ-AKBARGANJ (www.nr.indianrailways.gov.in)
back to top
New Facilities/TechnologyNR/Northern  -  IR Press Release  

News Entry# 159026     
   Tags   Past Edits
Dec 03 2013 (3:27PM)
Station Tag: AkbarGanj/AKJ added by moderator**/12

Dec 03 2013 (3:27PM)
Station Tag: Rae Bareli Junction/RBL added by moderator**/12

Posted by: Jayashree ❖ Amita*^  35859 news posts
CHAIRPERSON UPA SMT SONIA GANDHI LAYS FOUNDATION STONE FOR NEW BG RAIL DEVELOPMENT PROJECT BETWEEN RAE BARELI-MAHARAJGANJ-AKBARGANJ
Hon’ble Chairperson, UPA, Smt. Sonia Gandhi today laid the foundation stone for development of a new broad-gauge rail line between Rae Bareli-Maharajganj-Akbarganj o­n Northern Railway at a function held at Maharajganj, Rae Bareli district. Shri Arunendra Kumar, Chairman Railway Board, Shri V.K.Gupta, General Manager, Northern Railway, Shri Jagdip Rai, Divisional Railway Manager, Northern Railway, Lucknow, Senior Railway officers, staff and citizens of Salon were also present o­n the occasion.
...
more...
As part of its committed agenda to extend the rail network to the hinterlands of important districts and in keeping with the budgetary planning for this region, Northern Railway will commence the construction of the 46.9 km. long new BG rail line, Rae Bareli-Akbarganj via Maharajganj. This new rail line at an estimated cost of Rs. 296 crore is part of the 116 km long Lalganj-RaeBareli-Akbarganj-Faizabad new rail project. Rae Bareli-Akbarganj section will have 04 railway stations enroute viz Simrauta, Mau Garbi, Maharajganj & Lodhwa Mau in District Rae Bareli & Amethi. All 4 stations en route will have 3 line yards (2 loop lines & o­ne main line at each station). Each station will have 02 passenger platforms, control panel, standard-III interlocking and MACL signaling. The alignment passes over network of Sharda canal and its feeder channels spread in the area and also crosses National Highways-56 & 24B and State Highways-13 & 13A. There are total 81 bridges over water streams, of which, 12 are major bridges. There are 47 road crossings, of which, 32 are road under bridges, 6 are road over bridges and 9 are level crossings.
Topographic Survey of the proposed rail line has been done by Differential GPS followed by detailed traversing using Total Station and detailed leveling using Auto level. The route is designed for speed potential of 100 KMPH, with ruling gradient of 1 in 150 (C) and maximum degree of curvature upto 20. Bridges will be designed for 25 Ton loading standards.
With this new rail line progressively extending to Faizabad in the North direction and Lalganj towards the West, consequential operational benefits will accrue including the potential to increase its fleet of trains in these routes and also effectively utilize the upcoming double line routes thereby easing congestion in the important junction stations of Lucknow, Varanasi and Allahabad. The new rail line is also expected to provide an alternate route for loading from Sindurwa to the western sector.
To strengthen the rail network in this busy route, Northern Railway is concurrently pursuing doubling projects between Raebareli - Utaratia (66 Km-sanctioned in the year 2012-13 at an approx. cost of Rs. 260 cr), between Raebareli –Amethi (60 Km- sanctioned in the year 2013-14 at an approx. cost of Rs. 286 crore and doubling projects in the adjoining areas viz. Srikrishanagar-Sultanpur-Chandrauli (148Km- sanctioned in year 2006-07 at an approx. cost of Rs. 370 Crores) and Phaphamau-Allahabad (13 Kms.) including bye-pass line sanctioned in year 2009-10 at Rs. 145 Crores.
Along with upcoming new rail line projects viz. Faizabad-Akbarganj(69 km- sanctioned in the year 2013-14 at an approx. cost of Rs. 654 cr), Unchahar-Amethi (66 Km- sanctioned in the year 2012-13 at an approx. cost of Rs. 380 cr), Sultanpur –Amethi ( 29 km- sanctioned in the year 2011-12 at an approx. cost of Rs. 297 cr and Sultanpur-Kadipur( 39 km- sanctioned in the year 2013-14 at an approx. cost of Rs. 297 cr) in the contiguous areas, this region is set to witness noteworthy development in the coming years.
Through a well-knit railway in this region, Northern envisages to bring in greater socio-economic progress.
Dec 02 2013 (23:47)  Sonia lays foundation of rail line between Rae Bareli and Akbarganj (www.thehindu.com)
back to top
New Facilities/TechnologyNR/Northern  -  

News Entry# 158930     
   Tags   Past Edits
Dec 03 2013 (1:40AM)
Station Tag: AkbarGanj/AKJ added by moderator**/12

Dec 03 2013 (1:40AM)
Station Tag: Rae Bareli Junction/RBL added by moderator**/12

Posted by: rdb*^  127151 news posts
UPA Chairperson Sonia Gandhi on Monday laid the foundation for construction of a new broad gauge (BG) rail line between Rae Bareli and Akbarganj in Uttar Pradesh.
“The construction work on the 46.9 km-new BG rail line from Rae Bareli to Akbarganj through Maharajgunj will commence soon,” said a senior Northern Railway official adding, “The route is being designed for speed potential of 100 km per hour.”
Estimated to cost Rs. 296 crores, the new line is part of the 116km Lalganj-Rae Bareli-Akbarganj-Faizabad rail project.
There
...
more...
will be total four stations along the Rae Bareli-Akbarganj route at Simrauta, Mau Garbi, Maharajganj and Lodhwa Mau.
According to the official, each station will have two passenger platforms and modern signalling system.
The rail connectivity is crucial for the transportation network in the region as it crosses National Highways 56 and 24B, and State Highways 13 and 13A. It also passes over network of Sharda canal and its feeder channels spread across the area.
In order to strengthen the rail network in the busy route, several key projects like doubling between Rae Bareli and Utaratia and between Rae Bareli and Amethi are being taken up.
Nov 22 2013 (15:53)  13 अरब 31 करोड़ से बनेंगे तीन रेल पथ (www.jagran.com)
back to top
Commentary/Human InterestNR/Northern  -  

News Entry# 157627   Blog Entry# 1328536     
   Tags   Past Edits
Nov 22 2013 (4:38PM)
Station Tag: AkbarGanj/AKJ added by অনুপম**/401739

Nov 22 2013 (4:38PM)
Station Tag: Unchahar Junction/UCR added by অনুপম**/401739

Nov 22 2013 (4:38PM)
Station Tag: Shahganj Junction/SHG added by অনুপম**/401739

Nov 22 2013 (4:38PM)
Station Tag: Faizabad Junction/FD added by অনুপম**/401739

Nov 22 2013 (4:38PM)
Station Tag: Rae Bareli Junction/RBL added by অনুপম**/401739

Nov 22 2013 (4:38PM)
Station Tag: Amethi/AME added by অনুপম**/401739

Nov 22 2013 (4:38PM)
Train Tag: Sultanpur - Lucknow MEMU/64281 added by অনুপম**/401739

Nov 22 2013 (4:38PM)
Train Tag: Lucknow - Sultanpur MEMU/64282 added by অনুপম**/401739

Nov 22 2013 (4:38PM)
Train Tag: Pratapgarh - Lucknow DEMU/74201 added by অনুপম**/401739

Nov 22 2013 (4:38PM)
Train Tag: Lucknow - Pratapgarh DEMU/74202 added by অনুপম**/401739

Posted by: 4πu¶am*^~  4373 news posts
सलोन के लोग अब खुद को अमेठी से दूर नहीं महसूस करेंगे। सलोन को सीधे अमेठी से रेलवे लाइन के द्वारा जोडने की कवायद अंतिम दौर में पहुंच गई है। इतना ही नहीं रायबरेली से तिलोई, बाजार शुकुल व फैजाबाद को जोडने की योजना का शुभारंभ अगले सप्ताह सांसद राहुल गांधी के हाथों होने जा रहा है। रेलवे महकमें के साथ ही राहुल गांधी की टीम भी अमेठी में 13 अरब 31 करोड की लागत से बिछने वाली रेलवे पथ के शुभारंभ को ऐतिहासिक बनाना चाहती है।
शाहगंज से ऊंचाहार को अमेठी व सलोन के रास्ते जोड़ने की योजना है। इस रूट की कुल लम्बाई 67 किलोमीटर है। इस रेलवे लाइन के निर्माण पर रेल मंत्रालय 380 करोड रूपये खर्च कर सलोन
...
more...
व अमेठी की दूरी को कम करेगा। दूसरी रेलवे लाइन रायबरेली से निकलकर तिलोई के रास्ते अकबरगंज इन्हौना पहुंचेगी। इस रेल खंड की कुल दूरी 47 किमी होगी। इस पर रेल मंत्रालय 296 करोड रूपये खर्च करेगा। वहीं अकबरगंज को अमेठी के बाजार शुकु ल के रास्ते फैजाबाद से जोडा जायेगा। जिसकी कुल दूरी 69 किमी है। इस पर रेल मंत्रालय 655 करोड रूपये खर्च करेगा। इन तीन बडी परियोजनाओं की शुरूआत अगले सप्ताह होगी। राहुल गांधी से जुडे सूत्रों की माने तो पार्टी उपाध्यक्ष तीनों योजनाओं की शुरूआत अगले सप्ताह 25-26 नवंबर को करेंगे। इन तीनों रेलवे लाइनों के निर्माण के बाद अमेठी संसदीय क्षेत्र का हर ब्लाक रेलवे रूट पर होगा।
अगले सप्ताह से चलेगी डेमू व मेमू
लखनऊ-प्रतापगढ़ वाया रायबरेली-अमेठी के बीच चलने वाली डेमू ट्रेन अगले सप्ताह किसी दिन शुभारंभ हो सकता है। इस ट्रेन के चलने से लोगो को काफी राहत मिलेगी। काफी दिनों से लोगो को इस ट्रेन का इंतजार था। दैनिक यात्रियों के लिए यह ट्रेन काफी सहुलियत देगी। वहीं मेमू लखनऊ-सुल्तानपुर वाया जगदीशपुर होते हुए चलेगी। सूत्रों की माने तो इन दोनो ट्रेनों का शुभारंभ भी सांसद राहुल गांधी के हाथों होगा।
जल्द मिलेंगी सौगात
अमेठी सांसद राहुल गांधी जल्द ही अमेठी में अपनों के बीच रेलवे की तीन बड़ी परियोजनाओं की शुरूआत करेंगे। वह अगले सप्ताह किसी भी दिन आ सकते है।
चंद्रकांत दुबे
प्रतिनिधि, सांसद राहुल गांधी

1 posts - Fri Jan 02, 2015 - are hidden. Click to open.

1999 views
Jan 12 2015 (01:12)
मोहम्मद राशिद खान*^~   5511 blog posts   8017 correct pred (86% accurate)
Re# 1328536-2            Tags   Past Edits
Not known but Akbarpur Kadipur Sultanpur, new line survey been done
Page#    Showing 1 to 4 of 4 News Items  

Scroll to Top
Scroll to Bottom


Go to Desktop site