Full Site Search  
Fri May 26, 2017 20:39:01 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Large Station Board;
Large Station Board;

ALU/Ariyalur (2 PFs)
அரியலூர்     अरियालुर

Track: Double Electric-Line

Type of Station: Regular
Number of Platforms: 2
Number of Halting Trains: 34
Number of Originating Trains: 0
Number of Terminating Trains: 0
Perambalur Road, Ariyalur
State: Tamil Nadu
Elevation: 76 m above sea level
Zone: SR/Southern
Division: Tiruchchirappalli
No Recent News for ALU/Ariyalur
Nearby Stations in the News

Rating: 1.9/5 (16 votes)
cleanliness - good (2)
porters/escalators - poor (2)
food - poor (2)
transportation - poor (2)
lodging - poor (2)
railfanning - average (2)
sightseeing - average (2)
safety - poor (2)

Nearby Stations

SLTH/Sillakkudi 7 km     OTK/Ottakovil 9 km     VER/Vellur Halt 14 km     KLGM/Kallagam 15 km     SNDI/Sendurai 18 km     KKPM/Kallakkudi Palanganatham 24 km     MTUR/Mathur 26 km     PMB/Pullambadi 29 km     ICG/Ichchangadu 32 km     PNDM/Pennadam 35 km    

Station News

Page#    Showing 1 to 20 of 21 News Items  next>>
Apr 24 2017 (16:34)  ரயில் மோதி ஜல்லிக்கட்டு காளை பலி (m.dinamalar.com)
back to top
Major Accidents/DisruptionsSR/Southern  -  

News Entry# 300630     
   Tags   Past Edits
Apr 24 2017 (16:34)
Station Tag: Ariyalur/ALU added by sGs*^~/41440

Apr 24 2017 (16:34)
Station Tag: Kallagam/KLGM added by sGs*^~/41440

Posted by: sGs*^~  215 news posts
அரியலூர்: அரியலூர் அருகே, ரயில் மோதி, ஜல்லிக்கட்டு காளை உயிரிழந்தது.
அரியலூர் மாவட்டம், கோக்குடி கிராமத்தில், நேற்று ஜல்லிக்கட்டு நடந்தது; 100க்கும் மேற்பட்ட காளைகள் பங்கேற்றன. கோக்குடி வயல் பகுதியில் அமைக்கப்பட்டிருந்த வாடிவாசலில் இருந்து, ஒவ்வொரு காளையாக, அவிழ்த்து விடப்பட்டன.சேலம் மாவட்டத்தைச் சேர்ந்த, ராஜு என்பவரது காளை, மாடுபிடி வீரர்களிடையே துள்ளியோடியது. இக்காளையை அடக்க, மாடுபிடி வீரர்கள் முயற்சித்தனர். அவர்களிடம் இருந்து தப்பி, கல்லகம் ரயில் நிலையம் அருகே ஓடியது. அப்போது, அவ்வழியே சென்ற பல்லவன் எக்ஸ்பிரஸ் ரயில், காளை மீது மோதியது. இதில், சம்பவ இடத்திலேயே காளை உயிரிழந்தது.
Mar 28 2017 (11:51)  இருவழி அகல ரெயில்பாதை பணியால் குருவாயூர், வைகை எக்ஸ்பிரஸ் ரெயில்கள் தாமதம் (www.dailythanthi.com)
back to top
Other NewsSR/Southern  -  

News Entry# 297885     
   Tags   Past Edits
Mar 28 2017 (11:51)
Station Tag: Ariyalur/ALU added by emailconnect2hari/1069947

Mar 28 2017 (11:51)
Station Tag: Tiruchchirappalli Junction/TPJ added by emailconnect2hari/1069947

Mar 28 2017 (11:51)
Train Tag: Chennai Egmore - Guruvayur Express/16127 added by emailconnect2hari/1069947

Mar 28 2017 (11:51)
Train Tag: Vaigai SF Express/12635 added by emailconnect2hari/1069947

Posted by: emailconnect2hari  302 news posts
அரியலூர் அருகே மாத்தூரில் இருந்து விருதாச்சலம் வரை இருவழி அகல ரெயில்பாதை அமைக்கும் பணி இறுதிகட்டத்தை எட்டி உள்ளது. இந்த பாதையில் தண்டவாள இணைப்பு பணி இன்று (செவ்வாய்க்கிழமை) மாலையுடன் முடிகிறது. இந்தநிலையில் இருவழி அகல ரெயில்பாதை அமைக்கும் பணியின் காரணமாக
மார்ச் 28, 04:00 AM
திருச்சி,
அரியலூர் அருகே மாத்தூரில் இருந்து விருதாச்சலம் வரை இருவழி அகல ரெயில்பாதை அமைக்கும் பணி இறுதிகட்டத்தை எட்டி உள்ளது. இந்த பாதையில் தண்டவாள இணைப்பு பணி இன்று (செவ்வாய்க்கிழமை) மாலையுடன் முடிகிறது. இந்தநிலையில் இருவழி அகல ரெயில்பாதை அமைக்கும்
...
more...
பணியின் காரணமாக திருச்சி ஜங்‌ஷன் ரெயில் நிலையத்துக்கு நேற்று பகல் 1.15 மணிக்கு வரவேண்டிய குருவாயூர் எக்ஸ்பிரஸ் ரெயில் 2 மணி நேரம் 20 நிமிடங்கள் தாமதமாக மாலை 3.35 மணிக்கு வந்தது. பின்னர் திருச்சியில் இருந்து 3.40 மணிக்கு புறப்பட்டு சென்றது. இதேபோல் சென்னையில் இருந்து மாலை 6.30 மணிக்கு திருச்சி வரவேண்டிய வைகை எக்ஸ்பிரஸ் ரெயில் ஒரு மணிநேரம் தாமதமாக இரவு 7.30 மணிக்கு திருச்சி வந்தது. பின்னர் அந்த ரெயில் திருச்சியில் இருந்து 7.35 மணிக்கு புறப்பட்டு சென்றது.
Mar 25 2017 (08:26)  Work on expansion of Ariyalur station apace (www.thehindu.com)
back to top
Commentary/Human InterestSR/Southern  -  

News Entry# 297512     
   Tags   Past Edits
Mar 25 2017 (08:27)
Station Tag: Ariyalur/ALU added by karbang~/50057

Posted by: karbang~  162 news posts
Platform length raised; coach display signs provided
Work on expansion of the Ariyalur railway station has been in full swing and will be completed by April.
The project is part of the doubling of the track between Villupuram and Dindigul carried out by Rail Vikas Nigam Limited, a Government of India enterprise, at an estimated cost of ₹1,200 crore.
The station, which had a
...
more...
single platform, has now three of 550 metres long each. “The original platform was just 50 metres short in length and we increased the length to suit the number of coaches in superfast express trains,” an official told ‘The Hindu’ on Thursday. Ariyalur was one of the stations that was given a facelift due to the doubling of the track. New stations were constructed and infrastructure developed at Kallagam, Thazhanallur, Pennadam and Mathur. High-level platforms were constructed at these stations. Passenger amenities such as coach display boards have also been provided, he said.
Work on expansion of Ariyalur railway station is in full swing and will be completed by April.
The work, which forms part of track doubling between the 270-km-long Villupuram and Dindigul at an estimate of ₹1,200 crore, is being executed by Rail Vikas Nigam Limited, a Government of India enterprise.
The station, which had only a single platform, now has three platforms of 550-metre-long each. “The original platform was just 50 metres short and we increased the length to accommodate super-fast express trains,” an official told The Hindu on Thursday.
Ariyalur is one of the stations which has been given a facelift along with the track doubling work. New stations have been constructed and infrastructure augmented at Kallagam, Thazhanallur, Pennadam, Mathur. High-level platforms had been constructed at these stations which would have coach display signs, the official said
Jul 25 2016 (09:36)  Have sought Jaya’s support for joint ventures: Suresh Prabhu (www.deccanchronicle.com)
back to top
New Facilities/TechnologySR/Southern  -  

News Entry# 274764     
   Tags   Past Edits
Jul 25 2016 (9:36AM)
Station Tag: Tiruvalangadu/TO added by For Better Managed Indian Railways~/1546020

Jul 25 2016 (9:36AM)
Station Tag: Tiruvallur/TRL added by For Better Managed Indian Railways~/1546020

Jul 25 2016 (9:36AM)
Station Tag: Mathur/MTUR added by For Better Managed Indian Railways~/1546020

Jul 25 2016 (9:36AM)
Station Tag: Ariyalur/ALU added by For Better Managed Indian Railways~/1546020

Jul 25 2016 (9:36AM)
Station Tag: Chennai Central/MAS added by For Better Managed Indian Railways~/1546020

Posted by: For Better Managed Indian Railways~  948 news posts
Chennai: Union Railway Minister Suresh Prabhu has written to Tamil Nadu Chief Minister J. Jayalalithaa seeking the state government's involvement in working jointly with railways to improve infrastructure and bring in more development.
“I look forward to her support on the same," Prabhu said. Neighboring states of Andhra Pradesh, Telangana and Karnataka have agreed to join hands with railways for joint ventures for developing railways in their states,” he said.
“Indian Railways is seeing development and investment like it has never seen before,” Prabhu said while addressing audience at Chennai Central. “We have
...
more...
decided to increase the investment worth over Rs 8 lakh crores in the next four years to make railways more people friendly and modernised.”
“We have increased fund allocation for Tamil Nadu to Rs 2,718 crores this year. If a programme like Talgo is successful for Delhi and Mumbai, Chennai can also be considered for high-speed rail connectivity,” he added. Prabhu said he needed the state's support in commencing work on doubling lines between Madurai, Kanyakumari and Trivandrum.
He said that he looks forward to develop Royapuram railway station as a terminal in the city. “Along with the state government, we can develop a railway station to be better than any airport. I request the state government to provide us land for this project.”
On Sunday, the minister also inaugurated the fourth line between Tiruvalangadu and Tiruvallur, and the doubling of 25-km line between Ariyalur and Mathur.
“It is necessary to increase revenue but also to reduce costs. Electrification of lines plays a major role as one of the major goals of railways is to bring down fuel costs,” he said.
Jul 22 2016 (06:56)  Inquiry ordered into action of loco pilot (www.thehindu.com)
back to top
New Facilities/TechnologySR/Southern  -  

News Entry# 274456     
   Tags   Past Edits
Jul 22 2016 (6:57AM)
Station Tag: Mathur/MTUR added by rdb*^/69261

Jul 22 2016 (6:57AM)
Station Tag: Ariyalur/ALU added by rdb*^/69261

Posted by: rdb*^  129373 news posts
The railway authorities have ordered an inquiry into an incident wherein a loco pilot of the Kanyakumari – Chennai Express overshot the red signal at the starter point at Mathur railway station and entered the non-electrified track leading to detention of train and few others in the early hours of Wednesday. Power supply to the electric locomotive too got cut
Loco pilot Edwin Sahayaraj and Assistant Loco Pilot Sivaraj have been placed under suspension.
Sources said the Kanyakumari-Chennai Express (train No. 12634) was regulated at Road No. 3 at Mathur railway station for
...
more...
crossing of the Chennai – Mangalore Express (train No. 16859) at around 2.30 a.m. without any delay. A relief locomotive from Sendurai was brought to the spot and pulled the formation of the Kanyakumari Express from the sand hump. The train was hauled using a diesel locomotive up to Chennai. The train suffered detention for over two hours due to the incident.
Four other trains also suffered detention en-route for over two hours.
Sources said the Loco Pilot and Assistant Loco Pilot were sent for medical examination to Vriddhachalam. A detailed inquiry would be conducted by the authorities concerned in this regard.
Jul 22 2016 (06:56)  Minister to dedicate double line on Sunday (www.thehindu.com)
back to top
New Facilities/TechnologySR/Southern  -  

News Entry# 274455   Blog Entry# 1937224     
   Tags   Past Edits
Jul 22 2016 (6:56AM)
Station Tag: Tiruvennainallur/TVNL added by rdb*^/69261

Jul 22 2016 (6:56AM)
Station Tag: Villupuram Junction/VM added by rdb*^/69261

Jul 22 2016 (6:56AM)
Station Tag: Mathur/MTUR added by rdb*^/69261

Jul 22 2016 (6:56AM)
Station Tag: Ariyalur/ALU added by rdb*^/69261

Posted by: rdb*^  129373 news posts
Between Ariyalur and Mathur; double line between Villupuram and Tiruvennainallur to be ready in a month or two
The Railway Minister Suresh Prabhakar Prabhu will dedicate the second line between Ariyalur and Mathur, a 25-km electrified stretch on the 273 kilometre-long Villupuram-Tiruchi-Dindigul section where track doubling work was under way, to nation through video conferencing from Chennai on July 24.
Divisional railway officers from Tiruchi are expected to be at Ariyalur station on that day.
The
...
more...
Villupuram-Dindigul doubling project is being executed by the Rail Vikas Nigam Limited (RVNL) on different stretches simultaneously. The first portion to be commissioned a few years ago under the project was the stretch from Valadi to Ariyalur (50 km). Thereafter, the double line in the portion from Vriddhachalam to Tiruvennainallur was thrown open to traffic after obtaining safety clearance from the Commissioner of Railway Safety (CRS). Later, the CRS inspected the line from Ariyalur to Mathur falling in the Villupuram – Tiruchi chord line section in March.
The remaining portions where doubling works were on were Villupuram - Tiruvennainallur; Vriddhachalam – Mathur and Valadi to Tiruchi. RVNL authorities say the double line works were in the advanced stage between Villupuram and Tiruvennainallur.
Officials exude hope that the double line between Villupuram and Tiruvennainallur would be ready in a month or two before inviting the CRS for inspection. Doubling works were proceeding swiftly between Valadi and Tiruchi and from Vriddhachalam to Mathur, say the authorities adding that the works would be completed before the end of the current fiscal.
There were some issues pertaining to land acquisition in the portion from Manapparai to Tamaraipadi, the sources said. The RVNL is executing the Villupuram – Dindigul doubling project at an estimated cost of Rs. 1,200 crore.
Laying of a double line would ease congestion in the chord line section especially during night when movement of train services reaches its peak and eventually lead to reduction in travel time, say officials.

3482 views
Jul 22 2016 (06:56)
rdb*^   31277 blog posts   374037 correct pred (80% accurate)
Re# 1937224-1            Tags   Past Edits
Good! Nice to know!
Mar 23 2016 (08:15)  Track doubling between Ariyalur and Mathur over (m.timesofindia.com)
back to top
Other NewsSR/Southern  -  

News Entry# 262201     
   Tags   Past Edits
Mar 23 2016 (8:15AM)
Station Tag: Ariyalur/ALU added by Faiz/953850

Posted by: Faiz~  22 news posts
Trichy: Rail doubling work on a 23-km stretch between Ariyalur and Mathur out of the total 272 km from Villupuram to Dindigul has been completed. Commissioner of railway safety (CRS) S K Mittal, southern circle, from Bangalore conducted the inspection on Monday.
Yet, it will take a long time to use the stretch because the railways is still struggling with land acquisition problems. The Rs 1,200-crore project, which began in 2013, is to be completed by March 2017. With the slow pace of work, this target may not be met
TIMES OF INDIA
...
more...

CITY
AA
Track doubling between Ariyalur and Mathur over
TNN | 2 mins ago
WhatsappFacebookGoogle PlusTwitterEmailLinkedinSMS
SHARE
Trichy: Rail doubling work on a 23-km stretch between Ariyalur and Mathur out of the total 272 km from Villupuram to Dindigul has been completed. Commissioner of railway safety (CRS) S K Mittal, southern circle, from Bangalore conducted the inspection on Monday.
Yet, it will take a long time to use the stretch because the railways is still struggling with land acquisition problems. The Rs 1,200-crore project, which began in 2013, is to be completed by March 2017. With the slow pace of work, this target may not be met.
The railway authorities have issued a warning to residents along the stretch not to cross the tracks during the high speed trial. A train was run between Ariyalur and Mathur at a speed of 120 km per hour. The authorities inspected the signals, tracks and electricity cables. Divisional railway manager A K Agarwal was present during the inspection.
A senior engineer from Rail Vikas Nigam Limited (RVNL) said, "The doubling was completed a few months ago and was awaiting CRS inspection, which was done on Monday."
As part of doubling works undertaken by RVNL, two sections between Valadi and Kallakudi Palanganatham and between Kallakudi and Ariyalur have completed and trains are being operated on these stretches after the successful completion of inspection by the commissioner of railway safety. The 36-km stretch between Trichy and Mannaparai have also been given the green signal.
Thanjavur District Rail Users Association secretary A Giri said that in a survey that was conducted by the railway a few years ago, it was found that the railway has been utilising the single line at a rate of 130 percentage, which is more than the capacity, leading to the cracks. The doubling works are however under way at a snail's pace along the section, he added.
Mar 18 2016 (16:58)  INSPECTION AND HIGH SPEED TRIAL RUN BETWEEN ARIYALUR – MATHUR RAILWAY STATIONS (www.sr.indianrailways.gov.in)
back to top
New Facilities/TechnologyIR Press Release  

News Entry# 261714   Blog Entry# 1771631     
   Tags   Past Edits
Mar 18 2016 (4:58PM)
Station Tag: Mathur/MTUR added by krishnabalaji234/723203

Mar 18 2016 (4:58PM)
Station Tag: Ariyalur/ALU added by krishnabalaji234/723203

Posted by: krishnabalaji234~  11 news posts
Shri Satish Kumar Mittal, Commissioner of Railway Safety, Southern Circle, Bangalore will inspect the newly laid second broad gauge railway line between Ariyalur – Mathur railway stations in Villupuram – Tiruchchirappalli chord line section o­n 21.03.2016, Monday.He will also conduct a high speed trial run using a Speed Trial Special Train in the newly laid second broad gauge railway line between Ariyalur – Mathur railway stations on 21.03.2016, Monday. The high speed trial run will be conducted between 15.00 hrs. – 18.00 hrs.
It is hereby advised that no unauthorised person shall approach / trespass or work in the proximity of the newly laid second broad gauge railway line between Ariyalur – Mathur railway station

3749 views
Mar 18 2016 (17:51)
Vijay Baradwaj   2454 blog posts   1479 correct pred (72% accurate)
Re# 1771631-1            Tags   Past Edits
I am very happy

4182 views
Mar 18 2016 (17:58)
rojaRAJU~   305 blog posts
Re# 1771631-2            Tags   Past Edits
Another 25 Kms to be added in second track ...
will reduce crossings to a great extent ...
also to enable reduced timings in new time table july 2016....
-----------------
rojaRAJU, O+
-----------------
Jan 15 2016 (07:13)  Pandian Express arrives late (www.thehindu.com)
back to top
Commentary/Human InterestSR/Southern  -  

News Entry# 254051     
   Tags   Past Edits
Jan 15 2016 (7:13AM)
Station Tag: Ariyalur/ALU added by rdb**/69261

Posted by: rdb*^  129373 news posts
Madurai-bound Pandian Express suffered a delay of for more than four hours after its locomotive failed near Kalpattichathiram in Dindigul district on Thursday morning.
Railway sources said that the AC locomotive failed around 5 a.m.
The train was detained there till an alternative locomotive from Dindigul was taken to the spot. As a result, the superfast train arrived Madurai around 11 a.m.
Jan 15 2016 (07:12)  Ariyalur work on fast track (www.thehindu.com)
back to top
Commentary/Human InterestSR/Southern  -  

News Entry# 254050     
   Tags   Past Edits
Jan 15 2016 (7:12AM)
Station Tag: Ariyalur/ALU added by rdb**/69261

Posted by: rdb*^  129373 news posts
The Ariyalur railway station is being beautified and expanded, and the work is being executed at a fast pace.
While the project on doubling the track between Ariyalur and Valadi segment to a length of 50 km had been executed, the 25-km stretch between Ariyalur and Mathur would be commissioned in course of time. As part of doubling of the track, the Ariyalur station has been beautified and expanded, according to Rail Vikas Nigam Limited (RVNL).
Sources said that length of the additional platform would be 550 metres. Once work on the platform
...
more...
was completed, work on basic amenities such as roof, water supply, and passenger benches would be provided. The additional platform, the source said, would ensure smooth operation of trains.