Full Site Search  
Fri Apr 28, 2017 23:33:46 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Large Station Board;
Large Station Board;

AVD/Avadi (4 PFs)
ஆவடி     आवडि

Track: Quadruple Electric-Line

Type of Station: Regular
Number of Platforms: 4
Number of Halting Trains: 12
Number of Originating Trains: 4
Number of Terminating Trains: 3
Tirumalairajapuram, Phone: 044-26555408
State: Tamil Nadu
Elevation: 28 m above sea level
Zone: SR/Southern
Division: Chennai
3 Travel Tips
No Recent News for AVD/Avadi
Nearby Stations in the News

Rating: 4.2/5 (16 votes)
cleanliness - good (2)
porters/escalators - good (2)
food - good (2)
transportation - excellent (2)
lodging - good (2)
railfanning - excellent (2)
sightseeing - good (2)
safety - excellent (2)

Nearby Stations

ANNR/Annanur 2 km     TMVL/Tirumullaivayil 3 km     HC/Hindu College 3 km     PAB/Pattabiram 4 km     ABU/Ambattur 5 km     NEC/Nemilicherry Halt 7 km     PVM/Pattaravakkam 7 km     KOTR/Korattur 9 km     TI/Tiruninravur 9 km     PADI/Padi 11 km    

Station News

Page#    Showing 1 to 7 of 7 News Items  
Sep 16 2016 (21:32)  EMU service cancelled on Sept 17, 18 (epaperbeta.timesofindia.com)
back to top
Major Accidents/DisruptionsSR/Southern  -  

News Entry# 280325     
   Tags   Past Edits
Sep 16 2016 (9:32PM)
Station Tag: Gummidipundi/GPD added by Karthik Iyer ^~/248735

Sep 16 2016 (9:32PM)
Station Tag: Tiruttani/TRT added by Karthik Iyer ^~/248735

Sep 16 2016 (9:32PM)
Station Tag: Arakkonam Junction/AJJ added by Karthik Iyer ^~/248735

Sep 16 2016 (9:32PM)
Station Tag: Arakkonam North/AJJN added by Karthik Iyer ^~/248735

Sep 16 2016 (9:32PM)
Station Tag: Tiruvallur/TRL added by Karthik Iyer ^~/248735

Sep 16 2016 (9:32PM)
Station Tag: Avadi/AVD added by Karthik Iyer ^~/248735

Sep 16 2016 (9:32PM)
Station Tag: Chennai Moore Market Complex/MMCC added by Karthik Iyer ^~/248735

Posted by: Karthik Iyer^~  605 news posts
To facilitate engineering works for commissioning the fifth and sixth railway lines between Chennai Central ­ Basin Bridge junction, on Sept 17,18 Moore Market railway station will remain closed. No EMU service will runbetween MMC ­ Avadi, Tiruvallur, Arakkonam, Tiruttani, Gummidipundi, Sulurpeta. However, alternative EMU services will be operational.
'சென்னை மற்றும் புறநகர் பகுதிகளின் வளர்ச்சிக்கு உதவும், சென்னை - மாமல்லபுரம்; கூடுவாஞ்சேரி - ஆவடி ரயில்வே திட்டங்களுக்கான, திட்ட மதிப்பீட்டு அனுமதியை, ரயில்வே வாரியம் வழங்க வேண்டும்' என்ற கோரிக்கை எழுந்துள்ளது. ரயில்வே பட்ஜெட்டில், இந்த திட்டங்களுக்கு போதிய நிதி ஒதுக்கீடு செய்ய வேண்டும் என்ற எதிர்பார்ப்பும் உருவாகி உள்ளது.
கல்வி, வேலைவாய்ப்பு மற்றும் வியாபாரத்திற்காக, பல மாவட்டங்களில் இருந்தும், சென்னைக்கு குடிபெயருவோர் எண்ணிக்கை, நாளுக்கு நாள் அதிகரித்து வருகிறது. சென்னையில் வசிப்போர், 75 லட்சம்; வந்து செல்வோர், 25 லட்சம் என, ஒரு கோடி பேர் புழங்கும் இடமாக, தமிழக தலைநகரம் மாறியுள்ளது. சென்னை புறநகர் பகுதிகளில், தகவல் தொழில்நுட்பம் எனப்படும், ஐ.டி., உள்ளிட்ட பன்னாட்டு நிறுவனங்கள், கார், இருசக்கர வாகன தயாரிப்பு நிறுவனங்கள்,
தொழிற்சாலைகள் அதிகரித்து வருகின்றன. வீடுகள் அதிகளவில் கட்டப்பட்டு, புதிதாக குடியமருவோர்
...
more...
எண்ணிக்கையும் பெருகி வருகிறது.
சென்னை மற்றும் புறநகர் பகுதிகளில் வசிப்போர் ரயிலில் பயணிக்கவும்; தொழிற்சாலைகளுக்கு தேவையான பொருட்கள் சென்றடைய, சரக்கு ரயிலை இயக்கவும், புதிய ரயில் பாதை திட்டங்கள் அவசியம்.இதற்கு,ரயில்வே பட்ஜெட்டில், ஏற்கனவே அறிவிக்கப்பட்ட இரண்டு திட்டங்களை விரைந்து செயல்படுத்தினாலே போதுமானது.
186 கி.மீ., துாரம்:
* சென்னையில் இருந்து மாமல்லபுரம், புதுச்சேரி வழியாக கடலுார் துறைமுகம் வரை, 186 கி.மீ., துாரத்திற்கு புதிய ரயில் பாதை அமைக்கும் திட்டம், 2008 - 09 ரயில்வே
Advertisement
பட்ஜெட்டில் அறிவிக்கப்பட்டது.
* கூடுவாஞ்சேரியில் இருந்து ஆவடி வரை, 50 கி.மீ., துாரத்திற்கான புதிய ரயில் பாதை அமைக்கும் திட்டம், 2014 - 15 ரயில்வே பட்ஜெட்டில் அறிவிக்கப்பட்டது.
ரூ.1,400 கோடி தேவை :
ரயில்வே அதிகாரி ஒருவர் கூறியதாவது: சென்னை - கடலுார் துறைமுகம், புதிய ரயில்பாதை திட்டத்தில், முதற்கட்டமாக, சென்னை - மாமல்லபுரம் இடையே, 45 கி.மீ., துாரத்திற்கு ரயில் பாதை அமைக்கலாம். இதற்கு, 400 கோடி ரூபாய் தேவை. இதன்மூலம் சுற்றுலாவையும் மேம்படுத்த முடியும். கூடுவாஞ்சேரி - ஆவடி ரயில் பாதைக்கு, 1,000 கோடி ரூபாய் தேவை.
இந்த இரு திட்டங்களும், பட்ஜெட்டில் அறிவிக்கப்பட்டதுடன் நிற்கின்றன. 'எஸ்டிமேட்' எனப்படும், திட்ட மதிப்பீட்டிற்கான அனுமதியை ரயில்வே வாரியம் அளிக்க வேண்டும். இதற்கான அறிவிப்பு, வரும் ரயில்வே பட்ஜெட்டில் வந்தால், சென்னை வளர்ச்சிக்கு பெரியளவில் உதவும்.இவ்வாறு அவர் கூறினார்.
கற்கள் பதிப்பு:
பெருங்குடியில் இருந்து மாமல்லபுரத்திற்கு, புதிய ரயில் பாதை ஏற்படுத்த, 2011ல் ரயில்வே அதிகாரிகள் ஆய்வு செய்தனர். கிழக்கு கடற்கரை சாலையை ஒட்டி, 100 மீ., முதல் 300 மீ., தொலைவில், கையகப்படுத்த உள்ள இடத்தை அடையாளப்படுத்த, தொடர்ச்சியாக மஞ்சள் நிற கற்கள் நடப்பட்டன. அதன்பின், இந்த திட்டத்தை கண்டுகொள்ளாமல் விட்டு விட்டனர்.
- நமது நிருபர் -

1950 views
Feb 17 2016 (09:21)
Boxer Bhai   38773 blog posts   12688 correct pred (61% accurate)
Re# 1741026-1            Tags   Past Edits
translation pls

2133 views
Feb 17 2016 (09:23)
बरौनी लखनऊ एक्सप्रेस   8480 blog posts   119 correct pred (74% accurate)
Re# 1741026-2            Tags   Past Edits
????????

Feb 17 2016 (09:26)
RPM WAP7 30333 30444 30555^~   9315 blog posts   12006 correct pred (85% accurate)
Re# 1741026-3            Tags   Past Edits
Its about Chennai-Mahabalipuram-Pondicherry and Guduvancherry-Avadi Railway line projects which is a pending and long standing demand of Tamilians as the train would help them to travel to their workplaces due to the growing industries and educational institutions and farming,etc. in the surburbs of Chennai.
Dec 03 2015 (09:52)  The following suburban services will not be operated today in the following sections untill further advice (scrrailnews.blogspot.in)
back to top
Major Accidents/DisruptionsSR/Southern  -  

News Entry# 249771     
   Tags   Past Edits
Dec 03 2015 (9:52AM)
Station Tag: Avadi/AVD added by MEMU/310906

Dec 03 2015 (9:52AM)
Station Tag: Sullurupeta/SPE added by MEMU/310906

Dec 03 2015 (9:52AM)
Station Tag: Gummidipundi/GPD added by MEMU/310906

Dec 03 2015 (9:52AM)
Station Tag: Tiruttani/TRT added by MEMU/310906

Dec 03 2015 (9:52AM)
Station Tag: Arakkonam Junction/AJJ added by MEMU/310906

Dec 03 2015 (9:52AM)
Station Tag: Tiruvallur/TRL added by MEMU/310906

Dec 03 2015 (9:52AM)
Station Tag: Chennai Central/MAS added by MEMU/310906

Dec 03 2015 (9:52AM)
Station Tag: Tambaram/TBM added by MEMU/310906

Dec 03 2015 (9:52AM)
Station Tag: Chennai Egmore/MS added by MEMU/310906

Dec 03 2015 (9:52AM)
Train Tag: Chennai Moore Market-Gummudipundi EMU/42001 added by MEMU/310906

Posted by: MEMU  115 news posts
1.Chennai Beach-Tambaram-Chingleput-Tirumalpur
2.Chennai Central-Tiruvallur-Avadi-Arakkonam-Tiruttani
3.Chennai Central-Gummidipoondi-Sulurpet
4.Chennai Beach-Gummidipoondi-Sulurpet
However, minimum service will be poerated in the following routes
1.Gummidipoondi-Ennore
...
more...

2.Chennai Beach-Avadi-Tiruvallur-Arakkonam & Tiruttani
3.MRTS service between Velachery-Thirumayilai- Chennai Beach.
Nov 27 2014 (18:46)  INTRODUCTION OF CROSS-SECTORAL EMU SUBURBAN TRAINS (www.sr.indianrailways.gov.in)
back to top
New/Special TrainsSR/Southern  -  IR Press Release  

News Entry# 202706   Blog Entry# 1289290     
   Tags   Past Edits
Nov 27 2014 (6:46PM)
Station Tag: Sullurupeta/SPE added by Vaibhav Agarwal*^/432532

Nov 27 2014 (6:46PM)
Station Tag: Avadi/AVD added by Vaibhav Agarwal*^/432532

Nov 27 2014 (6:46PM)
Station Tag: Arakkonam Junction/AJJ added by Vaibhav Agarwal*^/432532

Nov 27 2014 (6:46PM)
Station Tag: Tiruttani/TRT added by Vaibhav Agarwal*^/432532

Nov 27 2014 (6:46PM)
Station Tag: Velachery/VLCY added by Vaibhav Agarwal*^/432532

Nov 27 2014 (6:46PM)
Station Tag: Chennai Beach/MSB added by Vaibhav Agarwal*^/432532

Posted by: Vaibhav Agarwal*^  1403 news posts
From 28.11.2014 o­nwards the following Sullurpeta – Chennai Beach and Arakkonam – Chennai Beach EMU suburban trains will run upto Velachery from Monday to Saturday o­nly with different train numbers. (on Sundays the existing services will be maintained).

1. The following EMU local trains from Arakkonam and Sullurpetta sections will be operated upto Velacherry:

...
more...

a) Train No.42702 Ponneri – Chennai Beach EMU local will leave Ponneri at 07.05 hrs. instead of 07.00 hrs. arrive Chennai Beach at 08.05 hrs. leave Chennai Beach at 08.10 hrs. and arrive Velacherry at 08.55 hrs. (new train no.42750)

b) Train No.43610 Avadi – Chennai Beach EMU local leaving Avadi at 07.40 hrs. arrive Chennai Beach at 08.30 hrs. leave Chennai Beach at 08.35 hrs. and arrive Velacherry at 09.20 hrs. (new train no.43650)

c) Train No.43804 Arakkonam – Chennai Beach EMU local (Ladies Special) leaving Arakkonam at 07.00 hrs. arrive Chennai Beach at 08.55 hrs. leave Chennai Beach at 09.00 hrs. and arrive Velacherry at 09.45 hrs. (new train no.43932)

d) Train No.42802 Sullurpetta – Chennai Beach EMU local leaving Sulurpetta at 07.25 hrs. arrive Chennai Beach at 09.45 hrs. leave Chennai Beach at 09.50 hrs. and arrive Velacherry at 10.35 hrs. (new train no.42850)

2. The following EMU local trains running between Velacherry - Chennai Beach will be extended upto Tiruttani/Arakkonam/Avadi:

a) Train No.41050 Velacherry – Chennai Beach EMU local will leave Velacherry at 11.20 hrs. instead of 11.00 hrs. arrive Chennai Beach 12.05 hrs. leave Chennai Beach 12.10 hrs. and arrive Tiruttani at 14.40 hrs. (new train no.43941).

b) Train No.41094 Velacherry – Chennai Beach EMU local (Ladies Special) will leave Velacherry at 17.15 hrs. arrive Chennai Beach at 18.00 hrs. leave Chennai Beach at 18.05 hrs. and arrive Arakkonam at 20.05 hrs. (new train no.43931).

c) Train No.41116 Velacherry – Chennai Beach EMU local will leave Velacherry at 19.30 hrs. instead of 19.20 hrs. arrive Chennai Beach 20.15 hrs. leave Chennai Beach 20.20 hrs. and arrive Avadi at 21.10 hrs. (new train no.43651).

d) Train No.41126 Velacherry – Chennai Beach EMU local will leave Velacherry at 20.50 hrs. arrive Chennai Beach 21.35 hrs. leave Chennai Beach 21.40 hrs. and arrive Avadi at 22.30 hrs. (new train no.43653).

Consequent o­n the above, the following EMU trains in the Chennai Beach – Velacherry – Chennai Beach sections will be cancelled from 28.11.2014.

1. Train No.41027 Chennai Beach – Velacherry EMU local scheduled to leave Chennai
Beach at 08.15 hrs.

2. Train No.41031 Chennai Beach – Velacherry EMU local scheduled to leave Chennai
Beach at 08.35 hrs.

3. Train No.41037 Chennai Beach – Velacherry EMU local (Ladies Special) scheduled
to leave Chennai Beach at 09.05 hrs.

4. Train No.41047 Chennai Beach – Velacherry EMU local scheduled to leave Chennai
Beach at 09.55 hrs.

5. Train No.41052 Velacherry - Chennai Beach EMU local scheduled to leave
Velacherry at 11.15 hrs.

6. Train No.41118 Velacherry – Chennai Beach EMU local scheduled to leave
Velachery at 19.30 hrs.

7. Train No.41126 Velacherry – Chennai Beach EMU local scheduled to leave
Velachery at 20.50 hrs.

9093 views
Nov 27 2014 (22:44)
srinivasvasanthi~   3790 blog posts   13 correct pred (50% accurate)
Re# 1289290-1            Tags   Past Edits
Similarly Tambaram - Chennai Beach EMU shall be extended to Sullurpeta / Arakonam.
Moreover these cross-sectoral EMU shall be operated Daily including Sunday. ( not 6 DAYS IN A WEEK ie EXCEPT SUNDAY ).
Some of the non cross - sectoral services may be cancelled on Sunday.
Aug 08 2014 (19:41)  CHANGE IN PATTERN OF TRAIN SERVICES DUE TO LINE BLOCK & EXTENSION / INTRODUCTION OF EMUs AS SPECIAL TRAINS (www.sr.indianrailways.gov.in)
back to top
New/Special TrainsSR/Southern  -  IR Press Release  

News Entry# 188822     
   Tags   Past Edits
Aug 08 2014 (7:43PM)
Train Tag: Arakkonam Avadi EMU/43844 added by ♚**/41440

Aug 08 2014 (7:43PM)
Train Tag: Chennai Beach-Avadi EMU/43607 added by ♚**/41440

Aug 08 2014 (7:43PM)
Train Tag: Chennai Central-Tiruvallur EMU/43247 added by ♚**/41440

Aug 08 2014 (7:43PM)
Train Tag: Chennai Central Arakkonam Fast local/66011 added by ♚**/41440

Aug 08 2014 (7:43PM)
Train Tag: Chennai Beach-Arakkonam Ladies Spl EMU/43807 added by ♚**/41440

Aug 08 2014 (7:43PM)
Train Tag: Chennai Arakkonam EMU/43427 added by ♚**/41440

Aug 08 2014 (7:43PM)
Train Tag: Chennai Arakkonam EMU/43425 added by ♚**/41440

Aug 08 2014 (7:43PM)
Train Tag: Chennai Arakkonam EMU/43405 added by ♚**/41440

Aug 08 2014 (7:43PM)
Train Tag: Chennai Beach Arakkonam EMU/43803 added by ♚**/41440

Aug 08 2014 (7:42PM)
Station Tag: Avadi/AVD added by ♚**/41440

Aug 08 2014 (7:42PM)
Station Tag: Tiruvallur/TRL added by ♚**/41440

Aug 08 2014 (7:42PM)
Station Tag: Chennai Beach/MSB added by ♚**/41440

Aug 08 2014 (7:41PM)
Station Tag: Chennai Moore Market Complex/MMCC added by ♚**/41440

Posted by: sGs*^~  180 news posts
08-08-2014
CHENNAI
CHANGE IN PATTERN OF TRAIN SERVICES DUE TO LINE BLOCK & EXTENSION / INTRODUCTION OF EMUs AS SPECIAL TRAINS
Due to line block / power block to facilitate engineering works at Arakkonam railway station, the following changes will be made in suburban train services for 28 days from 11.08.2014.
...
more...


A. The following trains will be partially cancelled between Thiruvalangadu – Arakkonam.
Train No.43803 Chennai Beach - Arakkonam EMU local scheduled to leave Chennai Beach at 04.30 hrs.
Train No.43405 MMC – Arakkonam EMU local scheduled to leave MMC at 06.40 hrs.
Train No.43425 MMC – Arakkonam EMU local scheduled to leave MMC at 18.05 hrs.
Train No.43427 MMC – Arakkonam EMU local scheduled to leave MMC at 18.40 hrs.


B. Partial cancellation of Ladies Special EMU between Tiruvallur – Arakkonam.
Train No.43807 Chennai Beach – Arakkonam Ladies Special EMU local scheduled to leave Chennai Beach at 18.05 hrs. will be partially cancelled between Tiruvallur – Arakkonam.


C. Extension of EMU to Chitteri.
Train No.66011 MMC – Arakkonam MEMU fast local scheduled to leave MMC at 17.45 hrs. will be extended to run upto Chitteri.



II. EXTENSION / INTRODUCTION OF EMUs AS SPECIAL TRAINS

Some suburban train services will be extended / introduced as special trains for a period of o­ne month with effect from 11.08.2014.

1. Train No.43247 MMC – Tiruvallur EMU local scheduled to leave MMC at 19.30 hrs. will be extended to run upto Arakkonam as a fast local and will reach Arakkonam at 21.10 hrs. This train will stop at Basin Bridge Jn., Perambur, Villivakkam, Ambattur, Thiruninravur, Tiruvallur, Kadambattur & Thiruvalangadu.

2. Train No.43607 Chennai Beach – Avadi EMU local scheduled to leave Chennai Beach at 19.10 hrs. will be extended to run upto Tiruvallur and reach Tiruvallur at 20.50 hrs.

3. A new suburban train service, Train No.43844 Arakkonam – Avadi EMU local will leave Arakkonam at 21.50 hrs. and reach Avadi at 22.50 hrs.
(M. Boopathy)
Sr.PRO
May 07 2014 (11:35)  Announcement of arriving station in Chennai locals. (www.dinamalar.com)
back to top
IR AffairsCMRL/Chennai Metro  -  

News Entry# 176086     
   Tags   Past Edits
May 07 2014 (11:35AM)
Station Tag: Ambattur/ABU added by க்ரிஷ் క్రిష్ ಕೃಷ್ കൃഷ് कृष/636301

May 07 2014 (11:35AM)
Station Tag: Avadi/AVD added by க்ரிஷ் క్రిష్ ಕೃಷ್ കൃഷ് कृष/636301

May 07 2014 (11:35AM)
Station Tag: Chengalpattu Junction/CGL added by க்ரிஷ் క్రిష్ ಕೃಷ್ കൃഷ് कृष/636301

May 07 2014 (11:35AM)
Station Tag: Mambalam/MBM added by க்ரிஷ் క్రిష్ ಕೃಷ್ കൃഷ് कृष/636301

May 07 2014 (11:35AM)
Station Tag: Chennai Beach/MSB added by க்ரிஷ் క్రిష్ ಕೃಷ್ കൃഷ് कृष/636301

May 07 2014 (11:35AM)
Station Tag: Tambaram/TBM added by க்ரிஷ் క్రిష్ ಕೃಷ್ കൃഷ് कृष/636301

May 07 2014 (11:35AM)
Station Tag: Chennai Egmore/MS added by க்ரிஷ் క్రిష్ ಕೃಷ್ കൃഷ് कृष/636301

May 07 2014 (11:35AM)
Station Tag: Chennai Park/MPK added by க்ரிஷ் క్రిష్ ಕೃಷ್ കൃഷ് कृष/636301

May 07 2014 (11:35AM)
Station Tag: Chennai Central/MAS added by க்ரிஷ் క్రిష్ ಕೃಷ್ കൃഷ് कृष/636301

Posted by: க்ரிஷ் క్రిష్ ಕೃಷ್ കൃഷ് कृष  33 news posts
சென்னை: தாம்பரம்- கடற்கரை மார்கத்தில் இயக்கப்படும் மின்சார ரயிலில், அடுத்து வர உள்ள நிலையம் குறித்த தகவல்கள், காட்சி திரை மூலம், பயணி களிடையே வரவேற்பை பெற்று உள்ளது.
மூன்று மொழிகளில்..
தாம்பரம்- கடற்கரை மார்கத்தில் இயக்கப்படும் மின்சார ரயில்களில், முதல்வகுப்பு உட்பட பெட்டிகளில், காட்சி திரை பொருத்தப்பட்டது. அந்த திரையில் இதுவரை 'இனிமையான பயணத்திற்கு வாழ்த்துகள்' என்று தமிழ், ஆங்கிலம், இந்தி ஆகிய மூன்று மொழிகளில் ஓடிக் கொண்டிருக்கும்.
நேற்று முன்தினம் முதல் அந்த காட்சி திரையில், மின்சார ரயில் சென்றடையும் நிலையம், அடுத்து நிற்க உள்ள நிலையம்,
...
more...
நேரம் ஆகிய தகவல்கள், தமிழ் உட்பட மூன்று மொழிகளிலும் அறிவிக்கப்பட்டு வருகின்றன.இந்த அறிவிப்பு தொடர்ந்து ஒலித்துக் கொண்டே இருப்பது பயணிகளுக்கு பெரும் உதவியாக உள்ளது. ஒரு சில ரயில்களில் மட்டுமே நடைமுறைக்கு வந்துள்ள இந்த அறிவிப்பு திட்டத்திற்கு, பயணி கள் பெரும் வரவேற்பு தெரிவித்துள்ள நிலையில், அனைத்து மின்சார ரயில்களிலும் இந்த அறிவிப்பு செய்ய வேண்டும் என்று கோரிக்கையும் வைத்துள்ளனர். இதுகுறித்து, ரயில்வே அதிகாரி ஒருவர் கூறியதாவது:
பயணிகளுக்கு வசதியாக தான் இந்த, காட்சி திரைகள் பொருத்தப்பட்டன. இவ்வளவு நாட்கள் அவை சரியாக இயங்கவில்லை. தற்போது பயணிகளின் பாதுகாப்பிற்காக அனைத்து நடவடிக்கைகளையும் ரயில்வே எடுத்து வருகிறது. அதில் இந்த அறிவிப்பு பலகைகளை பழுது பார்த்து இயக்குவதும் ஒன்று. அனைத்து ரயில்களிலும் படிப்படியாக இந்த காட்சி திரைகள் பொருத்தப்படும். இவ்வாறு அவர் தெரிவித்தார்.
முதல் வகுப்பிலும் தேவை
மின்சார ரயில் பயணி போஜராஜன் கூறியதாவது:
மின்சார ரயிலில் அறியாமை யால் பலர் முதல் வகுப்பில் ஏறிவிட்டு, அபராதம் கட்டுகின்றனர். இதை தவிர்க்க, முதல் வகுப்பு பெட்டியில் அது குறித்த அறிவிப்பு செய்யலாம். இதன் மூலம் விவரம் தெரியாதவர்கள், அபராதத்தில் இருந்து தப்பிக்க முடியும். இவ்வாறு அவர் தெரிவித்தார்.
Mar 16 2014 (07:52)  LIVES LOST ON THE TRACKS - II (www.thehindu.com)
back to top
Commentary/Human InterestSR/Southern  -  

News Entry# 171440     
   Tags   Past Edits
Mar 16 2014 (7:52AM)
Station Tag: Avadi/AVD added by rdb**/69261

Posted by: rdb*^  128423 news posts
At Avadi railway station, commuters cross the railway level crossing even when a suburban train is seen chug-chugging towards them, at a distance. The reason: Repair work on the existing foot overbridge is dragging on for over a month now. Commuters at Ambattur railway station do not use the FOB at the entrance because it has too many stairs . At Perambur railway station, commuters c avoid using the FOB as it is at one end of the station and far from the entrance.
Instead, they cross the track from Jamila to reach the bus terminus on the opposite side.
Page#    Showing 1 to 7 of 7 News Items  

Scroll to Top
Scroll to Bottom


Go to Desktop site