Full Site Search  
Sat Feb 25, 2017 10:37:52 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Large Station Board;

BG/Bhongir (3 PFs)
భువనగిరి /بھونگیری     भुवनगिरी

Track: Double Electric-Line

Type of Station: Regular
Number of Platforms: 3
Number of Halting Trains: 26
Number of Originating Trains: 1
Number of Terminating Trains: 1
NH 163, Station Road ,Bhongir, Yadadri-Bhuvanagiri Dist.
State: Telangana
Elevation: 455 m above sea level
Zone: SCR/South Central
Division: Secunderabad
No Recent News for BG/Bhongir
Nearby Stations in the News

Rating: 5.0/5 (8 votes)
cleanliness - excellent (1)
porters/escalators - excellent (1)
food - excellent (1)
transportation - excellent (1)
lodging - excellent (1)
railfanning - excellent (1)
sightseeing - excellent (1)
safety - excellent (1)

Nearby Stations

RAG/Raigir 6 km     PGDP/Pagidipalli Junction 10 km     WP/Wangapalli 12 km     BN/Bibinagar 14 km     BMMP/Bommaipalli 15 km     ALER/Aler 23 km     NRDP/Nagireddipalli 26 km     GT/Ghatkesar 26 km     PBP/Pembarti 32 km     MMPR/Mamdapur 33 km    

Station News

Page#    Showing 1 to 3 of 3 News Items  
Nov 18 2013 (03:32)  లారీని ఢీకొన్న కోణార్క్ ఎక్స్‌ప్రెస్ (epaper.sakshi.com)
back to top
Major Accidents/DisruptionsSCR/South Central  -  

News Entry# 157076     
   Tags   Past Edits
Nov 18 2013 (3:32AM)
Station Tag: Bhongir/BG added by kudratkhan4u/805714

Nov 18 2013 (3:32AM)
Train Tag: Konark Express/11020 added by kudratkhan4u/805714

Posted by: Hyd  400 news posts
భువనగిరి,న్యూస్‌లైన్: నల్లగొండ జిల్లా భువనగిరి పట్టణ శివారులో ఆదివారం కోణార్క్ ఎక్స్‌ప్రెస్ రైలు లారీని ఢీకొట్టింది. దీంతో రైళ్లు, వాహనాల రాకపోకలకు కొద్దిసేపు అంతరాయం కలిగింది. భువనగిరి నుంచి జగదేవ్‌పూర్ వెళ్లే రోడ్డుమార్గంలో ఉన్న హన్మాపురం రైల్వే గేటును సికింద్రాబాద్ నుంచి పాట్నా వెళ్తున్న దురంతో ఎక్స్‌ప్రెస్ రైలు కోసం మూసివేశారు. ఆ రైలు వెళ్లిపోయిన తర్వాత మరో రైలు వస్తున్న సమాచారం తెలుసుకోకుండానే గేట్‌మ్యాన్ గేటు తీశాడు. దీంతో గేటు బయట నిలిచి ఉన్న లారీని డ్రైవర్ ముందుకు కదిలించాడు. ఇదే సమయంలో భువనేశ్వర్ నుంచి ముంబై వెళ్తున్న కోణార్క్ ఎక్స్‌ప్రెస్ రావడంతో ట్రాక్ దాటి వెళ్తున్న లారీ వెనుకభాగాన్ని ఢీకొట్టింది. దీంతో లారీ ట్రాక్‌పై కొద్దిదూరంలో ఎగిరిపడింది. ఈ ప్రమాదంతో సికింద్రాబాద్ వైపు వెళ్తున్న పలు రైళ్లు ఆలస్యంగా నడిచాయి.
Oct 19 2013 (08:52)  Foot overbridges may come in way of proposed metro route (timesofindia.indiatimes.com)
back to top
Commentary/Human InterestNR/Northern  -  

News Entry# 153103     
   Tags   Past Edits
Oct 19 2013 (12:18PM)
Station Tag: Bhongir/BG removed by moderator**/12

Oct 19 2013 (12:17PM)
Train Tag: Sirpur Kaghaznagar-Secunderabad Intercity Express/17012 removed by moderator**/12

Oct 19 2013 (12:17PM)
Train Tag: Sirpur Kaghaznagar-Secunderabad Intercity Express/17012 added by moderator**/12
Station Tag: Bhongir/BG added by moderator**/12

Posted by: rdb*^  126086 news posts
LUCKNOW: Even as Lucknow Development Authority (LDA) hands over the existing foot overbridges to the Lucknow Municipal Corporation (LMC) there is a growing apprehension that the structures may come in way of the proposed metro rail route.LMC experts examining the foot overbridges said that the structures are almost at the height at which the metro rail is proposed to ply on the north south corridor. Municipal commissioner RK Singh confirmed that the issue is being examined on the said front.There are three foot overbridges that have been transferred to LMC for their upkeep. The three include those at Alambagh, Charbagh and polytechnique crossing on Faizabad road. Interestingly, the three overbridges happen to fall in the line of the proposed metro rail route. The rail is proposed to run on the middle of the road at a height that matches the one at which the bridges are situated.A senior LMC official said...
more...
that they are unsure if the structure will continue to exist or will have to be removed to pave way for the proposed metro rail. The overbridges are being handed over to the LMC for their better upkeep. The municipal corporation has already invited bids for advertising to raise funds which would be used for up keep of the structures.
The tenders for the advertising will be floated and given for a set term. Hence it will be crucial for the LMC to calculate if the advertising companies will be able to provide the services. Sources said that the foot overbridges lie in a very bad shape in the absence of a proper upkeep. The over bridges were built during the regime of Mayawati, each at a cost of around Rs 5 crore. The structures also lie unused in the absence of escalators.
Oct 19 2013 (08:42)  Inter City express delayed (www.thehindu.com)
back to top
Commentary/Human InterestSCR/South Central  -  

News Entry# 153098     
   Tags   Past Edits
Oct 19 2013 (12:18PM)
Train Tag: Sirpur Kaghaznagar-Secunderabad Intercity Express/17012 added by moderator**/12
Station Tag: Bhongir/BG added by moderator**/12

Posted by: rdb*^  126086 news posts
The Inter City express operating between Sirpur Kagaznagar and Secunderabad was delayed for four hours due to a technical snag. The train was halted at Bhuvanagiri Railway station to replace it’s engine.
After fours hours, the problem was rectified.
Passengers had a tough waiting as the train which arrived at Bhuvanagiri at 3.30 p.m. had departed at 7.30 p.m. However, no trains were delayed because the train was halted on other track for repairing.
Page#    Showing 1 to 3 of 3 News Items  

Scroll to Top
Scroll to Bottom


Go to Desktop site