Full Site Search  
Thu May 25, 2017 16:17:22 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Large Station Board;
Large Station Board;
Large Station Board;
Front Entrance - Outside;

BIDR/Bidar (3 PFs)
ಬೀದರ/بیدر     बीदर

Track: Single Diesel-Line

Type of Station: Regular
Number of Platforms: 3
Number of Halting Trains: 20
Number of Originating Trains: 10
Number of Terminating Trains: 10
Railway Station Road,Nandi Colony,SH 15,Ph No-08482 226404,Bidar
State: Karnataka
Elevation: 674 m above sea level
Zone: SCR/South Central
Division: Secunderabad
No Recent News for BIDR/Bidar
Nearby Stations in the News

Rating: 4.8/5 (32 votes)
cleanliness - excellent (4)
porters/escalators - excellent (4)
food - good (4)
transportation - excellent (4)
lodging - excellent (4)
railfanning - excellent (4)
sightseeing - excellent (4)
safety - excellent (4)

Nearby Stations

CHTT/Chitta 13 km     KHNP/Khanapur Deccan Junction 15 km     MTV/Matalkunta 19 km     HBU/Halbarga 23 km     KNAG/Kanaji 24 km     ZB/Zahirabad 32 km     HLKH/Hallikhed 33 km     BHLK/Bhalki 38 km    

Station News

Page#    Showing 1 to 20 of 32 News Items  next>>
May 05 2017 (08:50)  रेल्वेप्रश्नी खासदार सुनील गायकवाडांची पंचाईत (www.loksatta.com)
back to top
PoliticsCR/Central  -  

News Entry# 301643     
   Tags   Past Edits
May 05 2017 (08:50)
Station Tag: Bidar/BIDR added by z^~/1269766

May 05 2017 (08:50)
Station Tag: Udgir/UDGR added by z^~/1269766

May 05 2017 (08:50)
Station Tag: Latur/LUR added by z^~/1269766

May 05 2017 (08:50)
Train Tag: Bidar - Yesvantpur Express/16572 added by z^~/1269766

May 05 2017 (08:50)
Train Tag: Yesvantpur - Bidar Express/16571 added by z^~/1269766

May 05 2017 (08:50)
Train Tag: Hyderabad - Pune Express/17014 added by z^~/1269766

May 05 2017 (08:50)
Train Tag: Pune - Hyderabad Express/17013 added by z^~/1269766

May 05 2017 (08:50)
Train Tag: Latur - Mumbai CST SF Express/22108 added by z^~/1269766

May 05 2017 (08:50)
Train Tag: Mumbai CST - Bidar SF Express/22107 added by z^~/1269766

Posted by: 55 Percent trains in India are Locals^~  73 news posts
लातूर एक्स्प्रेसवरून दोन्ही बाजूंच्या नाराजीचा सामना; उदगीरनंतर आज लातूर बंदची हाक
लातूर एक्स्प्रेस आठवडय़ातून तीन दिवस बिदपर्यंत विस्तारीकरण करण्याच्या रेल्वे प्रशासनाच्या विरोधात लातूरकरांनी शुक्रवारी शहर बंदचा निर्णय घेतला असून, काँग्रेस, राष्ट्रवादी काँग्रेस, भाजप, शिवसेना, मनसे या राजकीय पक्षांबरोबर मराठवाडा जनता विकास परिषद, रेल्वे संघर्ष समिती अशा सर्वानीच एकजूट दाखवली आहे. या रेल्वे प्रश्नात लातूरचे खासदार सुनील गायकवाड यांची पंचाईत झाली आहे. गाडीला विरोध केला तर उदगीरकर, विरोध नाही केला तर लातूरकर नाराज होणार असल्याने नेमकी काय भूमिका घ्यावी, असा प्रश्न खासदार गायकवाड यांच्यासमोर उभा राहिला, मात्र त्यातूनही त्यांनी ‘नरो वा कुंजरो वा’ प्रमाणे मार्ग काढला आहे.
लातूरहून
...
more...
मुंबईला जाणारी एकमेव रेल्वे विलासराव देशमुख यांच्या प्रयत्नाने सुरू झाली. बऱ्याच वर्षांनंतर लातूरहून थेट मुंबईला जाण्याची सोय झाल्यामुळे ही रेल्वे प्रवाशांच्या पसंतीस उतरली. दीडशे टक्के क्षमतेने ही रेल्वे सुरू असताना लातूरकरांची गरसोय होत आहे. रेल्वेने या गाडीला अतिरिक्त डबे जोडावेत, अशी मागणी प्रवाशांची होत असतानाही ती मागणी मान्य न करता आठवडय़ातून तीन दिवस ही रेल्वे बिदपर्यंत विस्तारीकरण करण्याचा निर्णय घेण्यात आला आहे.
बिदरचे खासदार भगवंत खुब्बा यांनी आपले वजन खर्ची घालून ही मागणी पदरात पाडून घेतली. लातूरचे खासदार सुनील गायकवाड हे कात्रीत सापडले आहेत. गाडीला विरोध केला तर उदगीरकर नाराज व विरोध नाही केला तर लातूरकर नाराज. हे दोघेही त्यांच्या मतदारसंघातीलच. त्यामुळे अतिरिक्त रेल्वे सुरू करण्याचा आपला प्रयत्न असल्याची भूमिका मांडत त्यांनी ‘नरो वा कुंजरो वा’ची भूमिका घेतली आहे.
लातूर एक्स्प्रेस ही लातूरकरांची अस्मिता बनल्यामुळे सर्वच जण या रेल्वेच्या विस्तारीकरणास विरोध करत आहेत. अशोक चव्हाण मुख्यमंत्री असताना ही रेल्वे नांदेडपर्यंत नेण्याचा त्यांनी प्रयत्न केला होता, मात्र लातूरकरांनी तो हाणून पाडला होता. आता लातूरकरांच्या सोबतीला पहिल्यांदाच उस्मानाबादकर धावून आल्यामुळे लातूर एक्स्प्रेसच्या विस्तारीकरणाचा विरोध दुपटीने वाढला आहे. रेल्वे प्रशासन जनतेच्या भावनांची दखल घेणार की नाही, असा प्रश्न नव्याने निर्माण झाला आहे.
उदगिरात कडकडीत बंद
मुंबई-लातूर एक्स्प्रेस रेल्वेचे बिदपर्यंत आठवडाभर विस्तारीकरण करावे, हैदराबाद-पुणे रेल्वेसेवा आठवडय़ातील सर्व दिवस सुरू करावी, यशवंतपूर (बंगळूरु) ते बिदर ही गाडी लातूपर्यंत विस्तारित करावी, आदी मागण्यांसाठी उदगीरवासीयांनी दिलेल्या बंदच्या हाकेला उत्स्फूर्त प्रतिसाद मिळाला. भाजप, शिवसेना, काँग्रेस, राष्ट्रवादी, मनसे या सर्व राजकीय पक्षांबरोबरच विविध स्वयंसेवी संस्थांनीही बंदला पाठिंबा दिला. लातूरची रेल्वे उदगीर माग्रे गेल्यामुळे जळकोट, उदगीर, देवणी, अहमदपूर, चाकूर, आदी तालुक्यांतील लोकांना मुंबईपर्यंत जाण्याची चांगली सोय होणार आहे. त्यामुळे सर्वच मंडळी या बंदमध्ये सहभागी होती. लातूरकरांनी लातूर एक्स्प्रेस विस्तारीकरणास विरोध केल्यानंतर उदगीरची मंडळी संतप्त झाली आहेत. लातूरकरांच्या भूमिकेच्या विरोधात आवाज उठवत उदगीरकरांनी एकजूट दर्शवली आहे.
Apr 26 2017 (19:08)  Extension of Mumbai-Latur Express to Bidar 3 days a week - Bookings for 22143 for Bidar (beyond Latur) & 22107/22108 open from 27.4.2017 (www.cr.indianrailways.gov.in)
back to top
New/Special TrainsCR/Central  -  IR Press Release  

News Entry# 300860     
   Tags   Past Edits
Apr 26 2017 (19:08)
Station Tag: Bidar/BIDR added by knkprasad956*^~/287013

Posted by: knkprasad956*^~  528 news posts
Press Release
EXTENSION OF CHHATRAPATI SHIVAJI TERMINUS – LATUR EXPRESS
TO BIDAR – 3 DAYS A WEEK
Ministry of Railways have decided to extend the 22107/22108 Chhatrapati Shivaji Terminus Mumbai – Latur Express to Bidar with new number 22143/22144.
22143/22144Chhatrapati
...
more...
Shivaji Terminus Mumbai – Bidar Superfast Express will run 3 days a week. The details are as follows :
Train no 22143 Chhatrapati Shivaji Terminus Mumbai – Bidar Superfast Express (Tri-weekly) will leave Chhatrapati Shivaji Terminus Mumbai at 21.00 hrs o­n every Wednesday, Friday & Saturday, and reach Bidar at 09.15 hrs next day.
Train no 22144 Bidar - Chhatrapati Shivaji Terminus Mumbai Superfast Express (Tri-weekly) will leave Bidar at 19.50 hrs o­n every Sunday, Thursday & Saturday, and reach Chhatrapati Shivaji Terminus Mumbai at 08.05 hrs next day.
HALTS: There is no change in halts upto Latur. After Latur the train will halt at Latur Road, Udgir and Bhalki.
22107/22108Chhatrapati Shivaji Terminus Mumbai – Latur Express will run 4 days a week. The details are as follows :
Train no 22107 Chhatrapati Shivaji Terminus Mumbai – Latur Express (four times a week) will leave Chhatrapati Shivaji Terminus Mumbai at 21.00 hrs o­n every Monday, Tuesday, Thursday & Sunday and reach Latur at 06.30 hrs next day.
Train no 22108 Latur - Chhatrapati Shivaji Terminus Mumbai Express (four times a week) will leave Latur at 22.30 hrs o­n every Monday, Tuesday, Wednesday and Friday and reach Chhatrapati Shivaji Terminus Mumbai at 08.05 hrs next day.
REGULAR COMPOSITION- Both the trains o­ne First AC, One AC-2 Tier, Two AC-3 Tier, 6 Sleeper Class, 6 General Second Class, 2 General Second Class cum Guard’s Brake Vans.
REVISED COMPOSITION - Both the trains From 28.4.2017 to 26.8.2017 Ex CSTM and from 29.4.2017 to 27.8.2017 Ex Latur / Bidar this train will run with One First AC, One AC-2 Tier, Two AC-3 Tier, 8 Sleeper Class, 4 General Second Class, 2 General Second Class cum Guard’s Brake Vans.

RESERVATION : Regular service of Train no 22143 Chhatrapati Shivaji Terminus Mumbai – Bidar Superfast Express will commence with effect from 28.4.2017 (Friday) and bookings for Train no 22143 for Bidar (i.e beyond Latur) and for Train no 22107/22108 Mumbai-Latur-Mumbai will commence from 27.4.2017
--- --- --- --- --- --- --- --- -
Date: April 26, 2017
This news comes to you from Public Relations Department, Central Railway, Chhatrapati Shivaji Terminus Mumbai.
Apr 25 2017 (09:36)  M.Kharge unhappy with slow pace of railway works in Hyderabad-Karnataka (www.thehindu.com)
back to top
Commentary/Human InterestSWR/South Western  -  

News Entry# 300718   Blog Entry# 2251741     
   Tags   Past Edits
Apr 25 2017 (09:36)
Station Tag: Bidar/BIDR added by NEED MORE TRAINS AT BAY/35650

Apr 25 2017 (09:36)
Station Tag: Raichur Junction/RC added by NEED MORE TRAINS AT BAY/35650

Apr 25 2017 (09:36)
Station Tag: Koppal/KBL added by NEED MORE TRAINS AT BAY/35650

Apr 25 2017 (09:36)
Station Tag: Gonda Junction/GD added by NEED MORE TRAINS AT BAY/35650

Apr 25 2017 (09:36)
Station Tag: Ballari Junction (Bellary)/BAY added by NEED MORE TRAINS AT BAY/35650

Apr 25 2017 (09:36)
Station Tag: Gulbarga/GR added by NEED MORE TRAINS AT BAY/35650

Posted by: NEED MORE TRAINS AT BAY~  59 news posts
He appeals to the Railway Ministry to speed up works that are under way
M. Mallikarjun Kharge, Leader of the Congress in the Lok Sabha, has expressed discontent over the slow pace of railway works in the Hyderabad-Karnataka region.
Addressing a press conference at Aiwan-E-Shahi guest house in Kalaburagi on Monday, he appealed to the Union Railway Ministry to continue working on the initiatives he had taken during his brief tenure as Union Railway Minister and to speed up the works that are under way.
“In
...
more...
order to develop railway infrastructure in the Hyderabad-Karnataka region, I, as Union Railway Minister, had taken many initiatives such as opening a railway divisional office in Kalaburagi, laying of tracks between the Bidar and Kalaburagi stretch and the Wadi and Gadag stretch, electrification of railway tracks, and construction of railway over-bridges at several level-crossings at Wadi. While a few of these are yet to take off despite having budgetary allocations, the rest seem to be moving at a snail’s pace,” Mr. Kharge said.
He added that the issue of scarcity of sand that had delayed tunnel work on the Kalaburagi-Bidar railway stretch had been resolved by involving both the Kalaburagi Regional Commissioner and the Raichur Deputy Commissioner who would facilitate quality sand extraction from Raichur district. “I hope the work will be completed by September,” he said.
Highlighting the statutory issues involved in procurement of gravel required for track-doubling works, Mr. Kharge said that he had talked to the others concerned for facilitating hassle-free procurement. “As per the new rules, permission is required for gravel mining. Upon my direction, the Regional Commissioner has asked the contractor to collect gravel from government land and only then approach private ones if a sufficient quantity is not available in the former source,” he said.

1513 views
Apr 26 2017 (18:42)
Foamer~   1834 blog posts
Re# 2251741-1            Tags   Past Edits
Sep? I thought that line will be inaugurated in a couple of months.

1431 views
Apr 26 2017 (19:38)
AurngabadPurnaAkolaNagpur~   707 blog posts   1 correct pred (14% accurate)
Re# 2251741-2            Tags   Past Edits
tunnel work complet ho gaya tha n?

1409 views
Apr 26 2017 (19:44)
Foamer~   1834 blog posts
Re# 2251741-3            Tags   Past Edits
Yes. That's why I was thinking why delay till Sep? Guess inside tunnel work and signalling and interlocking works are left.
Apr 02 2017 (19:41)  Manual scavenging: Officers, contractor held (www.thehindu.com)
back to top
Commentary/Human InterestSCR/South Central  -  

News Entry# 298391     
   Tags   Past Edits
Apr 02 2017 (19:41)
Station Tag: Bidar/BIDR added by rdb*^/69261

Posted by: rdb*^  129373 news posts
The Bidar police have booked a case against officers of the Bidar railway station and a sanitation contractor on the charge of using labourers for manual scavenging on Saturday.
This followed a visit of the Principal District and Sessions Judge Sanjiv Kumar Hanchate to the railway station where he found two labourers engaged in manual scavenging. They were cleaning a pit and carrying human excreta with their hands. He called Railway and Police personnel to the spot and instructed the police to register a complaint against those concerned on Friday.
In such cases,
...
more...
the magistrate has to take cognizance of the matter. The police will book a case and present facts before the court, a senior police officer said.
Oct 31 2016 (11:31)  Bidar-Nanded rail line project to be revived - KARNATAKA - The Hindu (www.thehindu.com)
back to top
New Facilities/TechnologySWR/South Western  -  

News Entry# 284408   Blog Entry# 2051271     
   Tags   Past Edits
Oct 31 2016 (11:31AM)
Station Tag: Hazur Sahib Nanded/NED added by KSG*^~/36225

Oct 31 2016 (11:31AM)
Station Tag: Bidar/BIDR added by KSG*^~/36225

Posted by: Gopal*^~  3490 news posts
Bidar-Nanded rail line project to be revived
Railway Board has ordered a resurvey, says Bhagwant Khuba
The Railway Ministry has agreed to revive the Bidar-Nanded rail line that was earlier rejected by the Railway Board.
Bhagwant Khuba, MP, told presspersons here on Sunday that the board had ordered a resurvey of the line. The first survey was conducted around 10 years ago. “It was
...
more...
found to have negative viability. However, after my request to Railway Minister Suresh Prabhu, the board has agreed to take a re-look at the project. There is a possibility of realignment of the track at some points,” the MP said.
“The survey will start soon and a viability report will be submitted to the Ministry a few months later. I am hopeful that the project will be found viable,” Mr. Khuba said.
He said that Railway officials had told him that the Bidar-Kalaburagi line would be completed by March 2017. The pit-line for maintenance of coaches near Khanapur too would be completed by then.
The first trial runs on the line would be held by April, he said. “Mr. Prabhu has agreed to our request to regularise the Bidar-Pandharpur train and make it a daily service,” the MP said.
Mr. Khuba alleged that the State government had not taken steps to negotiate with GMR group to convince them about the operation of civil aviation flights from the Bidar Air Force base. Due to an agreement between the Union government and GMR group, no other airport can operate civil flights within a 150-km radius of the Hyderabad International Airport.
“Only if the State government takes this initiative, the Union government can interfere in the matter,” he said.
The Union government has approved the upgrading of State highways as national highways, the MP said. Telangana border-Sangam – Bhalki- Muchalamb-Basava Kalyan to Sastapur at Rs. 105 crore, Bidar–Mannaekhalli – Chincholi-Mariya-Tandur-Mehboob Nagar at Rs. 124 crore; Bidar –Ambesangvi–Kamal Nagar at the cost of Rs. 52 crore; Bidar–Humnabad at Rs. 52 crore, Mudbi-Harkud-VK Salgar-Mahagaon-Kodli-Madbool-Tengli cross-Dandoti— Chittapur-Bhimanahalli-Handarki cross-Gurmitkal-Putpak at Rs. 7 crore, Narayankhed-Nizampet Road at Rs. 1.37 crore; Zaheerabad-Bidar-Deglur at Rs. 2 crore; and Halbarga-Bhalki-Neelanga-Latur at Rs. 1.68 crore.

1 posts - Mon Nov 07, 2016 - are hidden. Click to open.

2 posts - Tue Nov 08, 2016 - are hidden. Click to open.

3010 views
Nov 09 2016 (08:05)
deepakyerr~   911 blog posts
Re# 2051271-4            Tags   Past Edits
It I'll come under SCR only. To ensure connectivity latur road nanded section should be taken up rather then bidar. Then it I'll be an alternate line from kolhapur up to banded further to wardha Nagpur.

3497 views
Nov 09 2016 (09:39)
SWR 6th cleanest zone in IR~   4216 blog posts   314 correct pred (69% accurate)
Re# 2051271-5            Tags   Past Edits
You're thinking from only Kolhapur connectivity perspective. New line should also include Mukhed(big town after Nanded in that region) also in it, Another survey of Udgir - Bodhan also in parallel.

2676 views
Nov 09 2016 (18:02)
Waiting for UBL MAQ exp~   2081 blog posts   730 correct pred (70% accurate)
Re# 2051271-6            Tags   Past Edits
I had asked so as SWR was tagged against SCR.
Sep 16 2016 (15:36)  Restored Track of Vikarabad-Sadasivapet section Temporarily Suspended (www.scr.indianrailways.gov.in)
back to top
Major Accidents/DisruptionsSCR/South Central  -  IR Press Release  

News Entry# 280305     
   Tags   Past Edits
Sep 16 2016 (3:36PM)
Station Tag: Bidar/BIDR added by kab mere acche din aayenge~/573824

Sep 16 2016 (3:36PM)
Station Tag: Vikarabad Junction/VKB added by kab mere acche din aayenge~/573824

Sep 16 2016 (3:36PM)
Train Tag: Secunderabad - Bidar Intercity Express/17010 added by kab mere acche din aayenge~/573824

Sep 16 2016 (3:36PM)
Train Tag: Bidar - Hyderabad Intercity Express/17009 added by kab mere acche din aayenge~/573824

Sep 16 2016 (3:36PM)
Train Tag: Hazur Sahib Nanded - KSR Bengaluru Express/16593 added by kab mere acche din aayenge~/573824

Posted by: Sunny Babu Brother of sampoornesh babu~  49 news posts
In view of the continuous rains and soil conditions of the breached parts of the track between Vikarabad-Sadasivapet Stations Vikarabad-Parli Section of Secunderabad Division is temporarily suspended for traffic movement. However, ballast trains are being run o­n experimental basis to test the track position with a speed restriction of 10 kms per hour. In this regard the following repercussions of train services are mentioned below.
1.Train No.16593 H.S.Nanded-KSR Bengaluru Express departed H.S. Nanded o­n 15th September 2016 ((Now at Zahirabad) is diverted to run via Latur Road, Latur and Kurudwadii.
2.Train No. 17010
...
more...
Secunderabad-Bidar Express departed Secunderabad is short terminated at Vikarabad.
3. Train No. 17009 Bidar-Hyderabad scheduled to depart Bidar o­n 16th September, 2016 will now depart from Vikarabad.
Sep 12 2016 (21:51)  बस तीन माह की मेहमान है अकोला-महू मीटरगेज ट्रेन (googleweblight.com)
back to top
New Facilities/TechnologyWR/Western  -  

News Entry# 279908   Blog Entry# 1989779     
   Tags   Past Edits
Sep 12 2016 (10:16PM)
Station Tag: Hyderabad Deccan Nampally/HYB added by 🚂मिनाक्षी एक्सप्रेस/873766

Sep 12 2016 (10:16PM)
Station Tag: Bidar/BIDR added by 🚂मिनाक्षी एक्सप्रेस/873766

Sep 12 2016 (10:16PM)
Station Tag: Parbhani Junction/PBN added by 🚂मिनाक्षी एक्सप्रेस/873766

Sep 12 2016 (10:16PM)
Station Tag: Purna Junction/PAU added by 🚂मिनाक्षी एक्सप्रेस/873766

Sep 12 2016 (10:16PM)
Station Tag: Badnera Junction (Amravati)/BD added by 🚂मिनाक्षी एक्सप्रेस/873766

Sep 12 2016 (10:16PM)
Station Tag: Amravati (Terminal)/AMI added by 🚂मिनाक्षी एक्सप्रेस/873766

Sep 12 2016 (9:51PM)
Station Tag: Udaipur City/UDZ added by 🚂मिनाक्षी एक्सप्रेस/873766

Sep 12 2016 (9:51PM)
Station Tag: Jaipur Junction/JP added by 🚂मिनाक्षी एक्सप्रेस/873766

Sep 12 2016 (9:51PM)
Station Tag: Ajmer Junction/AII added by 🚂मिनाक्षी एक्सप्रेस/873766

Sep 12 2016 (9:51PM)
Station Tag: Ujjain Junction/UJN added by 🚂मिनाक्षी एक्सप्रेस/873766

Sep 12 2016 (9:51PM)
Station Tag: Ratlam Junction/RTM added by 🚂मिनाक्षी एक्सप्रेस/873766

Sep 12 2016 (9:51PM)
Station Tag: Indore Junction BG/INDB added by 🚂मिनाक्षी एक्सप्रेस/873766

Sep 12 2016 (9:51PM)
Station Tag: Mhow/MHOW added by 🚂मिनाक्षी एक्सप्रेस/873766

Sep 12 2016 (9:51PM)
Station Tag: Khandwa Junction/KNW added by 🚂मिनाक्षी एक्सप्रेस/873766

Sep 12 2016 (9:51PM)
Station Tag: Akola Junction/AK added by 🚂मिनाक्षी एक्सप्रेस/873766

Sep 12 2016 (9:51PM)
Station Tag: Hazrat Nizamuddin/NZM added by 🚂मिनाक्षी एक्सप्रेस/873766

Sep 12 2016 (9:51PM)
Station Tag: Hazur Sahib Nanded/NED added by 🚂मिनाक्षी एक्सप्रेस/873766

Sep 12 2016 (9:51PM)
Station Tag: Secunderabad Junction/SC added by 🚂मिनाक्षी एक्सप्रेस/873766

Sep 12 2016 (9:51PM)
Train Tag: Ratlam-Ajmer Express/19653 added by 🚂मिनाक्षी एक्सप्रेस/873766

Sep 12 2016 (9:51PM)
Train Tag: Hazur Sahib Nanded - Amritsar Super Fast Express/12421 added by 🚂मिनाक्षी एक्सप्रेस/873766

Sep 12 2016 (9:51PM)
Train Tag: Hazur Sahib Nanded - Sriganganagar Express/12485 added by 🚂मिनाक्षी एक्सप्रेस/873766

Sep 12 2016 (9:51PM)
Train Tag: Jaipur - Secunderabad Express/19713 added by 🚂मिनाक्षी एक्सप्रेस/873766

Sep 12 2016 (9:51PM)
Train Tag: Indore - Yesvantpur Weekly Express/19301 added by 🚂मिनाक्षी एक्सप्रेस/873766

Posted by: 🚂अलविदा खंडवा मिटरगेज🙋🙋~  88 news posts
खंडवा. नांदेड डिवीजन अकोला से खंडवा के बीच गेज परिवर्तन को लेकर दिसंबर माह में मीटरगेज ट्रैक बंद करने की तैयारी में है। रेलवे ने गेज परिवर्तन की कागजी तैयारी पूरी कर ली है। निर्माण कार्य के लिए जारी हुए टैंडर 19 सितंबर को बंद होंगे। साथ ही 20 सितंबर को रेलवे डाले गए टैंडरों की समीक्षा कर ठेकेदार को टैंडर देगा। टैंडर होते ही करीब 180 करोड़ की लागत से अकोला से आकोट के बीच गेज परिवर्तन का निर्माण कार्य शुरू किया जाएगा। रेलवे की मानें तो अकोला से खंडवा के बीच दो चरणों में गेज परिवर्तन करेगा। इसमें पहले चरण में अकोला से आकोट और दूसरे चरण में आकोट से खंडवा के बीच काम होगा। आकोट से खंडवा के बीच गेज परिवर्तन के लिए मेलघाट टाइगर रिजर्व के जंगल से ट्रैक बिछाने रेलवे को पर्यावरण मंत्रालय से अनुमति नहीं मिली है। इधर महू से खंडवा के बीच नबंवर में...
more...
गेज परिवर्तन का कार्य शुरू होने के कयास लगाए जा रहे है।
अब भी अधर में है आकोट-खंडवा
आकोट से खंडवा तक गेज परिवर्तन करने साउथ सेंट्रल रेलवे के सामने मेलघाट टाइगर रिजर्व का क्षेत्र अब भी रोड़ा बना हुआ है। वन विभाग से अनुमति मिलने के बाद मामला पर्यावरण मंत्रालय में अटक गया है। मेलघाट से लाइन बिछाने रेलवे को पर्यावरण मंत्रालय से हरिझंडी नहीं मिल सकी है। हालांकि रेलवे को उम्मीद है कि अकोला-आकोट के बीच काम शुरू होते ही मेलघाट की अनुमति मिल जाएगी।
गेज परिवर्तन से दूरी होगी कम
गेज परिवर्तन से राजस्थान (जयपुर, सवाई, माधौपुर, अजमेर) एवं दिल्ली से दक्षिण भारत के चेन्नई, बैंगलोर आदि जगह जाने वाली ट्रेनें रतलाम, नागदा, भोपाल होकर गंतव्य कर रही हैं। उन सभी की दूरी रतलाम, महू, खंडवा, अकोला, भुसावल, होकर जाने से करीब 400 किमी कम होगी। वहीं, बैंगलुर-इंदौर से नई ट्रेन में 824 किमी की दूरी कम हो जाएगी।
रेलमार्ग से जुड़ेंगे ये स्थान
इस लाइन से महू का मिलेट्री एरिया, पीथमपुर औद्योगिक क्षेत्र, बड़वाह सीआईएसएफ, ओंकारेश्वर ज्योर्तिलिंग एवं गणगौर ताप परियोजना जिला खरगोन आदि स्थान को जोड़ा जा सकेगा। रेल मार्ग की सुविधा के अभाव में राजस्थान के विभिन्न शहर जयपुर, उदयपुर, भीलवाड़ा, चुरू, बांसवाड़ा, कोटा आदि स्थानों से खंडवा एवं ओंकारेश्वर आने वाले दर्शनार्थियों को बस का सहारा लेना पड़ रहा है। मीटरगेज लाइन ब्राडगेज होने से उक्त स्थानों के यात्रियों को रेल सुविधा मिल सकेगी। इसके अलावा अजमेर जाने वाले आंध्रप्रदेश, महाराष्ट्र और मध्यप्रदेश के हजारों जायरीन को महंगे और लंबे सफर के लिए तैयार होना पड़ेगा।
1400 करोड़ से अधिक की योजना
रतलाम-महू-अकोला तक 472.64 किलोमीटर रेलखंड का गेज परिवर्तन का काम अप्रैल 10 से प्रस्तावित है। योजना में रतलाम-महू के बीच 1421.25 करोड़ खर्च का आकलन है। इसमें रतलाम-महू के बीच प्रारंभिक लागत 603 करोड़ रुपए आंकी गई। रतलाम-फतेहाबाद के बीच काम शुरू होने पर पिछले बजट में 29 करोड़ रुपए स्वीकृत हुए। नवंबर 11 में 40 करोड़ रुपए प्राप्त हुए। जबकि रेल बजट में 35 करोड़ रुपए की घोषणा की गई थी।
गेज परिवर्तन को लेकर कागजी कार्रवाई शुरू हो गई है। 20 सितंबर को टैंडर हो जाएंगे। वहीं दिसंबर माह में ट्रैक बंद कर निर्माण कार्य शुरू करने की तैयारी है। पहले चरण में अकोला से आकोटा के बीच गेज परिवर्तन किया जाएगा। मेलघाट मामले में पर्यावरण मंत्रालय से अनुमति मिलने का इंतजार है।
डॉ. एके सिन्हा, डीआरएम, नांदेड मंडल

1 posts - Mon Sep 12, 2016 - are hidden. Click to open.

22077 views
Sep 13 2016 (00:04)
® राहुल जैन ☺ झाडू वाले™🚅🚃🚃🚃🚃🚃*^~   10061 blog posts   14938 correct pred (63% accurate)
Re# 1989779-2            Tags   Past Edits

Sep 13 2016 (14:54)
Sahil Khan   12 blog posts
Re# 1989779-3            Tags   Past Edits
Great news
ऐसा लग रहा है की २-३ साल मे काचिगुडा-जयपुर मिनाक्षि एक्सप्रेस(via,नांदेड-पुर्णा-अकोला-खंडवा-महू-रतलाम- अजमेर) रूट से जल्द हि दौडेगी।

20245 views
Sep 13 2016 (15:07)
Mahamana and Tejas incidents very shameful^~   81774 blog posts   5226 correct pred (78% accurate)
Re# 1989779-4            Tags   Past Edits
ye tiger reserve ki wajah se bahut jyada delay ho gaya hai...

20198 views
Sep 13 2016 (15:25)
🚂अलविदा खंडवा मिटरगेज🙋🙋~   631 blog posts
Re# 1989779-5            Tags   Past Edits
yes,agar Speaker SUMITRA TAI MAHAJAN MHOW-KHANDWA-AKOLA G.C.me apni dakhal de to 2 saal me hi MHOW-AKOLA Route par BG trains daudegi

20119 views
Sep 13 2016 (17:52)
anoop.kothari   2 blog posts
Re# 1989779-7            Tags   Past Edits
2 year is too much of expectation
Sep 03 2016 (21:08)  18 Special Trains between Tirupati and Nagarsol during Dussehra & Diwali Festival Season (www.scr.indianrailways.gov.in)
back to top
New/Special TrainsSCR/South Central  -  IR Press Release  

News Entry# 279038   Blog Entry# 1980457     
   Tags   Past Edits
Sep 03 2016 (9:08PM)
Station Tag: Aurangabad/AWB added by kab mere acche din aayenge~/573824

Sep 03 2016 (9:08PM)
Station Tag: Jalna/J added by kab mere acche din aayenge~/573824

Sep 03 2016 (9:08PM)
Station Tag: Vikarabad Junction/VKB added by kab mere acche din aayenge~/573824

Sep 03 2016 (9:08PM)
Station Tag: Bidar/BIDR added by kab mere acche din aayenge~/573824

Sep 03 2016 (9:08PM)
Station Tag: Zahirabad/ZB added by kab mere acche din aayenge~/573824

Sep 03 2016 (9:08PM)
Station Tag: Nizamabad Junction/NZB added by kab mere acche din aayenge~/573824

Sep 03 2016 (9:08PM)
Station Tag: Nagarsol/NSL added by kab mere acche din aayenge~/573824

Sep 03 2016 (9:08PM)
Station Tag: Nalgonda/NLDA added by kab mere acche din aayenge~/573824

Sep 03 2016 (9:08PM)
Station Tag: Nalanda/NLD added by kab mere acche din aayenge~/573824

Sep 03 2016 (9:08PM)
Station Tag: Guntur Junction/GNT added by kab mere acche din aayenge~/573824

Sep 03 2016 (9:08PM)
Station Tag: Tirupati Main/TPTY added by kab mere acche din aayenge~/573824

Sep 03 2016 (9:08PM)
Station Tag: Renigunta Junction/RU added by kab mere acche din aayenge~/573824

Sep 03 2016 (9:08PM)
Station Tag: Secunderabad Junction/SC added by kab mere acche din aayenge~/573824

Sep 03 2016 (9:08PM)
Train Tag: Nagarsol - Tirupati (via Guntur) Special Fare Special/07418 added by kab mere acche din aayenge~/573824

Sep 03 2016 (9:08PM)
Train Tag: Tirupati - Nagarsol (via Guntur) Special Fare Special/07417 added by kab mere acche din aayenge~/573824

Posted by: Sunny Babu Brother of sampoornesh babu~  49 news posts
In order to clear extra rush of passengers during Dussehra and Diwali festival season, eighteen special trains will be run between Tirupati and Nagarsol via., Secunderabad as detailed below:-
Train No 07417 Tirupati – Nagarsol Special Train will depart Tirupati at 07:30 hrs o­n 16th, 23rd, 30th September, 7th, 14th, 21st, 28th October, 4th and 11th November, 2016 (Friday) arrive/depart Secunderabad at 20:15/20:25 hrs o­n the same day and arrive Nagarsol at 11.55hrs o­n the next day.
In the return
...
more...
direction, Train No.07418 Nagarsol - Tirupati Special Train will depart Nagarsol at 22:00 hrs o­n 17th, 24th September, 1st, 8th, 15th, 22nd, 29th October, 5th and 12th November, 2016 (Saturday), arrive/depart Secunderabad at 11:55/12:05 hrs o­n the next day and arrive Tirupati at 04:00 hrs o­n Mondays.
Enroute, these special trains will also stop at Renigunta, Gudur, Nellore, o­ngole, Tenali, Guntur, Sattenapalli, Piduguralla, Nadikudi, Miryalguda, Nalgonda, Cherlapalli, Begumpet, Lingampalli, Shankarpalli, Vikarabad, Zahirabad, Bidar, Bhalki, Udgir, Latur Road, Pangaon, Parli, Gangakher, Parbhani, Manavat Road, Selu, Partur, Jalna and Aurangabad stations in both directions.
These special trains will consist of 19 coaches viz., o­ne AC II Tier, three AC III Tier, seven Sleeper Class, six General Second class and two Second Class Luggage cum Brake Van Coaches.

2 posts - Sat Sep 03, 2016 - are hidden. Click to open.

11694 views
Sep 04 2016 (14:18)
pslkumar   331 blog posts
Re# 1980457-3            Tags   Past Edits
request scr to start follw.spl exp. train
tpty-sbc ice or o/n
bza-sbc/mys o/n via gdr, kpd
bza/gnt-tpty ice
Aug 12 2016 (09:07)  Lecturer thrashed on suspicion of pickpocketing (m.deccanherald.com)
back to top
Crime/AccidentsSWR/South Western  -  

News Entry# 276994     
   Tags   Past Edits
Aug 12 2016 (9:07AM)
Station Tag: Bidar/BIDR added by Vinod KL~/1264560

Aug 12 2016 (9:07AM)
Station Tag: Yesvantpur Junction/YPR added by Vinod KL~/1264560

Aug 12 2016 (9:07AM)
Train Tag: Bidar - Yesvantpur Express/16572 added by Vinod KL~/1264560

Posted by: Design Engineer at Johnson controls~  37 news posts
A private college lecturer from Yadgir was thrashed by the public who claimed that he had picked the pockets of four passengers on Bidar Express train on Thursday. He was handed over to the Yeshwantpur Railway police.
According to the police, Nagaraju was travelling to the city by Bidar Express to meet his relative. Four people in the compartment found they had lost their wallets and suspected Nagaraju and thrashed him. The other passengers also entered the fray.
They handed him over to the police and lodged a complaint. When Nagaraju was checked,
...
more...
the police could not find any money on him. Nagaraju claimed that he was unaware who had picked the pockets and that he was being framed for no fault of his, said the police.
A case has been registered at the Yeshwantpur Railway police station.
Aug 11 2016 (07:09)  Kalaburagi-Bidar line to be commissioned in February 2017 (www.railnews.co.in)
back to top
Rail BudgetCR/Central  -  

News Entry# 276779   Blog Entry# 1958214     
   Tags   Past Edits
This is a new feature showing past edits to this News Post.

Posted by: ✿ఛుక్ 🚃 ఛుక్ 🚃 రైలు✿~  54 news posts
Kalaburagi-Bidar line to be commissioned in February 2017
10 Aug, 2016 in Central Railway, Solapur Division / South Central Railway, Secunderabad Division by rail
Gulbarga Bidar lineKalaburagi: The long-pending Kalaburagi-Bidar new rail line will be commissioned in February 2017 after the completion of the ongoing works on laying rail lines and construction of railway stations between Kalaburagi and Humnabad, Ajai Kumar Dubey, Divisional Railway Manager, Central Railway, has said.Speaking at the flagging of ceremony of the Gulbarga-Hyderabad Inter-city Express on Monday, he outlined the works taken up by the Railways in the
...
more...
Kalaburagi region.
He said that the fourth platform at the Gulbarga Railway Station, constructed at a cost of Rs. 4.5 crore, would be commissioned in September and the second foot overbridge along with a lift in the fourth platform, set up at a cost of Rs. 2.6 crore, would be commissioned by March 2017.
The road overbridge at Mother Teresa School on the New Jewargi Road, taken up at a cost of Rs. 20 crore, was expected to be completed by June 2017.
The road overbridge on Kalaburagi-Afzalpur Road, taken up at a cost of Rs. 5.5 crore, would be completed by December. The installation of closed-circuit television cameras at the Gulbarga Railway Station under the Nirbhaya fund would also be completed in the same month. Mr. Dubey said that the rail underbridge at Tarfile near the Gulbarga Railway Station, taken up at a cost of Rs. 3.9 crore, would be completed by September and the second entry to the Gulbarga Railway Station would be completed on August 31.
The Railways also proposes to take up the work on a road overbridge to replace the level crossing at Hirapur and Balram Chowk in Chittapur at an estimated cost of Rs. 56 crore. The Gangapur Road Railway Station would be developed and a foot overbridge would be constructed at an estimated cost of Rs. 5.5 crore.
Pitline and Fourth platform at Gulbarga Railway Station will be commissioned in September
Mr. Dubey said that the Railways had completed the work on constructing a pit-line for carriage maintenance of 26 coaches in Gulbarga Railway Station at a cost of Rs. 6.21 crore and provided cover over platform in the first platform at the Gulbaga Railway Station at a cost of Rs. 54.64 lakh. The Railways had started using bio-diesel at Wadi Railway Consumer Depots.
Gulbarga-Hyderabad Inter-city Express resumes service
Railway Minister Suresh Prabhu flagged off the Gulbarga-Hyderabad Inter-city Express through a video link from the Secunderabad Railway Station on Monday. He was joined by Medical Education Minister Sharanprakash Patil at the Gulbarga Railway Station.
The same train was inaugurated without any official function in February. But the service was discontinued after a month owing to lack of response from passengers. Major reasons for this were the unsuitable departure timing of the train from the Gulbarga and Hyderabad railway stations and the decision by the Railways not to provide halts at Chittapur, Malkhed and Sedam stations.
No official reason was given for the flagging of the train for the second time. The schedule of the train and halts remain the same. Senior officials did not give any reason for not changing them.
Dr. Patil said that the timing should be changed to suit the requirement of passengers and the Railways should provide halts at Chittapur, Malkhed and Sedam stations. Basavaraj Patil Sedam, MP, said that he had discussed the issue with the Railway Minister. He also demanded that the Railway Ministry start the work of setting up a railway divisional headquarters in Kalaburagi.
The former Minister Qamarul Islam expressed his happiness over the resumption of the train and wanted more halts and a change in the timing.
The train would start at 10.15 a.m. in Kalaburagi and reach Hyderabad at 2.50 p.m. While returning, the train will leave Hyderabad at 4 p.m. and reach Kalaburagi at 9 p.m.
The train will stop at Shahabad, Wadi, Tandur, Vikarabad, and Lingampally.
This train will have one AC chair car, and 10 coaches of second class reserved coaches.
Divisional Railway Manager of Central Railways at Solapur Ajai Kumar Dubey was present.
The train was inaugurated in February, but the service was discontinued

5 posts - Thu Aug 11, 2016 - are hidden. Click to open.

5764 views
Aug 12 2016 (08:01)
Hyderabad Karnataka needs a dedicated train to SBC*^~   9687 blog posts   497 correct pred (74% accurate)
Re# 1958214-6            Tags   Past Edits
Bidar YPR should be in existing route , they can divert Nanded

5689 views
Aug 12 2016 (09:42)
skumarvkulkarni~   1665 blog posts
Re# 1958214-7            Tags   Past Edits
yes sir Bangalore-Nanded Express can be rerouted and also can be speeded up by 30 minutes if it goes via Bidar-Gulbarga line

5675 views
Aug 12 2016 (09:49)
✿ఛుక్ 🚃 ఛుక్ 🚃 రైలు✿~   4008 blog posts   149 correct pred (71% accurate)
Re# 1958214-8            Tags   Past Edits
Then AWB - renigunta exp also has to change the route via Gr-Bidr(khanapur)

5553 views
Aug 12 2016 (20:27)
ajay.vasmate   5 blog posts
Re# 1958214-9            Tags   Past Edits
AWB-Renigunta might change the route, but for sure it goes via Bidar.
Page#    Showing 1 to 20 of 32 News Items  next>>

Scroll to Top
Scroll to Bottom


Go to Desktop site