Full Site Search  
Wed Jan 25, 2017 02:46:43 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search

ERN/Ernakulam Town (North) (2 PFs)
എറണാകുളം ടൗൺ (നോർത്ത്)     एरणाकुलम टाउन (उत्तर)
[North, Kochi]

Track: Double Electric-Line

Type of Station: Regular
Number of Platforms: 2
Number of Halting Trains: 101
Number of Originating Trains: 0
Number of Terminating Trains: 0
Jn Pt ERS/KTYM/TCR, Xavier Arakkal Road North Ernakulam Tel: 0484 2395198
State: Kerala
Elevation: 9 m above sea level
Zone: SR/Southern
Division: Thiruvananthapuram (Trivandrum)
2 Travel Tips
No Recent News for ERN/Ernakulam Town (North)
Nearby Stations in the News

Rating: 4.2/5 (85 votes)
cleanliness - excellent (11)
porters/escalators - good (10)
food - good (11)
transportation - excellent (11)
lodging - good (10)
railfanning - good (10)
sightseeing - excellent (11)
safety - good (11)

Nearby Stations

ERG/Ernakulam Goods 1 km     ERS/Ernakulam Junction (South) 2 km     IPL/Idappally 6 km     MTNC/Mattancheri Halt 7 km     TNU/Tirunettur 7 km     TRTR/Thrippunithura 10 km     KUMM/Kumbalam 10 km     KLMR/Kalamassery 11 km     KFE/Chottanikkara Road 14 km     AROR/Aroor Halt 15 km    

Station News

Page#    Showing 1 to 20 of 44 News Items  next>>
Jan 02 2017 (18:12)  പുനലൂർ - പാലക്കാട് എക്സ്പ്രസ് ജനുവരി അവസാനത്തോടെ (m.manoramaonline.com)
back to top
New/Special TrainsSR/Southern  -  

News Entry# 290317     
   Tags   Past Edits
Jan 02 2017 (6:15PM)
Station Tag: Kayamkulam Junction/KYJ added by imaravIndian^~/436575

Jan 02 2017 (6:15PM)
Station Tag: Tiruvalla/TRVL added by imaravIndian^~/436575

Jan 02 2017 (6:12PM)
Station Tag: Chengannur/CNGR added by imaravIndian^~/436575

Jan 02 2017 (6:12PM)
Station Tag: Palakkad Junction (Palghat)/PGT added by imaravIndian^~/436575

Jan 02 2017 (6:12PM)
Station Tag: Shoranur Junction/SRR added by imaravIndian^~/436575

Jan 02 2017 (6:12PM)
Station Tag: Kollam Junction (Quilon)/QLN added by imaravIndian^~/436575

Jan 02 2017 (6:12PM)
Station Tag: Ernakulam Town (North)/ERN added by imaravIndian^~/436575

Jan 02 2017 (6:12PM)
Station Tag: Ernakulam Junction (South)/ERS added by imaravIndian^~/436575

Jan 02 2017 (6:12PM)
Station Tag: Punalur/PUU added by imaravIndian^~/436575

Jan 02 2017 (6:12PM)
Station Tag: Kottayam/KTYM added by imaravIndian^~/436575

Jan 02 2017 (6:12PM)
Train Tag: Mangaluru - Thiruvananthapuram Express/16348 added by imaravIndian^~/436575

Jan 02 2017 (6:12PM)
Train Tag: Venad Express/16302 added by imaravIndian^~/436575

Jan 02 2017 (6:12PM)
Train Tag: Venad Express/16301 added by imaravIndian^~/436575

Posted by: imaravIndian^~  99 news posts
കൊച്ചി∙ പുതുവർഷ സമ്മാനമായി എറണാകുളത്തേക്കു പുതിയ ട്രെയിൻ സർവീസ്. പുനലൂർ-പാലക്കാട് എക്സ്പ്രസാണു പുതിയതായി അനുവദിക്കുക. കൊടിക്കുന്നിൽ സുരേഷ് എംപിയുടെ ശ്രമഫലമായാണു പുതിയ ട്രെയിൻ ലഭിക്കാൻ വഴിതെളിഞ്ഞത്. മുൻപ് ആവശ്യപ്പെട്ട പുനലൂർ–എറണാകുളം ട്രെയിനാണു പാലക്കാട്ടേക്കു നീട്ടുന്നത്. തിരക്കു കാരണം കാലുകുത്താൻ കഴിയാത്ത തിരുവനന്തപുരം – ഷൊർണൂർ വേണാട് എക്സ്പ്രസിനു ബദലായി രാവിലെയും വൈകിട്ടും കൊച്ചിയിലേക്കു മറ്റൊരു ട്രെയിൻ വേണമെന്ന ആവശ്യത്തിനു വർഷങ്ങളുടെ പഴക്കമുണ്ട്. രാവിലെ 10ന് മുൻപു എറണാകുളത്ത് എത്തുന്ന തരത്തിലാണു സർവീസ് ആരംഭിക്കുകയെന്നു എംപി പറഞ്ഞു. രാവിലെ വേണാടിനു മുൻപു എറണാകുളത്തേക്കു നിലവിൽ കോട്ടയം വഴി എക്സ്പ്രസ് സർവീസില്ല. മിക്ക ദിവസവും 10.20ന് എത്തുന്ന വേണാടിൽ ഇതിനാൽ വൻതിരക്കാണ് അനുഭവപ്പെടുന്നത്.
വൈകിട്ടും സ്ഥിതി വ്യത്യസ്തമല്ല. അഞ്ചിനു വേണാട് പോയി കഴിഞ്ഞാൽ പിന്നീടു രാത്രി 11.35നാണ് കോട്ടയം വഴി അടുത്ത പ്രതിദിന എക്സ്പ്രസ്. പുതിയ ട്രെയിൻ രാവിലെ 9.45നും മടക്ക യാത്രയിൽ രാത്രി 7.10നും എറണാകുളത്ത് എത്തുമെന്നാണു സൂചന. സമയക്രമം സംബന്ധിച്ചു അന്തിമ തീരുമാനം വൈകാതെയുണ്ടാകും. ഇക്കാര്യത്തിൽ റെയിൽവേ ബോർഡ് ഉദ്യോഗസ്ഥരുമായി ചൊവ്വാഴ്ച ചർച്ച നടത്തുമെന്നു എംപി അറിയിച്ചു. കൊല്ലം – എറണാകുളം ജംക്‌ഷൻ, ഷൊർണൂർ വഴിയാണു സർവീസ് നിർദേശിച്ചതെങ്കിലും മൂന്നു സ്ഥലങ്ങളിലും
...
more...
എഞ്ചിൻ മാറ്റുന്നതു പ്രായോഗികമല്ലെന്നാണു റെയിൽവേ നിലപാട്. ഷൊ‍ർണൂർ ഒഴിവാക്കുകയും എറണാകുളം ജംക്‌ഷനു പകരം എറണാകുളം ടൗണിൽ നിർത്തുകയും ചെയ്താൽ ഒരു മണിക്കൂറോളം സമയം ലാഭിക്കാൻ കഴിയുമെന്നും അധികൃതർ ചൂണ്ടിക്കാട്ടുന്നു.
ട്രെയിനിനു പാലരുവി എക്സ്പ്രസ് എന്നു പേരു നൽകണമെന്നു റെയിൽവേ ബോർഡിനോട് ആവശ്യപ്പെട്ടിട്ടുണ്ടെന്നു കൊടിക്കുന്നിൽ പറഞ്ഞു. പുനലൂരിൽനിന്നു ബെംഗളൂരു വഴി ഹൈദരാബാദിലേക്കു പുതിയ സർവീസ് ആരംഭിക്കാനും അങ്കമാലി - എരുമേലി ശബരി പാത എരുമേലിയിൽനിന്നു പുനലൂരേക്കു നീട്ടാനും ആവശ്യപ്പെട്ടിട്ടുണ്ടെന്നും എംപി അറിയിച്ചു. ശബരി എക്സ്പ്രസ് ഹൈദരാബാദിലെത്താൻ 30 മണിക്കൂർ എടുക്കുമ്പോൾ ബെംഗളൂരു വഴി ഹൈദരാബാദിലെത്താൻ 26 മണിക്കൂർ മതിയാകും. അതേസമയം കൊച്ചി നിവാസികൾ ഏറെക്കാലമായി ആവശ്യപ്പെടുന്ന എറണാകുളം - രാമേശ്വരം, സേലം ട്രെയിനുകളുടെ കാര്യത്തിൽ ഇപ്പോഴും തീരുമാനമില്ല.
രാവിലെ 10ന് മുൻപായി കോയമ്പത്തൂരിലെത്താൻ ട്രെയിൻ വേണമെന്ന ആവശ്യവും പരിഗണിച്ചിട്ടില്ല. ഏറെ മുറവിളികൾക്കു ശേഷം ആരംഭിച്ച വേളാങ്കണി സർവീസാകട്ടെ തീർഥാടകർക്കു ഉപകാരമില്ലാത്ത വ്യാഴാഴ്ചകളിലാണു സർവീസ് നടത്തുന്നത്. ഈ സർവീസും ഇപ്പോൾ നിലച്ച മട്ടാണ്. ഈ ട്രെയിൻ പ്രതിദിനമാക്കുകയോ വെളളിയാഴ്ച കേരളത്തിൽനിന്നു പുറപ്പെടുന്ന തരത്തിൽ പുനഃക്രമീകരിക്കുകയോ വേണമെന്നാണു ആവശ്യം. റേക്കില്ലെന്ന കാരണം പറഞ്ഞു കേരളത്തിനു ട്രെയിൻ നിഷേധിക്കുന്ന റെയിൽവേ ഈ വർഷം 18 പുതിയ ട്രെയിനുകളാണു വിവിധ ഭാഗങ്ങളിൽ അനുവദിച്ചത്. പാലക്കാട്–പുനലൂർ ട്രെയിനിനു ജനുവരി അവസാനത്തോടെ ഉത്തരേന്ത്യയിൽനിന്നു റേക്ക് എത്തുമെന്നാണു സൂചന.  
© Copyright 2016 Manoramaonline. All rights reserved.
Dec 27 2016 (11:36)  Modern waiting hall opened at Ernakulam Town (www.newindianexpress.com)
back to top
IR AffairsSR/Southern  -  

News Entry# 289750     
   Tags   Past Edits
Dec 27 2016 (11:36AM)
Station Tag: Ernakulam Town (North)/ERN added by Main Forum Has become TL Forum Nowadays^~/1246501

Posted by: onlyLHBRAKEintrains  40 news posts
KOCHI: Union Railway Minister Suresh Prabhu on Monday said Centre was working to improve travel experience of train passengers by comprehensively modernising railway infrastructure.
He was speaking after inaugurating the renovated thematic waiting hall at Ernakulam Town railway station, conjointly with Chief Minister Pinarayi Vijayan, through video-conferencing. The session also witnessed launch of a host of amenities at Kollam, Kannur and Thiruvananthapuram railway stations.
Speaking on the occasion, Prabhu said, “As part of upgrading railway infrastructure, special trains will be operated for the working class, which would allow passengers to board trains at
...
more...
night and reach their workplaces the next morning,” he said, adding, “Our focus is on providing all modern facilities to ordinary people.
Since we need resources for such developments, it would be done in partnership. The proposed infrastructure developments in Kerala would take the State’s railway sector to its optimum level. I am happy to announce that the CM has agreed for ‘joint venture’ with Railway Ministry,” he added.
Kochi Mayor Soumini Jain presided over the function. Ernakulam Town station area manager Hari Krishnan, Cochin Municipal chairperson Gracy Joseph, council member Aristotle, and Kudumbashree district coordinator Tanny Thomas also attended.
Dec 17 2016 (19:12)  ക്രിസ്മസ്, മണ്ഡലകാല യാത്രയ്ക്ക് : 4 സ്പെഷൽ ട്രെയിൻ (localnews.manoramaonline.com)
back to top
New/Special TrainsSWR/South Western  -  

News Entry# 288942     
   Tags   Past Edits
Dec 17 2016 (7:14PM)
Train Tag: Hubli- Kochuveli Special Fare Special/06557 added by onlyLHBRAKEintrains^~/1246501

Dec 17 2016 (7:13PM)
Station Tag: Ernakulam Town (North)/ERN removed by onlyLHBRAKEintrains^~/1246501

Dec 17 2016 (7:12PM)
Station Tag: Yesvantpur Junction/YPR added by MCPNBR~/261443

Dec 17 2016 (7:12PM)
Station Tag: Ernakulam Town (North)/ERN added by MCPNBR~/261443

Dec 17 2016 (7:12PM)
Station Tag: Kochuveli/KCVL added by MCPNBR~/261443

Dec 17 2016 (7:12PM)
Station Tag: Hubballi Junction (Hubli)/UBL added by MCPNBR~/261443

Posted by: MCPNBR~  359 news posts
ക്രിസ്മസ്, മണ്ഡലകാല യാത്രയ്ക്ക് : 4 സ്പെഷൽ ട്രെയിൻ Saturday 17 December 2016 08:11 AM IST
ബെംഗളൂരു ∙ കർണാടകയിൽ നിന്നുള്ള ക്രിസ്മസ്, ശബരിമല, പുതുവൽസര സ്പെഷൽ ട്രെയിൻ അനുവദിച്ചു. ഈ മാസം 20, 27, ജനുവരി മൂന്ന്, 10 തീയതികളിൽ ഹുബ്ബള്ളിയിൽ നിന്നു പുറപ്പെടുന്ന ട്രെയിൻ ബെംഗളൂരു, കോയമ്പത്തൂർ വഴി പിറ്റേന്നു രാവിലെ കൊച്ചുവേളിയിലെത്തും. അവിടെ നിന്നുള്ള മടക്ക ട്രെയിൻ 21, 28, ജനുവരി 4, 11 തീയതികളിൽ ബെംഗളൂരു വഴി ഹുബ്ബള്ളിയിലേക്കും സർവീസ് നടത്തും. റിസർവേഷൻ ഇന്നാരംഭിക്കും. ബെംഗളൂരുവിനു പുറമെ ഹുബ്ബള്ളിയിലെ മലയാളികൾക്കും സ്പെഷൽ ട്രെയിൻ പ്രയോജനകരമാകും.
Nov 26 2016 (09:03)  Ernakulam Town station to have more amenities (www.thehindu.com)
back to top
New Facilities/TechnologySR/Southern  -  

News Entry# 286831     
   Tags   Past Edits
Nov 26 2016 (9:03AM)
Station Tag: Ernakulam Town (North)/ERN added by Rail Fanning~/718429

Posted by: Rail Fanning~  125 news posts
Close on the heels of the opening of an air-conditioned waiting room at the Ernakulam Town railway station on Thursday, plans are afoot to open an eatery to be operated by Kudumbasree volunteers on the station premises.
Thiruvananthapuram Divisional Railway Manager Prakash Bhutani said the recently-opened Kudumbasree eatery at the Ernakulam Junction station had been receiving sound patronage from commuters who preferred local cuisine. “Temporary toilets too have been set up at the station, mainly to cater for Sabarimala pilgrims. The toilets are connected to a septic tank to ensure hygiene at the station which bagged a cleanliness award this year.”
However,
...
more...
the demand for at least one pay-and-use toilet in each platform at Ernakulam Junction and Town stations has fallen on deaf ears. At present, commuters on other platforms have to walk up to Platform No. 1 to gain access to toilets.
Commuters can now relax at the AC waiting hall operated by Kudumbasree, by paying Rs.20 an hour. It has toilets, display of train timings, and play area as well as space for mothers to feed. As many as 12 Kudumbasree volunteers are employed at this facility and the one at the Ernakulam Junction station. Kudumbasree also manages vehicle parking areas at the two stations.
Harbour Terminus
On the renovation of the Harbour Terminus station in Willingdon Island, Mr. Bhutani said the tender to replace tracks and the station building was being finalised. This will be followed by the installation of signalling and telecommunication equipment. The authorities hope to complete the work in a few months since trains do not operate to the station now, and therefore there is no need for imposing traffic curbs.
Old Railway Station
On reviving the Old Railway Station behind the High Court, Mr. Bhutani said the reopening of a case filed before the National Green Tribunal citing the station’s proximity to Mangalavanam and the delay in removing encroachers were the hurdles. “We have sent a Rs.14-crore proposal (to the Southern Railway) for reviving two tracks at the station and installing signals,” he added.
The second phase of work can be taken up subsequently as a railway or PPP initiative. The proposal to convert the station into a heritage structure too could be considered then, he said.
Sep 24 2016 (19:44)  Efficient waste disposal system at major railway stations (www.thehindu.com)
back to top
SR/Southern  -  

News Entry# 281083     
   Tags   Past Edits
Sep 24 2016 (7:44PM)
Station Tag: Ernakulam Town (North)/ERN added by Waiting for Report of Talgo~/726422

Sep 24 2016 (7:44PM)
Station Tag: Ernakulam Junction (South)/ERS added by Waiting for Report of Talgo~/726422

Posted by: mushfiquekhalid^~  159 news posts
Twenty railway stations in Kerala coming under the A+ and A categories, among 408 such stations across the country, have been earmarked by Railways to be equipped with an efficient waste disposal system. The system envisages separate dustbins for collection of biodegradable (wet) and non-biodegradable (dry) wastes on the platforms and all passenger interface areas.
The move is part of a railway initiative for environment-friendly disposal of waste.
All railway zones have been directed to train the staff engaged in cleaning duties for collection and further handling for final disposal of segregated dry
...
more...
and wet waste from the dustbins.
Railway zones were directed last Monday to provide the facility in all A+ category railway stations with immediate effect and at the A category railway stations by the end of the year. It means that Thiruvananthapuram Central, Ernakulam Junction, Thrissur and Kozhikode stations will be equipped with the system before the end of this month.
The A category railway stations in the State where the system is to be implemented by the year end are Alappuzha, Aluva, Chengannur, Kanhangad, Kannur, Kasaragod, Kayamkulam, Kollam, Kottayam, Palakkad, Payyannur, Shoranur, Thalassery, Tirur, Thiruvalla, and Vadakara.
The dustbin with polythene liner bags for biodegradable waste will be green in colour and those for non-biodegradable waste will be black in colour.
Railways have already given directions that for environment-friendly disposal of waste from pantry cars and eatery stalls on platforms, adequate dustbins on platforms and by the side of stalls at all railway stations should be provided.
Jul 23 2016 (12:37)  Water Metro: Procurement of boats to begin in 2018 (www.newindianexpress.com)
back to top
New Facilities/Technology

News Entry# 274568     
   Tags   Past Edits
Jul 23 2016 (12:37PM)
Station Tag: Ernakulam Town (North)/ERN added by For Better Managed Indian Railways~/1546020

Posted by: For Better Managed Indian Railways~  945 news posts
KOCHI: Procurement of modernised boats for the Water Metro project will begin in 2018, said officials of the Kochi Metro Rail Limited (KMRL).
A draw-down agreement was signed on Friday between the KMRL and German Development Bank KfW for a EUR85-million loan for the Water Metro project. The general consultant for the project will be appointed soon.
“The integrated water transport project Water Metro, which will be launched on Saturday, is going to be a lot more beneficial to the people of Kochi than the Metro Rail, because it seeks to transform the
...
more...
lives of financially backward people living in the islands and the Vembanad lagoon by giving them access to the economic opportunities available in the city,” said KMRL managing director Elias George. “The Water Metro project is not just about launching boats in water, but is also about building roads in the islands and plying electric buses on those roads. There is even a ‘lighting component’ in the project, to ensure that people will be able to go home and work for longer hours without security concerns. The project will also focus on creating a system that gives the public an option to leave behind their private vehicles and use public transportation, once the integrated transport model is in place. Altogether, the KMRL expects to have the boats in water by 2018, and complete the entire project in the next four years,” he added.
The total cost of the project is Rs 747 crore, excluding the Rs 72 crore required for land acquisition. KfW will provide financial assistance to the extent of EUR 85 million(around Rs 597 crore) as a long-term soft loan. The project will be financed by the Indo-German Bilateral Cooperation, under the‘Climate Friendly Urban Mobility Plan.’ Earlier, the loan agreement was signed between KMRL director (Finance) Abraham Oommen and KfW-Urban Development and Mobility Division head Felix Klauda in the presence of German Ambassador to India Martin Ney, Kochi Mayor Soumini Jain and KMRL MD Elias George.
Jun 07 2016 (09:15)  കൊച്ചി മെട്രോ ആദ്യഘട്ട കമ്മിഷനിങ് അടുത്ത മാർച്ചിലേക്കു നീണ്ടേക്കും (www.manoramaonline.com)
back to top
New Facilities/TechnologyKMRC/Kochi Metro  -  

News Entry# 270213     
   Tags   Past Edits
Jun 07 2016 (9:15AM)
Station Tag: Aluva (Alwaye)/AWY added by AK22660™^/436575

Jun 07 2016 (9:15AM)
Station Tag: Ernakulam Town (North)/ERN added by AK22660™^/436575

Jun 07 2016 (9:15AM)
Station Tag: Ernakulam Junction (South)/ERS added by AK22660™^/436575

Posted by: imaravIndian^~  99 news posts
തിരുവനന്തപുരം ∙ കൊച്ചി മെട്രോയുടെ ആലുവ മുതൽ മഹാരാജാസ് കോളജ് ഗ്രൗണ്ട് വരെയുള്ള ആദ്യഘട്ടത്തിന്റെ കമ്മിഷനിങ് അടുത്ത വർഷം മാർച്ചിലേക്കു നീണ്ടുപോയേക്കും. ഇൗ വർഷം നവംബർ ഒന്നിനു കേരളപ്പിറവി ദിനത്തിൽ മെട്രോ സർവീസ് കമ്മിഷൻ ചെയ്യാനായിരുന്നു നേരത്തേയുള്ള തീരുമാനം.
ഇന്നലെ മുഖ്യമന്ത്രി പിണറായി വിജയനു മുന്നിൽ മെട്രോ പദ്ധതിയുടെ പുരോഗതി വിലയിരുത്താൻ ചേർന്ന യോഗത്തിലാണു കൊച്ചി മെട്രോ റെയിൽ ലിമിറ്റഡ് അധികൃതർ ഇതു സംബന്ധിച്ചു സൂചന നൽകിയത്. സിവിൽ ജോലികൾ ഏറെക്കുറെ തീർന്നെങ്കിലും മെട്രോ കമ്മിഷനിങ്ങിന് ഇനിയും ഏറെ കാര്യങ്ങൾ അവശേഷിക്കുകയാണ്.
ഇൗ സാഹചര്യത്തിൽ നവംബറിൽ പദ്ധതി കമ്മിഷൻ ചെയ്യുക എളുപ്പമാവില്ലെന്നു കെഎംആർഎൽ അറിയിച്ചു. അടുത്തവർഷം മാർച്ചിലെങ്കിലും കമ്മിഷനിങ് ഉറപ്പാക്കാനാവുന്നവിധം ഷെഡ്യൂൾ ക്രമീകരിക്കാൻ മുഖ്യമന്ത്രി നിർദേശം നൽകി. നിർമാണപ്പുരോഗതി മുഖ്യമന്ത്രി നേരിട്ടു വിലയിരുത്തും.
മൂന്നുമാസത്തിലൊരിക്കൽ
...
more...
റിപ്പോർട്ട് നൽകണമെന്നും അദ്ദേഹം ആവശ്യപ്പെട്ടു. കൊച്ചി മെട്രോ റെയിൽ ലിമിറ്റഡ്, ഡൽഹി മെട്രോ റെയിൽ കോർപറേഷൻ എന്നിവയുടെ ഉദ്യോഗസ്ഥരുടെ സംയുക്തയോഗം ഇ.ശ്രീധരന്റെ സൗകര്യംകൂടി പരിഗണിച്ച് ഉടൻ വിളിക്കും. മെട്രോ റെയിലിന്റെ നിർമാണപ്പുരോഗതി കെഎംആർഎൽ എംഡി ഏലിയാസ് ജോർജ് വിശദീകരിച്ചു.
അഡീഷനൽ ചീഫ്‌ സെക്രട്ടറി നളിനി നെറ്റോ, ഐടി സെക്രട്ടറി എം.ശിവശങ്കർ, മെട്രോ റെയിൽ ഡയറക്ടർ (സിസ്റ്റംസ്) പ്രവീൺ ഗോയൽ എന്നിവർ പങ്കെടുത്തു. മെട്രോ റെയിൽ പദ്ധതിക്കൊപ്പം നടപ്പാക്കാൻ ഉദ്ദേശിക്കുന്ന വാട്ടർ മെട്രോ, ഏകീകൃത നഗരഗതാഗത പദ്ധതി, മെട്രോയുടെ ഭൂമി ഏറ്റെടുക്കൽ നടപടികൾ, കാക്കനാട്ടേക്കുള്ള മെട്രോ രണ്ടാംഘട്ട വിപുലീകരണം, കാക്കനാട് മെട്രോ വില്ലേജ്, തൃപ്പൂണിത്തുറയിലേക്കു മെട്രോ നീട്ടുന്ന കാര്യം എന്നിവയെല്ലാം മുഖ്യമന്ത്രിക്കു മുന്നിൽ വിശദീകരിച്ചു.
Jan 21 2016 (09:23)  Regulation of trains on 23rd Januray (static-editions.manoramaonline.com)
back to top
Major Accidents/DisruptionsSR/Southern  -  

News Entry# 254659   Blog Entry# 1716814     
   Tags   Past Edits
Jan 21 2016 (9:23AM)
Station Tag: Chengannur/CNGR added by AK22660/436575

Jan 21 2016 (9:23AM)
Station Tag: Changanassery/CGY added by AK22660/436575

Jan 21 2016 (9:23AM)
Station Tag: Piravom Road/PVRD added by AK22660/436575

Jan 21 2016 (9:23AM)
Station Tag: Kuruppanthara/KRPP added by AK22660/436575

Jan 21 2016 (9:23AM)
Station Tag: Kanniyakumari/CAPE added by AK22660/436575

Jan 21 2016 (9:23AM)
Station Tag: Kollam Junction (Quilon)/QLN added by AK22660/436575

Jan 21 2016 (9:23AM)
Station Tag: Ernakulam Town (North)/ERN added by AK22660/436575

Jan 21 2016 (9:23AM)
Station Tag: Ernakulam Junction (South)/ERS added by AK22660/436575

Jan 21 2016 (9:23AM)
Station Tag: Alappuzha (Alleppey)/ALLP added by AK22660/436575

Jan 21 2016 (9:23AM)
Station Tag: Kottayam/KTYM added by AK22660/436575

Jan 21 2016 (9:23AM)
Station Tag: Tiruvalla/TRVL added by AK22660/436575

Jan 21 2016 (9:23AM)
Train Tag: Island Express/16526 added by AK22660/436575

Jan 21 2016 (9:23AM)
Train Tag: Kollam Ernakulam Passenger(via Kottayam)/56392 added by AK22660/436575

Jan 21 2016 (9:23AM)
Train Tag: Ernakulam Kayamkulam Passenger(via Kottayam)/56387 added by AK22660/436575

Jan 21 2016 (9:23AM)
Train Tag: Ernakulam-Kollam MEMU (via Kottayam)/66307 added by AK22660/436575

Jan 21 2016 (9:23AM)
Train Tag: Kollam-Ernakulam MEMU (via Kottayam)/66308 added by AK22660/436575

Jan 21 2016 (9:23AM)
Train Tag: Kottayam Ernakulam Passenger/56390 added by AK22660/436575

Jan 21 2016 (9:23AM)
Train Tag: Ernakulam Kottayam Passenger/56385 added by AK22660/436575

Jan 21 2016 (9:23AM)
Train Tag: Chennai Thiruvananthapuram Super Fast Mail/12623 added by AK22660/436575

Jan 21 2016 (9:23AM)
Train Tag: Kanyakumari - Chennai Egmore SF Express/12634 added by AK22660/436575

Posted by: imaravIndian^~  99 news posts
Following trains are cancelled
56385
56390
66308
66307
Diverted
...
more...
and short terminated
12623 via ALLP
56387 and 56392 are cancelled between KTYM ERS
16526 and 16302 will be regulated between KTYM and ERS
12634 Will be rescheduled and will leave CAPE at 17:50

17019 views
Jan 21 2016 (09:24)
imaravIndian^~   582 blog posts   299 correct pred (78% accurate)
Re# 1716814-1            Tags   Past Edits
PFA
Jan 20 2016 (08:37)  Thiruvananthapuram railway division have demanded 5 trains (static-editions.manoramaonline.com)
back to top
New/Special TrainsSR/Southern  -  

News Entry# 254487   Blog Entry# 1715884     
   Tags   Past Edits
This is a new feature showing past edits to this News Post.

Posted by: imaravIndian^~  99 news posts
Prior to the all India railway committee TVC division has demanded a handful of trains and sought extension of some others.
they are
KCVL RMM (via PGT POY)
ERS SA intercity
TVC MAQ Weekly
...
more...
Express
GUV RMM express
and a TVC GHY on wednesdays
other demands include regularisation of KCVL GHY and ERS HWH/SRC
The rake of 16127 could be utilized for GUV RMM express
Railway is also planning to convert the 22657/58 TVC BNC Premium into SF express running tri weekly
other two demands includes making TVC NZM Raj 5 days a week , making LTT KCVL SF a daily, and linking GUV TVC intercity with TPJ TEN intercity

2 posts - Wed Jan 20, 2016 - are hidden. Click to open.

2 posts - Thu Jan 21, 2016 - are hidden. Click to open.

20317 views
Jan 23 2016 (08:38)
imaravIndian^~   582 blog posts   299 correct pred (78% accurate)
Re# 1715884-5            Tags   Past Edits
idk
Dec 10 2015 (21:49)  Memu halted off platform at Ekm Town Station (timesofindia.indiatimes.com)
back to top
Other NewsSR/Southern  -  

News Entry# 250605     
   Tags   Past Edits
Dec 10 2015 (9:49PM)
Station Tag: Ernakulam Town (North)/ERN added by Rail Fanning/718429

Dec 10 2015 (9:49PM)
Train Tag: Palakkad Jn– Ernakulam Jn MEMU/66611 added by Rail Fanning/718429

Posted by: Rail Fanning~  125 news posts
KOCHI: In a bizarre incident, the Palakkad Junction-Ernakulam Junction Memu service (train no 6661) halted on the non-platform line at Ernakulam Town railway station on Wednesday afternoon.
The incident took place due to 'points failure' forcing hundreds of people, particularly the aged, to get down to the track carrying their luggage.
"The incident occurred at 12.10pm due to 'points failure'. Points are sections of track that move, acting as junctions and allowing trains to move from one line to another. When the train left Kalamassery, the point was checked and it
...
more...
was functioning well. However, when the train was about to enter the Ernakulam Town platform no 2, the 'points failure' happened. The message was immediately passed on to the loco pilot and he halted the train on the non-platform line," said a railway source.
This is the second time in seven months 'points failure' took place at the station. "The points can be clogged with debris, the drive mechanism can fail or in hot weather they may expand outside operating tolerances. If it was a long-distance train, we would have waited for repairing the point and then taken the train to the respective platform since the passengers would be carrying luggage. However, to repair the point, it would take at least half-an-hour, means 30-minute delay of train services in the area. The Memu was halted off platform to avoid delay," said another source.
The officer added that the Memu was halted for about six minutes at the station so that passengers can alight without any hurry.
The Memu could not be taken to the platform no 1 since the signal was cleared for another train to Thrissur side.
Page#    Showing 1 to 20 of 44 News Items  next>>

Scroll to Top
Scroll to Bottom


Go to Desktop site