Full Site Search  
Wed Jan 18, 2017 11:27:45 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search

GVN/Godavari (2 PFs)
గోదావరి     गोदावरी

Track: Double Electric-Line

Type of Station: Regular
Number of Platforms: 2
Number of Halting Trains: 25
Number of Originating Trains: 0
Number of Terminating Trains: 0
Havelock Bridge, Rajahmundry
State: Andhra Pradesh
Elevation: 33 m above sea level
Zone: SCR/South Central
Division: Vijayawada
No Recent News for GVN/Godavari
Nearby Stations in the News

Rating: 4.3/5 (7 votes)
cleanliness - excellent (1)
porters/escalators - average (1)
food - n/a (0)
transportation - excellent (1)
lodging - good (1)
railfanning - good (1)
sightseeing - excellent (1)
safety - excellent (1)

Nearby Stations

RJY/Rajahmundry 3 km     KVR/Kovvur 4 km     PSDA/Pasivedala 8 km     CU/Chagallu 11 km     KYM/Kadiyam 13 km     BMGM/Brahmanagudem 15 km     NDD/Nidadavolu Junction 19 km     KSVM/Kesavaram 19 km     DWP/Dwarapudi 23 km     MRPL/Marampalli 26 km    

Station News

Page#    Showing 1 to 1 of 1 News Items  
Aug 05 2015 (14:45)  Approval granted for new line in Godavari arch bridge (www.eenadu.net)
back to top
New Facilities/TechnologySCR/South Central  -  

News Entry# 236585   Blog Entry# 1558215     
   Tags   Past Edits
Aug 05 2015 (2:45PM)
Station Tag: Godavari/GVN added by sumanth/1320283

Posted by: Koilakuntla in IR~  49 news posts
Approval granted for new line in Godavari arch bridge,confirmed by BZA DRM

1501 views
Aug 05 2015 (14:46)
Koilakuntla in IR~   7723 blog posts   7 correct pred (63% accurate)
Re# 1558215-1            Tags   Past Edits
May again change the Godavari statin location or design

1509 views
Aug 05 2015 (14:48)
SRG*^~   34908 blog posts   151134 correct pred (75% accurate)
Re# 1558215-2            Tags   Past Edits
Guess today there was news that they are checking the Pillar strengths there was some tech issue in 11 No pillar & have controlled the speed of the trains.

1547 views
Aug 05 2015 (14:49)
Koilakuntla in IR~   7723 blog posts   7 correct pred (63% accurate)
Re# 1558215-3            Tags   Past Edits
Even that news also mentioned in the same article,as i am poor in translating telugu to english could not write and on the technical issue already news article posted

1594 views
Aug 05 2015 (14:50)
SRG*^~   34908 blog posts   151134 correct pred (75% accurate)
Re# 1558215-4            Tags   Past Edits
Hmm saw the news clipping its 19th number pillar hangers seems to have got a damaged a bit..

1636 views
Aug 05 2015 (14:51)
Koilakuntla in IR~   7723 blog posts   7 correct pred (63% accurate)
Re# 1558215-5            Tags   Past Edits
will be rectified in a day or twice nothing to be worried except some minor delays due to TSR

1624 views
Aug 05 2015 (14:52)
SRG*^~   34908 blog posts   151134 correct pred (75% accurate)
Re# 1558215-6            Tags   Past Edits
This arch bridge was first designed to hold Up & Down tracks...Now have to see how they will develop it.

1625 views
Aug 05 2015 (14:54)
Koilakuntla in IR~   7723 blog posts   7 correct pred (63% accurate)
Re# 1558215-7            Tags   Past Edits
But i heard from murthy that id the track on bridge is doubled it will effect godavari Pf 1,that need to be demolished and new pf to be constructed
heard place is also a constrains

1190 views
Aug 05 2015 (19:04)
180 years of Railways in India~   2111 blog posts
Re# 1558215-8            Tags   Past Edits
Complete demolition is not necessary. Only shortening on the bridge side and extension on the RJY side will be sufficient. During the construction of the bridge, some place was left on the bridge side of PF1 for an approach to the bridge for a second line. If the PF on that end is shortened by a small length, then the new line can curve into PF1 while the current PF2 line can serve as the PF for the existing line on the bridge.
Page#    Showing 1 to 1 of 1 News Items  

Scroll to Top
Scroll to Bottom


Go to Desktop site