Full Site Search  
Tue Jun 27, 2017 12:41:43 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Large Station Board;

HSRA/Hosur (3 PFs)
ஓசூர்     होसुर

Track: Single Diesel-Line

Type of Station: Regular
Number of Platforms: 3
Number of Halting Trains: 26
Number of Originating Trains: 2
Number of Terminating Trains: 2
Railway Station Rd, Hosur
State: Tamil Nadu
Elevation: 896 m above sea level
Zone: SWR/South Western
Division: KSR Bengaluru (Bangalore)
2 Travel Tips
No Recent News for HSRA/Hosur
Nearby Stations in the News

Rating: 2.4/5 (44 votes)
cleanliness - average (6)
porters/escalators - average (6)
food - average (6)
transportation - average (6)
lodging - poor (5)
railfanning - average (5)
sightseeing - average (4)
safety - average (6)

Nearby Stations

AEK/Anekal Road 14 km     KMLM/Kelamangalam 15 km     PRNT/Periya Naga Thunai 24 km     HLE/Heelalige 24 km     CRLM/Karmelaram 35 km     BLRR/Belandur Road 38 km     RYC/Rayakkottai 40 km    

Station News

Page#    Showing 1 to 20 of 29 News Items  next>>
Mar 21 2017 (06:52)  Hooks on track missing (www.thehindu.com)
back to top
Commentary/Human InterestSWR/South Western  -  

News Entry# 296982     
   Tags   Past Edits
Mar 21 2017 (06:52)
Station Tag: Hosur/HSRA added by rdb*^/69261

Posted by: rdb*^  130081 news posts
In a suspected sabotage bid, 15 iron hooks that latched the iron rail to the concrete of the railway track were missing on the Hosur-Bengaluru railway line, about 1.7 km from the Hosur railway station. Along with the hooks, 9 metal liners were also missing from the iron rail.
The missing hooks, also called clips, were spotted by railway track maintainer (gangman) Daniel, around 6.50 a.m. The clips were found missing in succession on one side of the iron rail of track number 161/100-200 running between Vikas Nagar and Annai Nagar, raising suspicion of sabotage.
The
...
more...
gangman managed to remove clips, alternately, from other stretches of the line and put these in the place of missing clips, also in alternate arrangement. After the Bengaluru railway division was alerted, the clips were replaced in time for the Inter-city from Bengaluru and the Nagercoil-Bengaluru Express that cross this section at 7.20 a.m. and 7.30 a.m. respectively. A team consisting of M. Suresh, Senior Security Commissioner, Bengaluru, inspected the line.
Mar 19 2017 (17:06)  12 more railway stations in State to get free Wi-Fi facility soon (www.thehindu.com)
back to top
New Facilities/TechnologySWR/South Western  -  

News Entry# 296824     
   Tags   Past Edits
Mar 19 2017 (17:06)
Station Tag: Bhadravati/BDVT added by NEED MORE TRAINS AT BAY/35650

Mar 19 2017 (17:06)
Station Tag: Birur Junction/RRB added by NEED MORE TRAINS AT BAY/35650

Mar 19 2017 (17:06)
Station Tag: Arsikere Junction/ASK added by NEED MORE TRAINS AT BAY/35650

Mar 19 2017 (17:06)
Station Tag: Harihar/HRR added by NEED MORE TRAINS AT BAY/35650

Mar 19 2017 (17:06)
Station Tag: Haveri/HVR added by NEED MORE TRAINS AT BAY/35650

Mar 19 2017 (17:06)
Station Tag: Tumakuru (Tumkur)/TK added by NEED MORE TRAINS AT BAY/35650

Mar 19 2017 (17:06)
Station Tag: Mandya/MYA added by NEED MORE TRAINS AT BAY/35650

Mar 19 2017 (17:06)
Station Tag: Hosur/HSRA added by NEED MORE TRAINS AT BAY/35650

Mar 19 2017 (17:06)
Station Tag: Hindupur/HUP added by NEED MORE TRAINS AT BAY/35650

Mar 19 2017 (17:06)
Station Tag: Banaswadi/BAND added by NEED MORE TRAINS AT BAY/35650

Mar 19 2017 (17:06)
Station Tag: Toranagallu Junction/TNGL added by NEED MORE TRAINS AT BAY/35650

Mar 19 2017 (17:06)
Station Tag: Londa Junction/LD added by NEED MORE TRAINS AT BAY/35650

Mar 19 2017 (17:06)
Station Tag: Koppal/KBL added by NEED MORE TRAINS AT BAY/35650

Mar 19 2017 (17:06)
Station Tag: Gadag Junction/GDG added by NEED MORE TRAINS AT BAY/35650

Mar 19 2017 (17:06)
Station Tag: Bagalkot/BGK added by NEED MORE TRAINS AT BAY/35650

Mar 19 2017 (17:06)
Station Tag: Davangere/DVG added by NEED MORE TRAINS AT BAY/35650

Mar 19 2017 (17:06)
Station Tag: Shivamogga Town (Shimoga)/SMET added by NEED MORE TRAINS AT BAY/35650

Mar 19 2017 (17:06)
Station Tag: Mangaluru Junction (Mangalore)/MAJN added by NEED MORE TRAINS AT BAY/35650

Mar 19 2017 (17:06)
Station Tag: Hosapete Junction (Hospet)/HPT added by NEED MORE TRAINS AT BAY/35650

Mar 19 2017 (17:06)
Station Tag: Dharwad/DWR added by NEED MORE TRAINS AT BAY/35650

Mar 19 2017 (17:06)
Station Tag: Vasco-da-Gama/VSG added by NEED MORE TRAINS AT BAY/35650

Mar 19 2017 (17:06)
Station Tag: Hassan Junction/HAS added by NEED MORE TRAINS AT BAY/35650

Mar 19 2017 (17:06)
Station Tag: Ballari Junction (Bellary)/BAY added by NEED MORE TRAINS AT BAY/35650

Mar 19 2017 (17:06)
Station Tag: Vijayapura (Bijapur)/BJP added by NEED MORE TRAINS AT BAY/35650

Mar 19 2017 (17:06)
Station Tag: Yelahanka Junction/YNK added by NEED MORE TRAINS AT BAY/35650

Mar 19 2017 (17:06)
Station Tag: Sri Sathya Sai Prashanthi Nilayam/SSPN added by NEED MORE TRAINS AT BAY/35650

Mar 19 2017 (17:06)
Station Tag: Kengeri/KGI added by NEED MORE TRAINS AT BAY/35650

Mar 19 2017 (17:06)
Station Tag: Krishnarajapuram/KJM added by NEED MORE TRAINS AT BAY/35650

Mar 19 2017 (17:06)
Station Tag: Bangarapet Junction/BWT added by NEED MORE TRAINS AT BAY/35650

Mar 19 2017 (17:06)
Station Tag: Bengaluru Cantt. (Bangalore)/BNC added by NEED MORE TRAINS AT BAY/35650

Posted by: NEED MORE TRAINS AT BAY~  130 news posts
click here
Seven stations, including Bengaluru, Mysuru and Mangaluru, have the facility
Very soon, 12 more railway stations in the State would get high-speed free Wi-Fi facility for passengers. Seven major stations in the State have the facility now.
RailTel, a public sector undertaking of the Railway Ministry, is executing the project announced in the 2016–17 Railway Budget. The Railway Board had entrusted RailTel
...
more...
with the task of installation of Wi-Fi facility at 400 stations across the country in collaboration with Google, under the Digital India initiative of the Union government.
Presently, free Wi-Fi is available at KRS Bengaluru City, Yeshwantpur, Mysuru, Hubballi, Mangaluru Central, and Kalaburagi stations through RailTel. Belagavi station has got the facility under the MPLAD scheme. With each access point covering up to 40 metres, all platforms, passenger concourse and entrance of the stations are covered, according to South Western Railway’s chief public relations officer E. Vijaya.
In 2017–18, the Railways would provide the facility at Vijayapura, Ballari, Dharwad, Hosapete, and Vasco da Gama (Goa) stations in Hubballi division; Bengaluru Cantonment (to be commissioned shortly), Bangarpet, Kengeri, Krishnarajapuram, and Sri Satya Sai Prasanti Nilayam stations in Bengaluru division; Davangere and Shivamogga Town in Mysuru division, and Mangaluru Junction station in Palakkad division of Southern Railway.
Seventeen more stations would be covered in the next financial year. They are Bagalkot, Gadag, Koppal, Londa, and Toranagallu in Hubballi division; Banaswadi, Hindupur, Hosur, Mandya, Tumakuru, and Yelahanka in Bengaluru division, and Arsikere, Birur, Bhadravathi, Harihar, Haveri and Hassan in Mysuru division.
One can get Internet access with speeds up to 1 Mbps for upload and 3 Mbps for download for the first 30 minutes. Subsequently, the speed reduces to 64 Kbps, but, one could access railway-related sites through WiFi for information such as PNR, and train inquiry, throughout the day.
Mar 10 2017 (13:58)  Electric trains to start from Bengaluru to Mysuru in 3 months (www.deccanherald.com)
back to top
New Facilities/TechnologySWR/South Western  -  

News Entry# 295922   Blog Entry# 2192747     
   Tags   Past Edits
This is a new feature showing past edits to this News Post.

Posted by: karbang~  170 news posts
​Electric trains to start from Bengaluru to Mysuru in 3 months
Trains between Chennai and Mysuru via Bengaluru will go green from June with electrification work between Mandya and Mysuru stations set to be completed in three months.
Bengaluru Divisional Railway Manager Sanjiv Agarwal told DH that completion of electrification work will also cut travel time of Shatabdi Express by around 10 to 15 minutes. The present travel time by Shatabdi Express from Chennai to Mysuru is seven hours.
“At
...
more...
present, the train runs on electric traction between Chennai and Bengaluru. The electric locomotive is detached in Bengaluru to be replaced by a diesel locomotive. The electrification of the entire stretch will eliminate this process and save time,” he added.
However, long distance trains running to Mysuru from other places will continue with the diesel locomotive. “Changing locomotives at Bengaluru station is time consuming. Besides, we do not have spare electric locomotives to move other trains,” he said.
The senior official, however, said electric locomotives will dominate the future of railways. “It will start with trains originating in Bengaluru and Chennai stations to destinations with electrified tracks. Electrification has been sanctioned in all the directions from Bengaluru, including Tumakuru and Hosur sections. Work on Dharmavaram section is already over,” he added.
MEMU to Mandya
Agarwal said the mainline electric multiple unit (MEMU) train between Bengaluru and Ramanagaram will be extended to Mandya. He, however, said talks were on and the date is yet to be finalised.
SWR officials said electrification work till Mandya will be completed within a month. “The remaining work for the track from Yeliyur to Mysuru (about 40 km) will be done by June,” an official added.
Low patronage
The Shatabdi fare was reduced from Rs 438 to Rs 300 in December. Even on other trains, the 3-AC fare was brought on par with the AC chair car fare. “Despite these measures, travellers who prefer comfort are not taking trains, though they are faster and more comfortable compared to road transport,” SWR Senior Divisional Commercial Manager Sridhar Murthy added.

7 posts - Fri Mar 10, 2017 - are hidden. Click to open.

2256 views
Mar 12 2017 (22:55)
GZB WAP7 Namma Rajdhani*^~   9715 blog posts   497 correct pred (74% accurate)
Re# 2192747-8            Tags   Past Edits
Hereafter DLS also will accommodate E loco and ELS will accommodate D loco .
Now Gonda DLS has been allocated with a WAG 7. So even KJM may house E loco once OHE works are completed in KJM shed . As of now Erode and Royapuram are taking care of SWR need, they will be continuing the same.

2157 views
Mar 12 2017 (23:03)
JBP ET OHE OMG 😲 WAITING FOR SVDK TRIP 😍😎~   13111 blog posts   22 correct pred (42% accurate)
Re# 2192747-9            Tags   Past Edits
Kjm & gooty both could handle eloco in future
Jan 27 2017 (09:11)  Bangalore Railway Division comes out with a wishlist for Centre (www.newindianexpress.com)
back to top
Rail BudgetSWR/South Western  -  

News Entry# 292362   Blog Entry# 2141873     
   Tags   Past Edits
Jan 27 2017 (09:11)
Station Tag: Hubballi Junction (Hubli)/UBL added by karbang/50057

Jan 27 2017 (09:11)
Station Tag: Mysuru Junction (Mysore)/MYS added by karbang/50057

Jan 27 2017 (09:11)
Station Tag: KSR Bengaluru City Junction (Bangalore)/SBC added by karbang/50057

Jan 27 2017 (09:11)
Station Tag: Hosur/HSRA added by karbang/50057

Jan 27 2017 (09:11)
Station Tag: Banaswadi/BAND added by karbang/50057

Posted by: karbang~  170 news posts
BENGALURU: With less than a week to go for the first Railway budget in 92 years to be merged with the General Budget, the Bangalore Railway Division has sent across its wishlist to the Centre for inclusion in the Pink Book (the official register of the Indian Railways).
Chief among the demands are a train connecting Hubballi with Mysuru via Bengaluru, three doubling projects and increased allocation for passenger amenities.
Speaking to Express on the doubling projects, Ashok Gupta, Chief Administrative Officer, Constructions, South Western Railway, said, “The doubling of the
...
more...
existing line between Yeshwantpur and Baiyappanahalli via Hebbal will help us run more trains along this busy stretch. The 22-km line will require funding of Rs 170 crore.”
Another doubling line between Baiyappanahalli and Hosur that will cost Rs 375 crore has also been requested.
“This will be a 48-km line and will immensely help passengers commuting between the two cities regularly,” Gupta added. A 41-km second line between Penukonda and Dharmavaram via Nagasundaram that will cost Rs 294 crore has also been sought, he said.
Sanjiv Agarwal, Divisional Railway Manager, Bengaluru Railway Division, said, “To decongest the packed Chamundi Express that leaves from Krantiveera Sangolli Rayanna (KSR) station in the evenings, we have requested a day train that would connect Hubballi to Mysuru via Bengaluru. It is expected to be sanctioned.”
When asked if any more new trains were sought, the DRM said, “It is not possible to run more trains as we have already reached a saturation point. Hence, we have not requested for more.”
The Division has also sought funding to upgrade Platform 5 and 6 of the Banaswadi station and carry on yard-related work. “The platforms are very small and this is posing a problem to trains coming from Kolar. We need Rs 11 crore for it but even if Rs 3 toRs 4 crore is released, we can begin work on it,” he said.
Agarwal also said that Bengaluru was hoping to get more funding to improve passenger amenities across its Division. “We received very less for it in the previous budget and could not carry out many improvements,” he added.
The South Western Railway Zone (Bengaluru, Hubballi and Mysuru Railway Divisions) as a whole received only Rs 33 crore for passenger amenities in the 2016-17 Railway Budget whereas, it had received nearly Rs 90 crore in the 2015-16 budget, pointed out a top railway official. “We are hoping for Rs 100 crore for the SWR Zone for passenger amenities alone so that Bengaluru gets at least Rs 30 to Rs 40 crore allocated out of it,” he said.
Asked about what tops the amenity, the official said KSR, Cantonment, Yeshwantpur and Krishnajapuram stations require digital passenger information boards.

15 posts - Fri Jan 27, 2017 - are hidden. Click to open.

3848 views
Jan 28 2017 (12:08)
Koushik Patel~   1106 blog posts   119 correct pred (86% accurate)
Re# 2141873-16            Tags   Past Edits
SWR has really gone wrong in setting the TT of New UBL - SBC- MYS Express, It wont help UBL people in any sense, It will rather act as a new FAST PASSENGER...... Instead they could have gone with following TT : as BGM - SBC - MYS SF Express
BGM : 18:30
UBL : 21:30/45
SBC : 06:10/25
MYS
...
more...
: 09:30
I know, the TT between SBC and MYS would clash between SBC and MYS, but would give better patronage to the train between BGM and SBC when compared to a day train between this route with just 47 AVg..... where in a normal train has atleast 53 kmph avg....
NO proper plans are laid by SWR in BGM - SBC section to make it comfortable....
* Adding stops to 12725 and 16590, has make them miserable to travel.....
* A new SF is required to make it comfortable to travel.

3461 views
Jan 28 2017 (12:14)
Koushik Patel~   1106 blog posts   119 correct pred (86% accurate)
Re# 2141873-17            Tags   Past Edits
UBL - YPR JS - I feel better opt HPT - YPR via GTL
VSG - GHY - Will never be a reality due to Braganza
VSG - PNBE - as same as above
UBL - NDLS - As of now not required, better to run UBL - BSB/ Kanpur / TATA
Mangalore
...
more...
- Bidar via ASK, UBL, BJP would sound great.
Amaravati to VSKP, Zone issue and Secondary Maintenance issue. as the train might loose time, if extended to this section....
LTT - MAS , Please no circle routes now, Better have BAY - LTT ( via GDG, BJP, SUR, PA) and a weekly from UBL to MAS via BAY
ur judgements are welcome.....
Dec 21 2016 (08:22)  Government may partially meet commuter rail demand (www.deccanherald.com)
back to top
New Facilities/TechnologySWR/South Western  -  

News Entry# 289230   Blog Entry# 2098189     
   Tags   Past Edits
Dec 21 2016 (8:22AM)
Station Tag: Nelamangala/NMGA added by karbang/50057

Dec 21 2016 (8:22AM)
Station Tag: Chik Ballapur/CBP added by karbang/50057

Dec 21 2016 (8:22AM)
Station Tag: Hosur/HSRA added by karbang/50057

Dec 21 2016 (8:22AM)
Station Tag: Bangarapet Junction/BWT added by karbang/50057

Dec 21 2016 (8:22AM)
Station Tag: Tumakuru (Tumkur)/TK added by karbang/50057

Dec 21 2016 (8:22AM)
Station Tag: Dodballapur/DBU added by karbang/50057

Dec 21 2016 (8:22AM)
Station Tag: Lotte Golla Halli/LOGH added by karbang/50057

Dec 21 2016 (8:22AM)
Station Tag: Hebbal/HEB added by karbang/50057

Dec 21 2016 (8:22AM)
Station Tag: Ramanagaram/RMGM added by karbang/50057

Dec 21 2016 (8:22AM)
Station Tag: Whitefield/WFD added by karbang/50057

Dec 21 2016 (8:22AM)
Station Tag: KSR Bengaluru City Junction (Bangalore)/SBC added by karbang/50057

Posted by: karbang~  170 news posts
Under public pressure to start a suburban train service in Bengaluru, the South Western Railway (SWR) is likely to introduce new trains on two existing lines that connect the city centre with the suburbs.
More trains could run from Bengaluru City to Bangarpet (via Whitefield) and Ramanagaram, given the feasibility to operate the services on the two lines. The two lines have been listed under Phase A, Stage 1, of the Bengaluru suburban railway project, whose detailed project report (DPR) was prepared by RITES, a Central government-owned engineering consultancy.
“After several rounds of
...
more...
discussion with the railways, it has been decided to introduce new trains on these lines on priority. This can be done faster using the existing infrastructure.
It’s also possible to add more trains on the Yeshwantpur-Tumakuru railway line,” a state government official, who oversees the city’s suburban project, told DH.
Phase A, Stage 1, entails introduction of seven new services or replacement of 15 existing conventional trains with Mainline Electric Multiple Unit (MEMU) trains. This will cost Rs 360 crore and needs the approval of the state Cabinet, he noted.
“Once the state government agrees to fund the project, it will take six to eight months to procure a rake (a group of coaches) and complete the signalling work. The electric-powered trains have engines and can move in both directions without having to take a turn like conventional trains,” the official said.
An extensive suburban train project for Bengaluru has been proposed to be spread over three stages and estimated to cost Rs 9,000 crore. It involves commuter train services from Bengaluru City to Hosur (41 km), Doddaballapur (37 km), Ramanagaram (46 km), Tumakuru (64 km), Chikkaballapur (57 km), Bangarpet (84 km) and Nelamangala (27 km).
According to K N Krishna Prasad of Karnataka Railway Vedike, all lines except the Lottegollahalli-Hosur stretch (via Hebbal and Banaswadi) are doubled and electrified, which makes it easy to introduce the suburban train services.
Urban mobility analyst Sanjeev Dyamannavar, however, said more commuter trains on the two routes would be of little help unless the railways prioritised them over outbound services. “Besides conventional passenger trains, the city has three MEMU and DEMU trains each. It would be difficult for people to switch to commuter services unless the SWR increases their frequency,” he added.

9 posts - Wed Dec 21, 2016 - are hidden. Click to open.

3 posts - Thu Dec 22, 2016 - are hidden. Click to open.

3 posts - Fri Dec 23, 2016 - are hidden. Click to open.

5029 views
Dec 24 2016 (13:17)
Prometh Suresh~   366 blog posts   428 correct pred (57% accurate)
Re# 2098189-16            Tags   Past Edits
welcome
Page#    Showing 1 to 20 of 29 News Items  next>>

Scroll to Top
Scroll to Bottom


Go to Desktop site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.