Full Site Search  
Sat Apr 29, 2017 09:11:26 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Large Station Board;

KTV/Kottavalasa Junction (5 PFs)
కొత్తవలస జంక్షన్     कोत्तवलसा जंक्शन

Track: Double Electric-Line

Type of Station: Junction
Number of Platforms: 5
Number of Halting Trains: 36
Number of Originating Trains: 0
Number of Terminating Trains: 0
Kottavalasa, Vizianagaram District
State: Andhra Pradesh
Elevation: 56 m above sea level
Zone: ECoR/East Coast
Division: Waltair
No Recent News for KTV/Kottavalasa Junction
Nearby Stations in the News

Rating: 3.9/5 (8 votes)
cleanliness - excellent (1)
porters/escalators - average (1)
food - poor (1)
transportation - excellent (1)
lodging - average (1)
railfanning - excellent (1)
sightseeing - excellent (1)
safety - excellent (1)

Nearby Stations

KPL/Kantakapalle 8 km     PDT/Pendurti 9 km     MVW/Mallividu 9 km     LVK/Lakkavarapukota 15 km     ALM/Alamanda 17 km     SCMN/Simhachalam North 17 km     SCM/Simhachalam 18 km     GPT/Gopalapatnam 19 km     MIPM/Marripalem 22 km     KUK/Korukonda 24 km    

Station News

Page#    Showing 1 to 10 of 10 News Items  
Apr 27 2017 (02:39)  Science Express Tour schedule (www.sciencexpress.in)
back to top
New/Special Trains

News Entry# 300881     
   Tags   Past Edits
This is a new feature showing past edits to this News Post.

Posted by: Chicago Sudarshan*^~  389 news posts
Tour Schedule [17 February - 8 September 2017]
Tour Schedule | Route Map | Tour phase I-VIII
No. Station Exhibition Dates No. Station Exhibition Dates
1. Delhi Safdarjung
(Flag off) 17 Feb 2017 35. Kottavalasa 20 - 23 May 2017
2. Delhi
...
more...
Cantt 18 - 19 Feb 2017 36. Gudivada 24 - 26 May 2017
3. Hisar 20 - 23 Feb 2017 37.. Mirylaguda 27 - 30 May 2017
4. Dhuri 24 - 26 Feb 2017 38. Gulberga 31 May-2 Jun 2017
5. Taran Taran 27 - 28 Feb 2017 39. Kalluru 3 - 5 Jun 2017
6. Sri Mata Vaishno Devi Katra 1 - 2 Mar 2017 40. Whitefield 6 - 8 Jun 2017
7. Udhampur 3 - 4 Mar 2017 41. Kengeri 9 - 11 Jun 2017
8. Nangal Dam 6 - 7 Mar 2017 42. Koduru 12 - 14 Jun 2017
9. Sirhind 8 - 10 Mar 2017 43. Puducherry 15 - 16 Jun 2017
10. Chandigarh 12 & 14 Mar 2017 44. Attur 17 - 19 Jun 2017
11. Rampur 15 - 17 Mar 2017 45. Karur 20 - 22 Jun 2017
12. Kasganj City 18 - 20 Mar 2017 46. Kodaikanal Road 24 Jun 2017
13. Khalilabad 22 - 25 Mar 2017 47. Virudhunagar 25 - 27 Jun 2017
14. Mau 26 - 29 Mar 2017 48. Arumuganeri 28 - 30 Jun 2017
15. Gaya 30 - 31 Mar 2017 49. Kayankulam 1 - 4 Jul 2017
16. Patna 1 - 2 Apr 2017 50. Guruvayur 5 - 7 Jul 2017
17. Kiul 3 - 4 Apr 2017 51. Kannur 8 - 10 Jul 2017
18. Sitamarhi 5 Apr 2017 52. Vasco Da Gama 11 - 13 Jul 2017
19. Samastipur 6 Apr 2017 53. Ratnagiri 14 - 17 Jul 2017
20. Salmari 7 - 8 Apr 2017 54. Mumbai CST 19 - 22 Jul 2017
21. Fakiragram 9 - 10 Apr 2017 55. Nasik Road 24 - 26 Jul 2017
22. Lumding 11 - 12 Apr 2017 56. Murtajapur 27 - 29 Jul 2017
23. Agartala 13 - 14 Apr 2017 57. Nagpur 30 Jul-02 Aug 2017
24. Badarpur 15 - 17 Apr 2017 58. Amla 3 - 6 Aug 2017
25. North Lakhimpur 19 - 21 Apr 2017 59. Habibganj 7 - 9 Aug 2017
26. Rangpara North 22 - 24 Apr 2017 60. Bina 10 - 12 Aug 2017
27. Bagdogra 25 - 26 Apr 2017 61. Khajuraho 13 - 14 Aug 2017
28. Dhanbad 27 - 30 Apr 2017 62. Marwar 17 - 18 Aug 2017
29. Barrackpore 1 - 2 May 2017 63. Balotra 19 - 21 Aug 2017
30. Kalyani 3 - 5 May 2017 64. Deesa 22 - 24 Aug 2017
31. Chandil 6 - 8 May 2017 65. Bhuj 25 - 27 Aug 2017
32. Bhadrak 9, 11 & 12 May 2017 66. Bhaktinagar 28 - 31 Aug 2017
33. Puri 13 - 16 May 2017 67. Gondal 1 - 4 Sep 2017
34. Chatarpur 17 - 19 May 2017 68. Gandhinagar Capital 5 - 8 Sep 2017
Jun 28 2016 (20:33)  Trains on KK line hit as rain lashes Agency (timesofindia.indiatimes.com)
back to top
Commentary/Human InterestECoR/East Coast  -  

News Entry# 272244     
   Tags   Past Edits
Jun 28 2016 (8:33PM)
Station Tag: Kirandul/KRDL added by Ashish Sharma/42443

Jun 28 2016 (8:33PM)
Station Tag: Kottavalasa Junction/KTV added by Ashish Sharma/42443

Posted by: Ashish Sharma~  86 news posts
Visakhapatnam: Many parts of the district received heavy rain on Monday under the influence of a low pressure that formed over Bay of Bengal on Sunday.
Train services on the Kottavalasa-Kirandul (KK) railway line were also interrupted as boulders fell on the track due to rains in Visakha Agency. Officials from the Waltair division of the East Coast Railway rushed to the spot and restored the services. Train services on this sector were disrupted for nearly two hours.
"Boulders falling on the KK line is a common event for us during the monsoon.
...
more...
We always keep the requisite emergency equipment ready so that the situation is brought under control at the earliest and train services are restored," said a senior railway official.
Meanwhile, weathermen at the Cyclone Warning Centre (CWC), Visakhapatnam, said the city received 14 mm of rainfall and the airport received 16.4 mm of rainfall from 8.30 am to 5.30 pm. They further said the low pressure area lying over west central and adjoining north-west Bay of Bengal off south Odisha coast and north coastal Andhra Pradesh did not turn into a well-marked low pressure till Monday. Many parts of coastal AP will receive moderate to heavy rains on Tuesday, the CWC officials said.
Apr 19 2016 (09:04)  Run MEMU services between Tuni, Vizianagaram (www.thehindu.com)
back to top
Other NewsSCR/South Central  -  

News Entry# 265092   Blog Entry# 1810204     
   Tags   Past Edits
Apr 19 2016 (9:10AM)
Station Tag: Srikakulam Road/CHE added by WAP7/1472033

Apr 19 2016 (9:10AM)
Station Tag: Chipurupalle/CPP added by WAP7/1472033

Apr 19 2016 (9:10AM)
Station Tag: Vizianagaram Junction/VZM added by WAP7/1472033

Apr 19 2016 (9:10AM)
Station Tag: Kottavalasa Junction/KTV added by WAP7/1472033

Apr 19 2016 (9:10AM)
Station Tag: Pendurti/PDT added by WAP7/1472033

Apr 19 2016 (9:10AM)
Station Tag: Simhachalam/SCM added by WAP7/1472033

Apr 19 2016 (9:10AM)
Station Tag: Visakhapatnam Junction/VSKP added by WAP7/1472033

Apr 19 2016 (9:10AM)
Station Tag: Duvvada/DVD added by WAP7/1472033

Apr 19 2016 (9:10AM)
Station Tag: Anakapalle/AKP added by WAP7/1472033

Apr 19 2016 (9:10AM)
Station Tag: Elamanchili/YLM added by WAP7/1472033

Apr 19 2016 (9:10AM)
Station Tag: Narsipatnam Road/NRP added by WAP7/1472033

Apr 19 2016 (9:10AM)
Station Tag: Tuni/TUNI added by WAP7/1472033

Apr 19 2016 (9:10AM)
Station Tag: Annavaram/ANV added by WAP7/1472033

Apr 19 2016 (9:04AM)
Station Tag: Vizianagaram Junction/VZM added by WAP7/1472033

Apr 19 2016 (9:04AM)
Station Tag: Visakhapatnam Junction/VSKP added by WAP7/1472033

Apr 19 2016 (9:04AM)
Station Tag: Anakapalle/AKP added by WAP7/1472033

Apr 19 2016 (9:04AM)
Station Tag: Tuni/TUNI added by WAP7/1472033

Apr 19 2016 (9:04AM)
Train Tag: Visakhapatnam - Vizianagaram DMU/78532 added by WAP7/1472033

Apr 19 2016 (9:04AM)
Train Tag: Vizianagaram - Visakhapatnam DEMU/78531 added by WAP7/1472033

Apr 19 2016 (9:04AM)
Train Tag: Visakhapatnam-Kakinada Port Passenger/57256 added by WAP7/1472033

Apr 19 2016 (9:04AM)
Train Tag: Kakinada Port-Visakhapatnam Passenger/57255 added by WAP7/1472033

Apr 19 2016 (9:04AM)
Train Tag: Rayagada-Vijayawada Passenger/57272 added by WAP7/1472033

Apr 19 2016 (9:04AM)
Train Tag: Vijayawada-Rayagada Passenger/57271 added by WAP7/1472033

Posted by: WAP7  11 news posts
Naresh, a government employee living in Anakapalle, and Achari, a teacher living in Vizianagaram, who commute to the city daily for work, find the lack of local trains a curse for commuters.
“Though there are trains from Anakapalle to Visakhapatnam, they do not match the actual demand. I have to board either 57271 BZA- Rayagada Passenger or 57255 Kakinada - Vizag EMU, which are already packed to capacity with hardly any space to get in,” says Naresh.
Mr. Achari travels from Vizianagaram to Visakhapatnam every day. He boards 78531 Vizianagaram-Visakhapatnam DEMU, which is
...
more...
packed to capacity with hardly any space to stand comfortably leave alone sitting in the train.
Both Naresh and Achari feel that there should be MEMU s (Mainline Electrical Multiple Unit) between Tuni/Anakapalle to Vizianagaram via Visakhapatnam after every 1 hour and a few services can be extended up to Annavaram one side (as it would meet the requirement of pilgrims travelling to Sri Satyanarayana Swamy temple) and Srikakulam on other side (as it would be useful to those going to Arasavalli and Srikurmam temples).
The introduction of the local trains would help in reducing the load on the National Highway and minimising road accidents. This is not all, the middle class and the poor will be saved the hassle of paying three or four times the fare for travel in buses.

10788 views
Apr 19 2016 (11:53)
AAA   353 blog posts
Re# 1810204-1            Tags   Past Edits
Agreed .. MEMU's are badly reqd
Nov 18 2015 (22:46)  కొత్తవలస- కోరాపుట్ డబ్లింగ్ పనులకు ఓకే (www.sakshi.com)
back to top
IR AffairsECoR/East Coast  -  

News Entry# 248218     
   Tags   Past Edits
Nov 18 2015 (10:46PM)
Station Tag: Koraput Junction/KRPU added by Guntakallu Division*^/624989

Nov 18 2015 (10:46PM)
Station Tag: Kottavalasa Junction/KTV added by Guntakallu Division*^/624989

Posted by: Chicago Sudarshan*^~  389 news posts
న్యూఢిల్లీః విజయనగరం జిల్లా కొత్తవలస - ఒడిశాలోని కోరాపుట్ మధ్య రైల్వే లైన్ డబ్లింగ్ పనులకు కేంద్రం గ్రీన్‌ సిగ్నల్ ఇచ్చింది. ప్రధానమంత్రి నరేంద్రమోదీ అధ్యక్షతన బుధవారం జరిగిన కేంద్ర ఆర్థిక వ్యవహారాల కేబినెట్ కమిటీ కొత్తవలస-కోరాపుట్ రైల్వే లైన్ డబ్లింగ్ పనుల ప్రతిపాదనలకు ఆమోదం తెలిపింది.
189.278 కి.మీ. పొడవైన ఈ మార్గంలో రూ. 2977.64 కోట్ల అంచనా వ్యయంతో డబ్లింగ్ పనులు చేపడతారు. ఈ డబ్లింగ్ పనుల వల్ల ఆయా ప్రాంతాల మధ్య సరుకు రవాణా సులభతరం కావడమే కాకుండా రైల్వే ఆదాయం పెరుగుతుంది. ఈ పనులు వచ్చే ఏడేళ్లలో పూర్తవుతాయని అంచనావేసింది. ఒడిశాలోని కోరాపుట్ జిల్లా, ఆంధ్రప్రదేశ్‌లోని విజయనగరం, విశాఖపట్నం జిల్లాలకు ఈ ప్రాజెక్టు ఉపయోగపడనుంది. ఈ జిల్లాల మధ్య వివిధ రకాల ఖనిజాలు, ముడిసరుకు, ఇతర వస్తు రవాణా అవసరాలు పెరుగుతున్నందున కేంద్రం ఈ నిర్ణయం తీసుకుంది.
Apr 08 2015 (12:54)  Move to de-link KK, KR lines decried - The Hindu (www.thehindu.com)
back to top
Commentary/Human InterestECoR/East Coast  -  

News Entry# 219828     
   Tags   Past Edits
Apr 08 2015 (12:54PM)
Station Tag: Kottavalasa Junction/KTV added by 36225**/36225

Apr 08 2015 (12:54PM)
Station Tag: Vijayawada Junction/BZA added by 36225**/36225

Apr 08 2015 (12:54PM)
Station Tag: Visakhapatnam Junction/VSKP added by 36225**/36225

Posted by: KSG*^~  3473 news posts
Move to de-link KK, KR lines decried SPECIAL CORRESPONDENT COMMENT   ·  
URV president S. S. Shiva Sankar addressing a press conference in Visakhapatnam on Tuesday
The proposal to de-link the KK line and KR line from Waltair Division, while creating the new railway zone, and apportioning them to East Coast Railway would be opposed tooth and nail, said Uttarandhra Rakshana Vedika (URV) president S.S. Shiva Sankar.
No
...
more...
existing railway Division was bifurcated at the time of creating new zones in the past. Waltair Division, which is among the top five revenue earning divisions in the country, if bifurcated, would make the new zone financially unviable. The MPs from Andhra Pradesh should exert pressure on the Railway Ministry to prevent further split of Waltair Division, he told a media conference here on Tuesday.
The jurisdiction of Waltair Division extends over 1,105 route km. covering AP, Odisha and Chhattisgarh States. The four main arteries of the Division are: Duvvada-Visakhapatnam-Palasa – 213 RKM, Vizianagaram-Singapur Road – 137 RKM, Kottavalasa-Kirandul (KK Line) 446 RKM, Koraput-Rayagada – 164 RKM, Kottavalasa-Simahachalam – 22 RKM, Bobbili-Salur 18 RKM, miscellaneous Goods routes – 37 km. and Naupada – Gunupur – 91 km. (total 1105 km).
Mr. Shiva Sankar said that Waltair Division poses a great heritage being an old Division, which has over 700 acres of railway land, various railway establishments like the largest Diesel Loco Shed in Indian Railways and an Electric Loco Shed. KK line and KR lines are the major earning lines in the Division as they carry freight for various industries.
The KK line, which comes under a single section, would pose operational problems, if bifurcated. The control of two different zonal railways on a single section would also result in administrative problems, he added.
Replying to a query, he said that a memorandum was being sent to the Railway Minister not to allow bifurcation of Waltair Division.
Feb 07 2015 (11:22)  New Gunupur-Vizag train to be flagged off on February 9 (timesofindia.indiatimes.com)
back to top
Rail BudgetECoR/East Coast  -  

News Entry# 211691   Blog Entry# 1362728     
   Tags   Past Edits
Feb 07 2015 (11:22AM)
Station Tag: Naupada Junction/NWP added by Godavari Express/1052539

Feb 07 2015 (11:22AM)
Station Tag: Kotabommali/KBM added by Godavari Express/1052539

Feb 07 2015 (11:22AM)
Station Tag: Tilaru/TIU added by Godavari Express/1052539

Feb 07 2015 (11:22AM)
Station Tag: Urlam/ULM added by Godavari Express/1052539

Feb 07 2015 (11:22AM)
Station Tag: Srikakulam Road/CHE added by Godavari Express/1052539

Feb 07 2015 (11:22AM)
Station Tag: Ponduru/PDU added by Godavari Express/1052539

Feb 07 2015 (11:22AM)
Station Tag: Chipurupalle/CPP added by Godavari Express/1052539

Feb 07 2015 (11:22AM)
Station Tag: Garividi/GVI added by Godavari Express/1052539

Feb 07 2015 (11:22AM)
Station Tag: Vizianagaram Junction/VZM added by Godavari Express/1052539

Feb 07 2015 (11:22AM)
Station Tag: Kottavalasa Junction/KTV added by Godavari Express/1052539

Feb 07 2015 (11:22AM)
Station Tag: Pendurti/PDT added by Godavari Express/1052539

Feb 07 2015 (11:22AM)
Station Tag: Simhachalam/SCM added by Godavari Express/1052539

Feb 07 2015 (11:22AM)
Station Tag: Gunupur/GNPR added by Godavari Express/1052539

Feb 07 2015 (11:22AM)
Station Tag: Visakhapatnam Junction/VSKP added by Godavari Express/1052539

Posted by: Aditya~  52 news posts
VISAKHAPATNAM: As announced in the 2014 railway budget, the Railways will be kicking off daily trains 58505/ 58506 Gunupur-Visakhapatnam-Gunupur passenger with the inaugural run of 58505 Gunupur-Visakhapatnam passenger at 6 pm on February 9.
Union railway minister Suresh Prabhakar Prabhu will flag off the train by remote from New Delhi. On its February 9 inaugural run, the train will run as a passenger special with stoppages at all stations Gunupur and Visakhapatnam. But with effect from February 10, the pair of trains will run as per the schedule published in the time table that has been made public. Train 58506 Visakhapatnam-Gunupur passenger will leave Vizag at 7 am, arriving at Naupada Junction at 10.20 am and departing at 10.50 am to reach
...
more...
Gunupur at 1.55 pm the same day. In the return journey, train 58505 Gunupur-Visakhapatnam passenger will leave Gunupur at 2.25 pm only to arrive at Naupada at 5 pm and depart at 5.25 pm to reach Vizag at 9.40 pm the same day.
These trains will stop at Simhachalam, Pendurthy, Kothavalasa, Vizianagaram, Garividi, Cheepurupalle, Ponduru, Srikakulam Road, Urlam, Tilaru, Kotabommali, Naupada Junction and stations between Naupada Junction and Gunupur.

7722 views
Feb 07 2015 (11:39)
Aditya~   2030 blog posts   170 correct pred (68% accurate)
Re# 1362728-1            Tags   Past Edits
Gunupur-Vizag Passenger from Feb 9
Indian Express link
click here
May 15 2014 (08:47)  रेल पुल भी रहे नक्सलियों के निशाने पर, ईस्ट कोस्ट रेल जोन भुवनेश्वर में रेलवे की कमाई के मामले में 451 किलोमीटर लंबी कोत्तावालसा-किरंदुल रेल लाइन पहले नंबर पर (naidunia.jagran.com)
back to top
Commentary/Human InterestECoR/East Coast  -  

News Entry# 176962     
   Tags   Past Edits
May 15 2014 (8:47AM)
Station Tag: Jagdalpur/JDB added by Pp**/36064

May 15 2014 (8:47AM)
Station Tag: Kirandul/KRDL added by Pp**/36064

May 15 2014 (8:47AM)
Station Tag: Kottavalasa Junction/KTV added by Pp**/36064

Posted by: Pp*^~  5969 news posts
किरंदुल-कोत्तावालसा रेललाइन पर बीते नौ सालों में नक्सली विभिन्न वारदातों को अंजाम देकर रेलवे और एनएमडीसी को लगभग तीन सौ करोड़ रुपए का नुकसान पहुंचा चुके हैं। यह नुकसान रेल संपति की हानि और रेल पटरी उखाड़ने व रेल दुर्घटनाओं की वजह से रेलमार्ग बाधित रहने से लौह अयस्क की ढुलाई बंद रहने के कारण हुआ है। वाल्टेयर रेल मंडल मुख्यालय से मिले आंकड़ों के अनुसार नक्सलियों की वजह से रेल दुर्घटनाओं के मामले में दक्षिण बस्तर स्थित किरंदुल रेल सेक्शन बीते एक दशक में देश के सर्वाधिक नक्सल प्रभावित क्षेत्रों में पहले स्थान पर रहा है। ईस्ट कोस्ट रेल जोन भुवनेश्वर में रेलवे की कमाई के मामले में 451 किलोमीटर लंबी कोत्तावालसा-किरंदुल रेल लाइन पहले नंबर पर है। साल भर में रेलवे करीब 26 मिलियन टन लौह अयस्क की ढुलाई इसी मार्ग से कर एक हजार करोड़ रुपए से अधिक की कमाई करता है। यही कारण है कि नक्सली अथवा...
more...
अन्य किसी कारण से यदि रेलमार्ग बाधित होता है तो रेलवे को सबसे अधिक आर्थिक नुकसान उठाना पड़ता है। लौह अयस्क परिवहन ठप होने से रेलवे के साथ ही एनएमडीसी को भी करारी चपत लगती है। जिस तरह से नक्सली एक के बाद एक घटनाएं करते जा रहे हैं उससे आर्थिक नाकेबंदी की स्थिति निर्मित हो रही है। बस्तर में संभागीय मुख्यालय जगदलपुर से 42 किलोमीटर दूर सिलकझा़ेडी स्टेशन से नक्सल प्रभाव शुरू हो जाता है जो किरंदुल में जाकर समाप्त होता है। इस मार्ग पर 110 किलोमीटर की दूरी पर 14 बड़े और सवा सौ छोटे रेल पुल-पुलिया हैं। नक्सलियों ने तीसरी बार रेल पुल को निशाना बनाया है। पहली बार 22 जनवरी 2010 को नेरली ब्रिज में फिश प्लेट व नट बोल्ट खोलकर नक्सलियों ने पुल से मालगाड़ी गिराने की कोशिश की थी पर ऐन वक्त पर यात्री ट्रेन के आ जाने से नक्सलियों ने रेल पटरी पर स्लीपर डालकर पैसेंजर को पुल से जाने से रोक दिया था। इसके बाद 29 मार्च 2014 और 14 मई 2014 को भी नक्सली रेल पुलों को निशाना बना चुके हैं। पटरी उखाड़ने पर एक-दो दिन में रेलमार्ग बहाल कर लिया जाता है पर यदि रेल पुल को निशाना बनाया गया तो कई दिन मार्ग बाधित रहने की स्थिति बन सकती है।मध्य बस्तर के बास्तानार ब्लॉक के काकलूर- कुम्हारसोड़रा के बीच पौने दो साल में नक्सली आठ बार रेलमार्ग पर निशाना साध चुके हैं। 29 सितंबर 2012 को इस क्षेत्र में नक्सलियों ने पहली वारदात को अंजाम दिया था। इसके बाद यहां एक के बाद कई वारदातों को आसानी से अंजाम देते आ रहे हैं। आठ बार पटरी उखाड़कर नक्सली पांच बार मालगाड़ी गिराने में सफल रहे हैं। यह क्षेत्र बास्तानार ब्लॉक मुख्यालय से 14 किलोमीटर दूर जंगल में हैसाल 2005 से नक्सली लगातार केके रेललाइन में रेलमार्ग को निशाना बनाते आ रहे हैं। नक्सलियों ने पहली बार 20 जुलाई 2005 को आंध्रप्रदेश-ओडिशा बार्डर पर स्थित दारलीपुट स्टेशन को बम विस्फोट कर उड़ाया था। उसके बाद से अब तक 70 से अधिक वारदातों को अंजाम दे चुके हैं। एक तरफ जहां नक्सली रेल पटरी उखाड़कर रेलमार्ग को क्षतिग्रस्त करते आ रहे हैं वहीं पचहत्तर फीसदी मौकों पर मालगाड़ियां उखड़ी पटरियों की चपेट में आकर दुर्घटनाग्रस्त हुई हैं। इस अवधि में 31 बार नक्सलियों द्वारा ट्रेनों में बैनर बांधे गए और दो बार पैसेंजर ट्रेन में पेंट से नक्सली नारे लिखे गए।
May 15 2014 (08:37)  नक्सलियों ने पुल से गिराई मालगाड़ी, रेलमार्ग बंद (naidunia.jagran.com)
back to top
Major Accidents/DisruptionsECoR/East Coast  -  

News Entry# 176961     
   Tags   Past Edits
May 15 2014 (8:37AM)
Station Tag: Kottavalasa Junction/KTV added by Pp**/36064

May 15 2014 (8:37AM)
Station Tag: Jagdalpur/JDB added by Pp**/36064

May 15 2014 (8:37AM)
Station Tag: Kirandul/KRDL added by Pp**/36064

Posted by: Pp*^~  5969 news posts
किरंदुल-कोत्तावालसा रेलमार्ग के नक्सल प्रभावित किरंदुल रेल सेक्शन में नक्सली बुधवार को एक बार फिर रेल पुल को निशाना बनाते हुए एक बड़ी दुर्घटना को अंंजाम देने में सफल रहे। संभागीय मुख्यालय से करीब 60 किलोमीटर दूर मध्य-दक्षिण बस्तर की सीमा पर काकलूर-कुम्हारसोड़रा स्टेशनों के बीच नक्सलियों द्वारा रेल पुल के नट-बोल्ट व फिश प्लेट खोल पटरी उखाड़ देने से मालगाड़ी के तेरह डिब्बेेे और दो इंजन पुल से नीचे गिर गए।वहीं दो डिब्बे पुल में लटके रहे हैं। पुल से मालगाड़ी गिराने की घटना के कारण विशाखापट्टनम-किरंदुल पैसंेजर किरंदुल में ही रद्द कर दी गई है। जिस समय यह हादसा हुआ उसके तीन घंटे बाद यही से पैसेंजर ट्रेन को गुजरना था। पुल की मरम्मत व रेललाइन बहाल होने में 36 से 48 घंटे का समय लगने की संभावना को देखते हुए पैसेंजर के कम से कम दो दिनों तक रद्द रह सकती है। विशाखापट्टनम से आने वाली पैसेेेंजर को...
more...
जगदलपुर तक चलाने का निर्णय लिया गया है। दुर्घटना की चपेट में आई मालगाड़ी 118 डिब्बों की थी। जिसमें 6 इंजन लगे थे। बैलाडीला से लौह अयस्क की ढुलाई के लिए दो मालगाड़ियों को जोड़कर जम्बों रैक भी चलाया जाता है। रात 12 बजे यह मालगाड़ी जगदलपुर से निकली थी। काकलूर से ढ़ाई किलोमीटर आगे जैसे ही मालगाड़ी ने पुल में प्रवेश किया सामने के इंजन और डिब्बें पलट कर पुल से नीचे जा गिरे। घटना में ट्रेन के ड्रायवर व गार्ड को हल्की चोंटे आई हैं। दोनों की हालत खतरे से बाहर हैं। तड़के 4 बजकर 10 मिनट पर हुई इस घटना के बाद से केके रेललाइन के जगदलपुर व कि रंदुल रेल सेक्शन में रेल आवागमन ठप पड़ गया है। डेढ़ माह के भीतर इस सेक्शन में यह दूसरी बड़ी रेल दुर्घटना है। इसके पूर्व 29 मार्च 2014 को भी इसी इलाके में दंतेवाड़ा-कमलूर स्टेशनों के बीच नक्सलियों नें पटरी उखाड़ कर मालगाड़ी के दो इंजनों को पुल से गिरा दिया था। जंगली इलाका होने से अधिकारियों को घटनास्थल तक पहुंचने में पांच घंटे से अधिक समय लग गया। स्थानीय रेल अधिकारी, पुलिस व आरपीएफ के जवानों के सुबह दस बजे घटनास्थल पहुंचने के बाद स्थिति का जायजा लेकर मंडल रेल मुख्यालय वाल्टेयर को घटना की स्थिति से अवगत कराया गया। तब कहीं जाकर कोरापुुट, रायगढ़ा, विशाखापट्टनम, किरंदुल से रिलीफ ट्रेनें घटनास्थल के लिए रवाना की गई।
मौके पर पहुंचे अधिकारियों ने बताया कि मंडल रेल मुख्यालय से एडीआरएम सहित आधा दर्जन वरिष्ठ रेल अधिकारियों के देर शाम रात तक घटनास्थल पहुंचने के बाद क्षतिग्रस्त डिब्बों को पटरी से हटाकर पुल की मरम्मत का कार्य शुरू किया जाएगा। इस घटना से रेलवे को करोड़ों का नुकसान हुआ है।
120 मीटर लंबा है पुल
काकलूर-कुम्हारसोड़रा के बीच जिस पुल पर यह घटना हुई उसकी लंबाई 120 मीटर है। चार स्पान का यह पुल 1962 में बना था। नक्सलियों ने पुल के उपर करीब पैतालिस मीटर तक पटरी के नट-बोल्ट खोल दिए थे। फिश प्लेेटें भी निकाल दी थी। इस इलाकें नक्सली अभी तक रेलमार्ग को निशाना बनाते रहे हैं पर अब नक्सलियों को भी निशाना बनाना शुरू कर दिया है। नक्सली गतिविधियों की दृष्टि से अति संवेदनशील क्षेत्र होने के कारण यहां रेलमार्ग व पुलों की सुरक्षा का कोई इंतजाम नहीं हैं।
May 15 2014 (08:30)  नक्सलियों ने पुल से गिराई मालगाड़ी (epaper.jagran.com)
back to top
Major Accidents/DisruptionsECoR/East Coast  -  

News Entry# 176960   Blog Entry# 1097602     
   Tags   Past Edits
May 15 2014 (8:30AM)
Station Tag: Kottavalasa Junction/KTV added by Pp**/36064

May 15 2014 (8:30AM)
Station Tag: Kirandul/KRDL added by Pp**/36064

May 15 2014 (8:30AM)
Station Tag: Jagdalpur/JDB added by Pp**/36064

Posted by: Pp*^~  5969 news posts
दुर्घटनाग्रस्त मालगाड़ी 118 डिब्बों की थी जिसमें छह इंजन लगे थे। इनमें लौह अयस्क लदा हुआ था। रात 12 बजे मालगाड़ी जगदलपुर से निकली थी। मौके पर पहुंचे अधिकारियों ने बताया कि देर शाम क्षतिग्रस्त डिब्बों को पटरी से हटाकर पुल की मरम्मत का काम शुरू किया जाएगा। दुर्घटना से रेलवे को करोड़ों का नुकसान हुआ है। जिस पुल पर यह घटना हुई उसकी लंबाई 120 मीटर है जिसका निर्माण 1962 में हुआ था। नक्सलियों ने पुल के ऊपर करीब 45 मीटर तक पटरी के नट-बोल्ट खोल दिए थे। डेढ़ महीने के भीतर इस सेक्शन में यह दूसरी बड़ी रेल दुर्घटना है।छत्तीसगढ़ में किरंदुल-कोत्तावालसा रेलमार्ग के नक्सल प्रभावित किरंदुल रेल सेक्शन में बुधवार को नक्सलियों ने एक बार फिर रेल पुल को निशाना बनाते हुए बड़ी दुर्घटना को अंजाम दिया। काकलूर-कुम्हारसोडरा स्टेशनों के बीच नक्सलियों द्वारा रेल पुल के नट-बोल्ट व फिश प्लेट खोल पटरी उखाड़ देने से मालगाड़ी के 13...
more...
डिब्बे और दो इंजन पुल से नीचे गिर गए। दो डिब्बे पुल में लटके हुए हैं। तड़के चार बजकर 10 मिनट पर हुई इस घटना के बाद से रेल आवागमन ठप पड़ गया है। जंगली इलाका होने से अधिकारियों को घटनास्थल तक पहुंचने में पांच घंटे से अधिक समय लग गया।

2743 views
May 15 2014 (08:44)
Pained to know Boeing 777 landcrashed~   23274 blog posts   21099 correct pred (68% accurate)
Re# 1097602-1            Tags   Past Edits
with this Kirandul Kottavalasa line Vizagites are asking for new zone with VSKP HQ's...but neither EcoR nor the new zone can understand the problems of maoist attack & to improve the situation there...people sitting inside the comforts of air conditioned rooms in VSKP will continue to enjoy the revenue earned by iron ore traffic without caring for the people of this naxalite area.

2803 views
May 15 2014 (08:48)
Er AC*^~   6268 blog posts   54552 correct pred (72% accurate)
Re# 1097602-2            Tags   Past Edits
118 coaches ?

2749 views
May 15 2014 (08:52)
Pained to know Boeing 777 landcrashed~   23274 blog posts   21099 correct pred (68% accurate)
Re# 1097602-5            Tags   Past Edits
yes in freight dominated areas,2 BOXN rakes are coupled together to run as a combined rake,these rakes cant stop anywhere for crossing neither any Exp/Pass ca o/t them

2780 views
May 15 2014 (08:56)
Pp*^~   4189 blog posts   124 correct pred (79% accurate)
Re# 1097602-6            Tags   Past Edits
You missed a very vital point:
Out of 445 km 330 km is in CG and this section alone earns more than 1000 Cr Rs one of highest in IR.
If new zone happens and if it happens on state boundary considerations than Division boundary restructuring is very much needed.
In IR income CG contribution is far far greater and no one talks
...
more...
about it..

2752 views
May 15 2014 (08:59)
Pained to know Boeing 777 landcrashed~   23274 blog posts   21099 correct pred (68% accurate)
Re# 1097602-7            Tags   Past Edits
yes chhatisgarh,orissa & jharkhand are highest ferrous & non-ferrous mineral producing state & Assam is the highest POL & Natural gas producing state.yet GOI hasnt done anything for improvement of the local people there & continue to exploit these areas...actually rly tracks are of no use to the local habitants there.

2670 views
May 15 2014 (09:12)
यन्त्रविन्यासYantravinyas   19652 blog posts   427 correct pred (89% accurate)
Re# 1097602-9            Tags   Past Edits
NEw zone should not be formed......KK line is the life line of iron ore exports
Nov 01 2013 (21:37)  Phailin, torrential rains cause Rs 50 crore loss to Waltair railway division (timesofindia.indiatimes.com)
back to top
Other NewsECoR/East Coast  -  

News Entry# 154948     
   Tags   Past Edits
Nov 01 2013 (9:49PM)
Station Tag: Kottavalasa Junction/KTV added by moderator**/12

Nov 01 2013 (9:48PM)
Station Tag: Kirandul/KRDL added by moderator**/12

Nov 01 2013 (9:43PM)
Station Tag: Visakhapatnam Junction/VSKP added by moderator**/12

Posted by: Jayashree ❖ Amita*^  36160 news posts
VISAKHAPATNAM: The Waltair division of the East Coast Railways (ECoR) has piled up losses of around Rs 50 crore this month due to the suspension of passenger services at various railway stations, particularly Visakhapatnam railway station, for nearly 10 days due to various factors as well as slowdown in cargo movement on its money spinner Kirandul-Kottavalasa railway line.
This includes nearly Rs 40 crore losses due to lower freight movement on the KK line and another Rs 10 crore due to passenger traffic disruptions, said railway sources. Daily about 50,000 passengers travel to various parts of the country from the division, which covers the three north coastal districts of Srikakulam, Vizianagaram and Visakhapatnam, besides a few parts of neighbouring Odisha.
Railway
...
more...
officials attributed the losses to the Samaikyandhra stir by Seemandhra electricity board employees on October 7, besides the two natural calamities -- Cyclone Phailin that hit north coastal AP on October 12 and the torrential rains under the influence of northeast monsoon from October 21 to 27. Due to disruptions, more than 20,000 passengers travel from Vizag alone. But many passengers could not utilize Indian Railways services for nearly 10 days due to the disruptions in train traffic due to these three key reasons this month.
Admitting to the losses, Waltair divisional manager Anil Kumar said the losses would be more than Rs 10 crore just on account of disruption of passenger traffic. "I have instructed my staff to prepare a report on the losses to the division due to passenger train disruptions. In terms of freight traffic, though the division did not face any track damages, particularly on the Kirandul-Kottavalasa railway line like it did last year due to Cyclone Nilam, it suffered losses on the KK line due to lack of cargo movement during the torrential rains as no mining activity was carried out by National Mineral Development Corporation (NMDC) at Bailadilla in Chhattisgarh during the period," he said.
"The division, which has 38 railway stations under the three north coastal districts in addition to a couple of stations in neighbouring Odisha, on an average earns Rs 1 crore daily from passenger traffic. But because of disruptions for nearly 10 days due to the protests and track damages due to rains and cyclone Phailin, the division roughly incurred nearly Rs 10 crore losses from passenger traffic," a senior railway official said.
The Indian Railways regulated 17 key trains, including 12 cancellations and five short-terminations, due to the strike by the electricity employees of APGenco, APTransco and Eastern Power Distribution Company of AP Limited (EPDCL) to protest against the bifurcation of the state. The supply of 25KV power to the electric traction overhead was suspended due to the strike. As a result, all the 17 trains could not move on the Chennai-Howrah main railway line passing through Vizag, Vizianagaram and Srikakulam Road under Waltair division in the first week of this month, a senior railway official said.
While the main railway track between Palasa and Ichchapuram railway stations in Srikakulam district were damaged due to rains and cyclone Phailin, the railway line was also damaged at Yelamanchili and Narsingapalli railway station limits in Visakhapatnam district due to the recent torrential rains.
The railways were forced to suspend around 61 trains passing through Visakhapatnam to various destinations for 10 days -- on October 7 due to no power, from October 11 to 13 due to cyclone and from October 24 to October 29 due to rains. Most of the trains were diverted via either Vijayawada or Vizianagaram railway stations when the railway traffic was suspended between Palasa and Ichchapuram due to heavy rains caused by Cyclone Phailin as well as the northeast monsoon.
Page#    Showing 1 to 10 of 10 News Items  

Scroll to Top
Scroll to Bottom


Go to Desktop site