Full Site Search  
Thu Jan 19, 2017 16:28:31 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search

LHU/Loharu Junction (5 PFs)
     लोहारू जंक्शन

Track: Single Diesel-Line

Type of Station: Junction
Number of Platforms: 5
Number of Halting Trains: 26
Number of Originating Trains: 0
Number of Terminating Trains: 0
SH 8, Bhiwani Distt.
State: Haryana
Elevation: 269 m above sea level
Zone: NWR/North Western
Division: Bikaner
1 Travel Tips
No Recent News for LHU/Loharu Junction
Nearby Stations in the News

Rating: 3.4/5 (16 votes)
cleanliness - good (2)
porters/escalators - average (2)
food - average (2)
transportation - good (2)
lodging - good (2)
railfanning - good (2)
sightseeing - good (2)
safety - good (2)

Nearby Stations

SAWN/Sohansra 6 km     BOTR/Bhavdhari 6 km     KLSP/Kushal Pura 7 km     PVZ/Parvezpur 12 km     STNL/Satnali 17 km     SRGH/Surajgarh 17 km     NWN/Nanwan 21 km     RMB/Rampura Beri 21 km     GLKN/Gugalwa Kirtan Halt 25 km     NDRT/Nangal Degrota 27 km    

Station News

Page#    Showing 1 to 18 of 18 News Items  
Jul 10 2016 (01:28)  railway bipass, creation, will be started, bhiwani-रेलवे बाईपास पर जल्द होगा काम शुरू (www.amarujala.com)
back to top
New Facilities/TechnologyNWR/North Western  -  

News Entry# 273277     
   Tags   Past Edits
Jul 10 2016 (1:28AM)
Station Tag: Loharu Junction/LHU added by Subhash/746156

Jul 10 2016 (1:28AM)
Station Tag: Hisar Junction/HSR added by Subhash/746156

Jul 10 2016 (1:28AM)
Station Tag: Bhiwani Junction/BNW added by Subhash/746156

Jul 10 2016 (1:28AM)
Station Tag: Bhiwani City/BNWC added by Subhash/746156

Posted by: Subhash  984 news posts
पिछले 14 साल से लंबित रेलवे बाईपास प्रोजेक्ट अब जल्द सिरे चढ़ेगा। सिटी स्टेशन से हिसार रेलवे लाइन को जोड़ने वाले इस बाईपास के बनने के बाद मालगाड़ियों को भिवानी जंक्शन नहीं आना पड़ेगा। माल गाड़ियों का सीधा रोहतक-हिसार आवागमन हो जाएगा। बाईपास बनने के बाद भिवानी जंक्शन पर रेल ट्रैफिक कम होगा। उत्तर-पश्चिम रेलवे मंडल रेल उपभोक्ता सलाहकार समिति की कल शाम बीकानेर में हुई बैठक में यह मसला उठाया गया। बैठक में बीकानेर के सीनियर डिविजन ऑपरेटिंग मैनेजर रजनीश ने बताया कि आगामी छह माह के दौरान भिवानी सिटी से हिसार रेलवे लाइन तक रेल बाईपास बनाया जाएगा। बैठक के बाद सलाहकार समिति के सदस्य महावीर डालमिया ने इस बात की पुष्टि करते हुए बताया कि बैठक में तय हुआ है कि छह महीने के भीतर काम आरंभ हो जाएगा। उम्मीद है कि काम शुरू होने के तीन-चार महीने के भीतर भिवानी को रेलवे बाईपास की सौगात मिल जाएगी।...
more...

करीब चार किलोमीटर है बाईपास
रेलवे बाईपास का प्रपोजल पहली बार 2002 में बना। करीब चार किलोमीटर लंबे बनने वाले इस बाईपास में 14 साल तो लग चुके हैं। इस बाईपास पर 2011-12 में साढ़े चार करोड़ रुपये अनुमानित लागत आनी थी। करीब चार साल पहले जमीन अधिग्रहण हो चुकी है और मार्किंग भी हो चुकी है।
22 सूत्रीय मांगपत्र सौंपा
उत्तर पश्चिम रेलवे बीकानेर मंडल रेल उपभोक्ता सलाहकार समिति के सदस्य महाबीर प्रसाद डालमिया ने डीआरएम को 22 सूत्रीय मांगों का ज्ञापन भी सौंपा। उन्होंने बताया कि ज्ञापन में भिवानी-रोहतक रेल लाईन का दोहरीकरण का कार्य एवं विद्युतीकरण का कार्य शुरू करवाए जाने, फाटक संख्या 52 स्पेशल कृष्णा कालोनी से दुर्गा कालोनी जाने वाले फाटक पर मंजूर हो चुके आरयूबी का निर्माण कार्य शुरू करवाने, भिवानी जंक्शन से हिसार की तरफ जाने वाली रेल लाइन के साथ जागृति कालोनी-बीटीएम मिल के लिए आरयूबी का बजट तैयार करवाकर उपलब्ध करवाने बारे, भिवानी हाल्ट पर बनने वाले बाईपास के शुरू होने वाले कार्य की जानकारी उपलब्ध कराने, रियायती टिकटों की जानकारी के लिए स्टेशन पर बोर्ड लगाने समेत अन्य मांगों को शामिल किया है।
भिवानी-लोहारु रेलवे लाइन की ड्राइंग प्रदेश सरकार को भेजी
प्रस्तावित भिवानी-लोहारू नई रेल लाइन का मसला भी बैठक में उठा। यह मामला रेल मंडल सलाहकार सदस्य सुधीर चांदवास ने उठाया। अधिकारियों ने बताया कि भिवानी-लोहारु रेलवे लाइन की ड्राइंग आज ही प्रदेश सरकार के पास अंतिम स्वीकृति के लिए भेजी जाएगी, जिसकी स्वीकृति मिलते ही मुआवजा राशि की एपीआर शुरू कर दी जाएगी।
May 22 2016 (08:03)  आज रात तिलकब्रिज से सादुलपुर पहुंचेगी पैसेंजर (www.jagran.com)
back to top
Other NewsNWR/North Western  -  

News Entry# 268617   Blog Entry# 1860075     
   Tags   Past Edits
May 22 2016 (8:03AM)
Station Tag: Loharu Junction/LHU added by Hisar to Bulandshahr DEMU required/746156

May 22 2016 (8:03AM)
Station Tag: Bhiwani Junction/BNW added by Hisar to Bulandshahr DEMU required/746156

May 22 2016 (8:03AM)
Train Tag: Tilak Bridge (Delhi) - Rewari Jn. Passenger/54011 added by Hisar to Bulandshahr DEMU required/746156

Posted by: Subhash  984 news posts
-लोहारू क्षेत्र के लोगों की प्रतीक्षत मांग होगी पूरी संवाद सहयोगी, लोहारू: क्षेत्र के लोगों की लंबे समय से प्रतीक्षित मांग आज पूरी हो जाएगी। प्रतिदिन दिल्ली से सादुलपुर तक पैसेंजर ट्रेन चलाने की दैनिक यात्रियों की मांग को रेलवे प्रशासन ने मान लिया है। इसके तहत रेलवे प्रशासन ने नियमित पैसेंजर रेलगाड़ी पर मुहर लगा दी है। यह रेलगाड़ी 22 मई से प्रतिदिन तिलकब्रिज दिल्ली से सादुलपुर के बीच चलेगी। नियमित... और पढ़ें »

2684 views
May 23 2016 (09:18)
buriajitender   5 blog posts
Re# 1860075-1            Tags   Past Edits
Tilkbridge sadulpur passenger should be going to sriganganagar and make superfast
Oct 20 2015 (19:21)  Electrical work in c/w raising of platform no. 1, 2&3 to high level and extension of platform no.1 and allied facilities at Loharu station under ADEN/SDLP. (nwr.indianrailways.gov.in)
back to top
IR Press Release  

News Entry# 245484     
   Tags   Past Edits
Oct 20 2015 (7:21PM)
Station Tag: Loharu Junction/LHU added by Jai Jai Jai Bajrang Bali/229469

Posted by: Fan of 12479^~  926 news posts
Tender for raising of platform no. 1, 2&3 to high level and extension of platform no.1 at Loharu
Aug 30 2015 (21:22)  रेवाड़ी और सीकर के बीच पैसेंजर ट्रेनें 2 सितंबर से दो फेरे लगाएंगी (www.bhaskar.com)
back to top
New/Special TrainsNWR/North Western  -  

News Entry# 239432   Blog Entry# 1578145     
   Tags   Past Edits
Aug 30 2015 (9:22PM)
Station Tag: Loharu Junction/LHU added by Vaibhav Agarwal*^/432532

Aug 30 2015 (9:22PM)
Station Tag: Rewari Junction/RE added by Vaibhav Agarwal*^/432532

Posted by: Vaibhav Agarwal*^  1403 news posts
सीकर-लोहारूरेलखंड के ब्रॉड गेज में तब्दील होने के बाद एक सितंबर से ट्रेनों का संचालन शुरू होने जा रहा है। पहले दिन सीकर से दिल्ली सराय रोहिल्ला के मध्य उद्‌घाटन स्पेशल ट्रेन चलेगी। यह ट्रेन सीकर से 12.45 बजे रवाना होकर शाम 5.30 बजे रेवाड़ी पहुंचेगी। यहां 10 मिनट के ठहराव के बाद ट्रेन रवाना होकर रात 8 बजे दिल्ली सराय रोहिल्ला पहुंचेगी। इसके अलावा रेवाड़ी और सीकर के बीच पैसेंजर ट्रेनें भी 2 सितंबर से दो फेरे लगाएंगी। इनमें से पहली गाड़ी एक सितंबर देर रात 11.15 बजे रवाना होकर सीकर जाएगी।
एक्सप्रेस रेल सेवा का नियमित होगा संचालन
2सितंबर
...
more...
से सीकर-दिल्ली सराय रोहिल्ला-सीकर एक्सप्रेस रेल सेवा का नियमित संचालन प्रारंभ होगा। गाड़ी संख्या 14812 दिल्ली सराय रोहिल्ला-सीकर एक्सप्रेस प्रत्येक बुधवार शुक्रवार को दिल्ली सराय रोहिल्ला से सुबह 6.50 बजे रवाना होकर रेवाड़ी-महेंद्रगढ़ होते हुए दोपहर 1.15 बजे सीकर पहुंचेगी। गाड़ी संख्या 14811 प्रत्येक बुधवार शुक्रवार काे सीकर से दोपहर 2 बजे रवाना होकर रेवाड़ी-महेंद्रगढ़ होते हुए रात 9 बजे दिल्ली-सराय रोहिल्ला पहुंचेगी।
ये होगा टाइम टेबल
{59728पैसेंजर 1 सितंबर से प्रतिदिन रेवाड़ी से रात 11.15 बजे रवाना होकर अगले दिन सुबह 5.00 सीकर पहुंचेगी।
{59727 पैसेंजर 2 सितंबर से प्रतिदिन सीकर से सुबह 7 बजे रवाना होकर दोपहर 1 बजे रेवाड़ी पहुंचेगी।
{ 59730 पैसेंजर 2 सितंबर से ही प्रतिदिन रेवाड़ी से दोपहर 2 बजे रवाना होकर रात 8 बजे सीकर पहुंचेगी।
{ 59729 पैसेंजर 2 सितंबर ही प्रतिदिन सीकर से रात 9 बजे रवाना होकर अगले दिन दोपहर 3 बजे रेवाड़ी पहुंचेगी।
इन सवारी गाड़ियों में 10 साधारण श्रेणी तथा 2 एसएलआर डिब्बों सहित कुल 12 डिब्बे होंगे।

2 posts - Sun Aug 30, 2015 - are hidden. Click to open.

4967 views
Sep 02 2015 (01:56)
Vaibhav Agarwal*^   6114 blog posts   2568 correct pred (94% accurate)
Re# 1578145-3            Tags   Past Edits
NWR Notification
Aug 29 2015 (10:36)  सीकर ट्रैक पर एक से दौड़ेगी राजस्थान संपर्क क्रांति (www.bhaskar.com)
back to top
Commentary/Human InterestNWR/North Western  -  

News Entry# 239297   Blog Entry# 1577137     
   Tags   Past Edits
Aug 29 2015 (10:36AM)
Station Tag: Loharu Junction/LHU added by अनुपम**/401739

Aug 29 2015 (10:36AM)
Station Tag: Sikar Junction/SIKR added by अनुपम**/401739

Aug 29 2015 (10:36AM)
Train Tag: Rajasthan Sampark Kranti Express/12464 added by अनुपम**/401739

Aug 29 2015 (10:36AM)
Train Tag: Rajasthan Sampark Kranti Express/12463 added by अनुपम**/401739

Posted by: 4πu¶am*^~  4354 news posts
सीकर-लोहारू ट्रैक पर करीब तीन साल से चल रहे ब्रॉडगेज लाइन का काम पूरा हो चुका है। अब 1 सितंबर से इस ट्रैक पर ट्रेन दौड़ेगी। राजस्थान की मुख्यमंत्री वसुंधरा राजे ट्रेन को हरी झंडी दिखाकर रवाना करेंगी। जबकि दिल्ली से रेलमंत्री सुरेश प्रभु इस ट्रैक पर रिमोट से ट्रेन के संचालन का शुभारंभ करेंगे। कार्यक्रम का आयोजन सीकर रेलवे स्टेशन पर किया जाएगा, पहली ट्रेन यहीं से रवाना होगी। इससे पहले नगरपालिका चुनाव की आचार संहिता का हवाला देकर 7 अगस्त को होने वाले कार्यक्रम को स्थगित कर दिया गया था।
सीकर से दिल्ली 60 रुपए में
ब्रॉडगेज
...
more...
पर चलने वाली पहली ट्रेन दिल्ली के लिए रवाना होगी। समारोह में रेलवे के डीआरएम स्तर के अधिकारी अथवा जीएम कार्यालय के अधिकारी उपस्थित रहेंगे। सीकर प्लेटफार्म की बड़ी लाइन पर आने वाली पहली ट्रेन राजस्थान संपर्क क्रांति होगी। बीकानेर जोधपुर से चलने वाली दो ट्रेन मेड़ता में 17 कोच के साथ दिल्ली के लिए रवाना होती है।
दिल्ली में यह ट्रेन सुबह पांच बजकर 25 मिनट पर पहुंचती है। यही ट्रेन उद्‌घाटन के लिए गुरुवार शाम को सीकर आएगी, जो बाद में दिल्ली के लिए रवाना होगी। सीकर से दिल्ली का सफर महज 60 रुपए में होगा। एक्सप्रेस ट्रेन में सफर के लिए करीब 120 रुपए लगेंगे। सबसे ज्यादा फायदा झूंझुनू के लोगों को होगा। झूंझुनू से जयपुर का किराया अधिक होने के कारण ट्रेन में सफर सस्ता होगा।
ये होगा ट्रेन का शेड्यूल
रेवाड़ीसे सीकर के लिए पेसेंजर ट्रेन रात 11:15 पर रवाना होगी। सीकर में सुबह 5 बजे पहुंचेगी। इसी तरह सुबह 7 बजे सीकर से रवाना होने वाली पेसेंजर दोपहर में एक बजे रेवाड़ी पहुंचेगी। दोपहर दो बजे चलकर 8 बजे सीकर पहुंचेगी। सीकर से रात 9 बजे रवाना होकर ट्रेन तीन बजे रेवाड़ी स्टेशन पहुंचेगी। इसी तरह बुधवार शुक्रवार को एक्सप्रेस ट्रेन सरायरोहिल्ला स्टेशन से सुबह छह बजकर 50 मिनट पर रवाना होकर सीकर में 1:15 मिनट पर पहुंचेगी।

5406 views
Aug 29 2015 (12:19)
AurngabadPurnaAkolaNagpur~   588 blog posts   1 correct pred (100% accurate)
Re# 1577137-1            Tags   Past Edits
बहुत दिनों बाद खुशखबरी सुनने को मिली आशा करते की चुरू -जयपुर का आमन परिवर्तन भी जल्द हो जाएगा

5241 views
Aug 29 2015 (13:57)
naveengajraj199   2 blog posts
Re# 1577137-2            Tags   Past Edits
Train number jaldi website par lao hame bhi ticket book karani h
Aug 28 2015 (08:01)  इंतजार खत्म, एक को दौड़ेगी ट्रेन (rajasthanpatrika.patrika.com)
News Entry# 239186   Blog Entry# 1577478     
   Tags   Past Edits
Aug 29 2015 (9:09PM)
Train Tag: Sikar - Sarai Rohilla Inaugural Special/09725 added by well played Cheteshwar Pujara/229469

Aug 28 2015 (8:01AM)
Station Tag: Loharu Junction/LHU added by Jodhpur Metro/229469

Aug 28 2015 (8:01AM)
Station Tag: Sikar Junction/SIKR added by Jodhpur Metro/229469

Posted by: Fan of 12479^~  926 news posts
तीन साल से महंगा सफर कर रहे झुंझुनूंवासियों के लिए खुशखबर है कि एक सितंबर से ट्रेन में सफर कर सकेंगे।
मुख्यमंत्री वसुंधरा राजे एक सितंबर को सीकर में ट्रेन को हरी झंडी दिखाकर रवाना करेंगी। मुख्य समारोह सीकर रेलवे स्टेशन पर होगा। नगर निकाय चुनाव में आचार संहिता का हवाला देकर सात अगस्त को होने वाले कार्यक्रम को स्थगित कर दिया गया था।
गौरतलब है कि सात अगस्त को रेल मंत्री वीडियो कांफ्रेंसिंग से हरी झंडी दिखाकर ट्रेन रवाना करने वाले थे। ब्रॉडगेज पर चलने वाली पहली ट्रेन दिल्ली के
...
more...
लिए रवाना होगी। समारोह में रेलवे के डीआरएम स्तर के अधिकारी अथवा जीएम कार्यालय के अधिकारी उपस्थित रहेंगे।
सस्ता होगा सफर, मिलेगी राहत
ट्रेन में सीकर से दिल्ली का सफर 60 रुपए में होगा। एक्सप्रेस ट्रेन में सफर के लिए 120 रुपए लगेंगे। सबसे ज्यादा फायदा झुंझुनूं के लोगों को होगा क्योंकि रोडवेज बस में झुंझुनूं से दिल्ली के सफर में एक्सप्रेस में 207 रुपए किराया लगता है।
वहीं झुझुनूं से जयपुर के लिए 155 रुपए किराया भुगतना पड़ता है। अगर देखा जाए तो दिल्ली जाने पर एक यात्री के साधारण में 147 रुपए और एक्सप्रेस में 87 रुपए की बचत होगी।
ट्रेन चलने का समय
रेवाड़ी से सीकर के लिए पैंसेजर ट्रेन रात 11.15 बजे रवाना होगी। सीकर में सुबह पांच बजे पहुंचेगी। इसी तरह सुबह सात बजे सीकर से रवाना होने वाली पैसेंजर ट्रेन दोपहर एक बजे रेवाड़ी पहुंचेगी। रेवाड़ी से दोपहर दो बजे रवाना होकर शाम आठ बजे सीकर पहुंचेगी।
सीकर से रात नौ बजे रवाना होकर ट्रेन रात दस बजे झुंझुनूं तथा तड़के तीन बजे रेवाड़ी पहुंच जाएगी। इसी तरह बुधवार व शुक्रवार को एक्सप्रेस ट्रेन सराय रोहिला स्टेशन से सुबह 06:50 बजे रवाना होकर सीकर में 01.15 बजे पहुंचेगी। सीकर से ट्रेन 02.15 बजे से रवाना होकर रात नौ बजे दिल्ली पहुंचेगी।
रेल मंत्री सुरेश प्रभु से फोन पर बातचीत हुई है। एक सितंबर से सीकर-लुहारू ब्रॉडगेज टे्रक पर ट्रेन चलेगी। सीकर पहला प्वाइंट होने के चलते मुख्य समारोह सीकर में होगा। जहां पर मुख्यमंत्री वसुंधरा राजे ट्रेन को हरी झंडी दिखाकर रवाना करेंगी। वहां से झुंझुनूं के कार्यकर्ता ट्रेन में बैठकर आएंगे और झुंझुनूं, चिड़ावा और सूरजगढ़ स्टेशन पर स्वागत किया जाएगा।
संतोष अहलावत, सांसद
स्टेशन पर होगा स्वागत
जिले में तीन साल बाद फिर से ट्रेन चलने पर आम लोगों व भाजपा कार्यकर्ताओं की ओर से हर स्टेशन पर ट्रेन का अभिनंदन किया जाएगा। कार्यकर्ता ट्रेन चालक का भी अभिनंदन करेंगे।

2 posts - Sat Aug 29, 2015 - are hidden. Click to open.

4011 views
Aug 30 2015 (13:06)
King of ER HWH Raj   1967 blog posts   117 correct pred (68% accurate)
Re# 1577478-3            Tags   Past Edits
IndianRail site is not showing the availability of the train on 03-09-2015.

3945 views
Aug 30 2015 (13:08)
King of ER HWH Raj   1967 blog posts   117 correct pred (68% accurate)
Re# 1577478-4            Tags   Past Edits
Even IRCTC is not showing the train.

3975 views
Aug 30 2015 (13:14)
King of ER HWH Raj   1967 blog posts   117 correct pred (68% accurate)
Re# 1577478-5            Tags   Past Edits
It seems the booking is only for inaugural run on 01-09-2015.

4174 views
Aug 30 2015 (13:19)
Fan of 12479^~   77331 blog posts   5080 correct pred (77% accurate)
Re# 1577478-6            Tags   Past Edits
booking started for regular run also.

4213 views
Aug 30 2015 (13:20)
Fan of 12479^~   77331 blog posts   5080 correct pred (77% accurate)
Re# 1577478-7            Tags   Past Edits
Train Number Train Name Date
(DD-MM-YYYY) Source Station Destination Station Quota Code
14811 SIKR DEE EXPRES 02-09-2015 SIKAR JN DELHI S ROHILLA GENERAL


S.No.
...
more...
Date (DD-MM-YYYY) Class - SL Class -3A
1 2- 9-2015 AVAILABLE 162 AVAILABLE 52
2 4- 9-2015 AVAILABLE 164 AVAILABLE 54
3 9- 9-2015 AVAILABLE 166 AVAILABLE 56
4 11- 9-2015 AVAILABLE 166 AVAILABLE 56
5 16- 9-2015 AVAILABLE 166 AVAILABLE 56
6 18- 9-2015 AVAILABLE 166 AVAILABLE 56

4141 views
Aug 30 2015 (13:23)
Fan of 12479^~   77331 blog posts   5080 correct pred (77% accurate)
Re# 1577478-8            Tags   Past Edits
14812 DEE SIKAR EXP 02-09-2015 DELHI S ROHILLA SIKAR JN GENERAL


S.No. Date (DD-MM-YYYY) Class - SL Class -3A
1 2- 9-2015 AVAILABLE 241 AVAILABLE 69
2
...
more...
4- 9-2015 AVAILABLE 246 AVAILABLE 69
3 9- 9-2015 AVAILABLE 246 AVAILABLE 69
4 11- 9-2015 AVAILABLE 246 AVAILABLE 69
5 16- 9-2015 AVAILABLE 246 AVAILABLE 69
6 18- 9-2015 AVAILABLE 246 AVAILABLE 69

4081 views
Aug 30 2015 (15:46)
King of ER HWH Raj   1967 blog posts   117 correct pred (68% accurate)
Re# 1577478-9            Tags   Past Edits
Well, it runs twice in a week. I thought it is a daily connectivity between Sikar and Delhi Sarai Rohila.

4035 views
Aug 30 2015 (15:58)
Fan of 12479^~   77331 blog posts   5080 correct pred (77% accurate)
Re# 1577478-10            Tags   Past Edits
RSA with 12463/64 Hence only biweekly.
Jun 20 2015 (20:19)  लोहारू-सीकर रूट : 3 साल से बंद थी छुक-छुक, अब चली तो स्पीड 110 (dainiktribuneonline.com)
News Entry# 230208   Blog Entry# 1519241     
   Tags   Past Edits
Jun 20 2015 (8:19PM)
Station Tag: Sikar Junction/SIKR added by World class LHB Coach more comfortable than Flight/229469

Jun 20 2015 (8:19PM)
Station Tag: Loharu Junction/LHU added by World class LHB Coach more comfortable than Flight/229469

Posted by: Fan of 12479^~  926 news posts
करीब 3 साल से बंद लोहारू-सीकर रेल ट्रैक पर जल्द ही गाड़ियां दौड़ने लगेंगी। नये बनाये गये लोहारू-जयपुर ब्रॉडगेज ट्रैक पर बृहस्पतिवार को ट्रायल के तौर पर 110 किलाेमीटर प्रति घंटे की रफ्तार से 6 एसी डिब्बों वाली ट्रेन दौड़ायी गयी। इस मौके पर रेलवे सुरक्षा आयुक्त चेतन बख्शी ने कहा कि 15 दिनों या एक महीने के अंदर लोहारू-जयपुर ट्रैक पर ट्रेनें शुरू हो जायेंगी।
गौर हो कि इस रेल मार्ग पर गेज बदलने के काम के चलते करीब 3 साल से गाड़ियां बंद हैं। रेलवे सुरक्षा आयुक्त ने 16 जून को सीकर से इस ट्रैक के निरीक्षण का काम शुरू किया था। इसके तीसरे व अंतिम दिन बृहस्पतिवार को उन्होंने अपनी टीम के साथ चिड़ावा से लोहारू तक ट्रॉली में
...
more...
बैठकर ट्रैक का निरीक्षण किया। इसके बाद ट्रायल रन में सीकर से लोहारू रेलवे स्टेशन तक चलायी गयी गाड़ी में चेतन बख्शी के अलावा मंडल रेलवे प्रबंधक अंजली गोयल आदि अधिकारियों ने इस रूट का जायजा लिया।
लोगों को बेसब्री से इंतजार, ट्रायल ट्रेन का स्वागत
पहली बार लोहारू पहुंची सीकर-लोहारू की इस ब्रॉडगेज ट्रायल ट्रेन के स्वागत के लिए लोहारू के गणमान्य लोग सुबह से ही स्टेशन पर पहुंच गये। गर्मी के बावजूद लोग ट्रेन के स्वागत के लिये डटे रहे। रेलवे अधिकारियों का भी लोगों ने खूब स्वागत किया और उन्हें मांगपत्र सौंपा। मांग की गयी कि हावड़ा-जैसलमेर एक्सप्रेस का लोहारू में ठहराव किया जाये। इसे हफ्ते में एक दिन के बजाय रोज चलाया जाये। हरिद्वार-बीकानेर एक्सप्रेस और दिल्ली-जोधपुर एक्सप्रेस को भी रोजाना किया जाये।

1 posts - Sat Jun 20, 2015 - are hidden. Click to open.

3321 views
Jun 21 2015 (13:17)
Fan of 12479^~   77331 blog posts   5080 correct pred (77% accurate)
Re# 1519241-2            Tags   Past Edits
next month ki 15 tarikh tak sikar delhi express chal sakti hai.
Jun 16 2015 (11:16)  ब्रॉडगेज पर दौड़ी पैसेंजर ट्रेन (m.newshunt.com)
News Entry# 229436   Blog Entry# 1513925     
   Tags   Past Edits
Jun 16 2015 (11:16AM)
Station Tag: Loharu Junction/LHU added by Best News ever Jaipur Puri Purshottam Exp/229469

Jun 16 2015 (11:16AM)
Station Tag: Sikar Junction/SIKR added by Best News ever Jaipur Puri Purshottam Exp/229469

Posted by: Fan of 12479^~  926 news posts
(16 Jun) ढाई वर्ष बंद सीकर व झुंझुनूं के रेलवे स्टेशन पर सोमवार को पूरी पेसेंजर ट्रेन को देखकर हर किसी के कदम रूक गए। हर कोई कौतुहल से ट्रेन को ही देखते नजर आया। सीकर व झुंझुनूं के आठ रेलव स्टेशन पर एक सितम्बर 2012 के बाद ब्रॉडगेज पर पहली बार ट्रेन सौ किलोमीटर की स्पीड से चली है। यह ट्रेन लुहारू से सीकर सीआरएस निरीक्षण के लिए पहुंची है। ट्रेक पर तीन दिन सीआरएस ट्रायल चलेगा। टे्रन में 11 डिब्बे लगे हुए है। हालांकि सभी डिब्बे निरीक्षण यान के है, लेकिन डिब्बो में रेलवे इंजीनियरिंग व सिग्नल तथा निर्माण विभाग की टीमें सवार थी। हालांकि इससे पहले 27 मई को चलाई गई ट्रायल ट्रेन की गति भी सौ किलोमीटर प्रति घंटा ही रखी गई थी। ट्रायल के बाद जल्द शुरू होगी ट्रेन सीआरएस की ट्रायल ही सबसे महत्वपूर्ण मानी जाती है। जुलाई में नया टाइम टेबिल रेलवे की ओर...
more...
से घोषित होता है। उससे पहले ट्रेन चलाने की अनुमति मिलने पर नई ट्रेन भी हमें मिल सकती है। यह रहेगा कार्यक्रम 16 जून : सीकर स्टेशन से स्पेशल ट्रेन सुबह 7.55 बजे रवाना होकर दोपहर तीन बजे नुआं स्टेशन पहुंचेगी। इस दौरान सुबह आठ बजे सीआरएस चेतनबक्शी मोटर ट्राली से निरीक्षण करते हुए नुआं पहुंचेंगे। बाद में शाम साढ़े पांच बजे स्पेशल ट्रेन से रवाना होकर शाम सात बजे सीकर पहुंचेगे। पहले दिन करीब 52.73 किलोमीटर का निरीक्षण किया जाएगा। हालांकि इस दौरान सीआरएस रात्रि को मंडावा में ही ठहर सकते है। 17 जून : ब्रॉडगेज पर सीआरएस सीकर से सुबह छह बजे ट्रेन रवाना होकर साढ़े आठ बजे नुआं पहुंचेंगें। 8.55 पर टे्रन नुआं से चिड़ावा पहुंचेंगी। इस दौरान सीआरएस नौ बजे मोटर ट्राली पर रवाना होकर साढ़े पांच बजे चिड़ावा पहुंचेंगे। बाद में शाम छह बजे चिड़ावा से विशेष ट्रेन में रवाना होकर रात नौ बजे सीकर आएंगे। दूसरे दिन 40.68 किलोमीटर का निरीक्षण होगा। 18 जून : सुबह पांच बजे सीआरएस ट्रेन से रवाना होकर साढ़े आठ बजे चिड़ावा पहुंचेंगे। वहां से ट्रेन 8.55 पर रवाना होकर दोपहर डेढ़ बजे लुहारू पहुंच जाएगी। सीआरएस मोटर ट्राली से नौ बजे रवाना होकर डेढ़ बजे लुहारू पहुंचेंगे। बाद में शाम सात बजे सीकर के लिए विशेष ट्रेन के लिए रवाना होंगे। तीसरे दिन 28.61 किलोमीटर का निरीक्षण होगा। इसी दिन सीआरएस ट्रायल समाप्त हो जाएगी। 25 जून तक भेज देंगे रिपोर्ट सीकर। सीआरएस चेतन बक्शी ने बताया कि ट्रैक के बारे में निरीक्षण से पहले कुछ भी नहीं कहा जा सकता है। ट्रैक के निरीक्षण के बाद ही पूरी रिपोर्ट तैयार होती है। निरीक्षण में हर बात का ध्यान रखा जाता है। ट्रैक के निरीक्षण के पहले मोटर ट्राली से भी जांच की जाएगी। इसके बाद दूसरे स्थानों पर भी निरीक्षण का कार्यक्रम है। मुम्बई पहुंचने के बाद 25 जून तक रेलवे बोर्ड व उत्तर-पश्चिम रेलवे के जीएम को रिपोर्ट भेज दी जाएगी। रिपोर्ट के आधार पर ही स्पीड की मंजूरी दी जाएगी। चेतन बक्शी सोमवार रात नौ बजे रेलवे के गेस्ट हाउस में पहुंचे। सीआरएस निरीक्षण के दौरान मंगलवार को जयपुर मंडल रेल प्रबंधक अंजली गोयल भी आएंगी। रेलवे स्टेशन पर सुबह आठ बजे सीआरएस ट्रायल से पहले पटरियों की पूजा की जाएगी। इसके बाद सीआरएस की टीम के 30 कर्मचारी छह मोटर ट्रालियों में रवाना होंगे। मोटर ट्राली दो दिन पहले ही बीकानेर डिविजन व रेवाड़ी से बुलाई गई है।

Jun 16 2015 (11:44)
Boxer Bhai   37078 blog posts   12617 correct pred (61% accurate)
Re# 1513925-1            Tags   Past Edits
New passenger train for sikar

Jun 16 2015 (11:49)
ASHOK THE GREAT   21 blog posts   24 correct pred (68% accurate)
Re# 1513925-2            Tags   Past Edits
will 1st July 15 be lucky day for Sikar Railway?

4408 views
Jun 16 2015 (14:42)
narendrasharma   208 blog posts
Re# 1513925-3            Tags   Past Edits
Ishwar v NWR kare ki CRS certificate mil jaye aur Train regular chale

4338 views
Jun 16 2015 (14:45)
Fan of 12479^~   77331 blog posts   5080 correct pred (77% accurate)
Re# 1513925-4            Tags   Past Edits
15 July tak chalegi..
.
Trial train at SIKR
May 28 2015 (14:48)  ब्रॉडगेज ट्रेन का स्पीड टेस्ट पूरा, जल्द शुरू हो सकती है झुंझुनूं में रेल सुविधा (m.hindi.news18.com)
News Entry# 226520   Blog Entry# 1489057     
   Tags   Past Edits
May 28 2015 (2:49PM)
Station Tag: Jhun Jhunu/JJN added by AC vs Shan E Bhopal super race/229469

May 28 2015 (2:48PM)
Station Tag: Loharu Junction/LHU added by AC vs Shan E Bhopal super race/229469

May 28 2015 (2:48PM)
Station Tag: Sikar Junction/SIKR added by AC vs Shan E Bhopal super race/229469

Posted by: Fan of 12479^~  926 news posts
पिछले तीन साल से ब्रॉडगेज ट्रेन शुरू होने का इंतजार कर रहे झूंझुनूं जिले के लोगों को बुधवार को उस समय राहत भरी सांस मिली जब पहली बार ब्रॉडगेज की ट्रेन का स्पीड टेस्ट हुआ.स्पीड टेस्ट में ब्रॉडगेज ट्रेन काफी तेज रफ्तार से झुंझुनूं स्टेशन से होती हुई गुजरी. इस दौरान ट्रेन को देखने के लिए काफी बड़ी तादाद मे लोग एकत्रित हुए. वहीं ट्रेन के सफल परीक्षण के बाद रेलवे कर्मचारियों ने मिठाई बाट कर एक दूसरे को बधाई दी.
गौरतलब है कि पिछले तीन साल से सीकर और लोहारु के बीच आमान परिवर्तन के चलते रेलो का संचालन बंद है वहीं बुधवार से शुरु हुई ब्रॉडगेज ट्रेन की स्पीड टेस्ट से अब लोगों में ब्रॉडगेज ट्रेन के जल्दी ही शुरू
...
more...
हो जाने की उम्मीद जगी है.

1 posts - Thu May 28, 2015 - are hidden. Click to open.

1 posts - Fri May 29, 2015 - are hidden. Click to open.

3784 views
May 30 2015 (13:13)
ASHOK THE GREAT   21 blog posts   24 correct pred (68% accurate)
Re# 1489057-3            Tags   Past Edits
Can any body provide expected date of train service resume?
May 13 2015 (07:12)  सीकर-लुहारू के बीच जल्द चलेगी ट्रेन (m.newshunt.com)
News Entry# 224401   Blog Entry# 1466306     
   Tags   Past Edits
May 13 2015 (7:14AM)
Station Tag: Loharu Junction/LHU added by सूर्यनगरी सुपरफ़ास्ट/229469

May 13 2015 (7:14AM)
Station Tag: Sikar Junction/SIKR added by सूर्यनगरी सुपरफ़ास्ट/229469

Posted by: Fan of 12479^~  926 news posts
झुंझुनूं सीकर-लुहारू ब्रॉडगेज लाइन का काम पूरा हो गया है। जो छोटा मोटा काम है उसे शीघ्र पूरा किया जाएगा। अब इंतजार सुरक्षा मापदंडों का सर्वे करने के लिए सीएसआर टीम का है। इसके बाद रेल की स्पीड मापने के लिए भी एक टीम आएगी। सब कुछ ठीक रहा तो मई के अंतिम सप्ताह या फिर जून के पहले सप्ताह में टे्रन शुरू होने की संभावना है। सोमवार को रेलवे के वरिष्ठ मंडल (वाणिज्य) प्रबंधक विवेक रावत ने अधिकारियों के साथ सीकर-लुहारू के बीच स्थित कई रेलवे स्टेशनों पर ब्राडगेज के काम व यात्रियों की सुविधाओं के कार्यों का निरीक्षण किया। उन्होंने सभी स्टेशन अधीक्षकों को शेष काम को जल्द पूरा करने के निर्देश दिए। रेलवे के वरिष्ठ मंडल (वाणिज्य) प्रबंधक रावत ने बताया कि अब ट्रेन शीघ्र शुरू की जाएगी। अब ज्यादा समय नहीं लगेगा। उनके साथ सीनियर ऑपरेटिव मैनेजर गौरव गौड़ व डीसीएम आरसी चौधरी भी थे। उन्होंने स्टेशन...
more...
पर बने सिग्नल कक्ष, परिचालन संबंधी जानकारी भी ली। उन्होंने नवलगढ़, मुकुंदगढ़, चिड़ावा आदि रेलवे स्टेशनों का भी निरीक्षण किया। टिकटों के लिए खोले जाएंगे कियोस्क रावत ने बताया कि गाड़ी के शुरू ताकि यात्रियों को स्टेशन के बाहर मुख्य द्वार पर भी टिकट मिल सके। अभी यह रेलवे की योजना में है, टिकट खिड़की पर आने वाले लोगों की संख्या को देखते हुए कियोस्क खोलने का निर्णय किया जाएगा। झुंझुनूं रेलवे स्टेशन पर महिलाओं व पुरुषों के लिए अलग-अलग वेटिंग रूम होंगे। पहले यहां पर एक ही वेटिंग रूम था। रावत ने एक और कमरा वेटिंग रूम खोलने के निर्देश दिए। दो यात्री गाड़ी चलाने की संभावना रेलवे अधिकारियों की माने तो शुरूआत में दो यात्री गाड़ी चलाए जाने की संभावना है। रेवाड़ी से सीकर तक की लाइन के बीच दो यात्री गाड़ी चलाई जाएगी। ऐसे में जयपुर व दिल्ली जाने वाले यात्रियों को एक ट्रेन बदलनी ही पड़ेगी। जयपुर और दिल्ली का सीधा सफर यात्री अभी नहीं कर पाएंगे। सीकर से जयपुर तक की लाइन का काम अभी शुरू भी नहीं हुआ हैं। दो वाटर कूलर आए, स्वीकृति नहीं स्टेशन अधीक्षक मीणा ने बताया कि रेलवे स्टेशन पर लगाने के लिए दो वाटर कूलर आए हैं, लेकिन विभाग की ओर से स्वीकृति नहीं मिली है। यदि स्वीकृति मिल जाए और यहां के लोगों से मदद लेकर वाटर कूलर लगा दिए जाएंगे। किराया सूची लगाने के निर्देश झुंझुनूं रेलवे स्टेशन पर किराया सूची भी जल्द लगाई जाएगी। इस संबंध में रावत ने अधिकारियों को निर्देश दिए। उन्होंने स्टेशन पर किराया सूची और रेलवे के टोल फ्री हैल्पलाइन नंबर बड़े अक्षरों में अंकित करवाने के निर्देश दिए। आरपीएफ के लिए अस्थाई कमरा बनाएं झुंझुनूं के रेलवे स्टेशन अधीक्षक एमके मीणा ने प्लेटफार्म के पास स्थित आरपीएफ के कमरे पर आपत्ति जताई। उन्होंने इस कमरे को टीसी रूम के लिए काम में लेने का सुझाव दिया। मीणा ने कहा कि आरपीएफ के लिए अस्थाई कमरा प्लेटफार्म पर बनवाया जाए। इस दौरान रावत ने रेलवे स्टेशन पर किए गए सभी निर्माण कार्यो का जायजा लिया और निर्देश दिए।
Previous Page

3018 views
May 13 2015 (07:15)
Fan of 12479^~   77331 blog posts   5080 correct pred (77% accurate)
Re# 1466306-1            Tags   Past Edits
Good news ..
CRS trial soon
If report Ok then train will start in May last week
Two trains are expected on this route.
Page#    Showing 1 to 18 of 18 News Items  

Scroll to Top
Scroll to Bottom


Go to Desktop site