Full Site Search  
Wed Jun 28, 2017 03:49:43 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Large Station Board; Reservation Counter;

MV/Mayiladuturai Junction (5 PFs)
மயிலாடுதுறை சந்திப்பு     मयिलाडुतुरै जंक्शन
[Mayavaram]

Track: Construction - Single-Line Electrification

Type of Station: Junction
Number of Platforms: 5
Number of Halting Trains: 32
Number of Originating Trains: 13
Number of Terminating Trains: 13
Sarathattai Street,Railway Cross Road,Mayiladuthurai,PIN 609003
State: Tamil Nadu
Elevation: 16 m above sea level
Zone: SR/Southern
Division: Tiruchchirappalli
5 Travel Tips
No Recent News for MV/Mayiladuturai Junction
Nearby Stations in the News

Rating: 3.3/5 (62 votes)
cleanliness - good (8)
porters/escalators - average (6)
food - average (8)
transportation - good (8)
lodging - average (8)
railfanning - good (8)
sightseeing - good (8)
safety - good (8)

Nearby Stations

MVM/Mayuram Town 4 km     MY/Malliyam 5 km     NID/Nidur 5 km     ANP/Anandatandavapuram 7 km     MNMP/Mannampandal 8 km     KTM/Kutralam 9 km     MNX/Manganallur 9 km     KLMD/Kollumangudi 12 km     SEMB/Sembanarkoil 12 km     VDL/Vaithisvaran Koil 14 km    

Station News

Page#    Showing 1 to 20 of 24 News Items  next>>
மயிலாடுதுறையிலிருந்து தரங்கம்பாடிக்கு ரயில் சேவையைத் தொடங்க வேண்டும் என வலியுறுத்தி, தமிழ்நாடு அரசு அனைத்துத்துறை ஓய்வூதியர் சங்கக் கூட்டத்தில் தீர்மானம் நிறைவேற்றப்பட்டுள்ளது.
இந்தச் சங்கத்தின் நாகை மாவட்ட பேரவைக் கூட்டம், மாவட்டத் தலைவர் எஸ். ஜெகதீசன் தலைமையில் மயிலாடுதுறையில் ஞாயிற்றுக்கிழமை நடைபெற்றது.
இதில் சங்கத்தின் மாவட்டச் செயலர் கு. பழனிவேல், மாவட்ட இணைச் செயலர் கருணாநிதி, மாநிலச் செயற்குழு உறுப்பினர்கள் திருஞானசம்பந்தம், கல்லூரி கல்வி ஆசிரியர் சங்கத்தைச் சேர்ந்த பாண்டியன், ஓய்வு பெற்ற காவலர் நலச் சங்கத்தின் மாநிலச் செயலர் ஜெயக்குமார் உள்ளிட்டோர் பங்கேற்று 7 -ஆவது ஊதியக் குழுவில் உள்ள குறை மற்றும் நிறைகள் குறித்துப் பேசினர்.
கூட்டத்தில்
...
more...
நிறைவேற்றப்பட்ட தீர்மானங்கள்:
மயிலாடுதுறை - தரங்கம்பாடி இடையேயான ரயில் சேவையைத் தொடங்க வேண்டும். மயிலாடுதுறையை தலைமையிடமாகக் கொண்ட தனி மாவட்டம் உருவாக்க வேண்டும். மயிலாடுதுறை நகராட்சிக்குள்பட்ட பகுதிகளில் உள்ள குளங்கள், குட்டைகள் மற்றும் வாய்க்கால்களில் செய்யப்பட்டுள்ள ஆக்கிரமிப்புகளை அகற்றி தூர்வார வேண்டும் உள்ளிட்ட தீர்மானங்கள் நிறைவேற்றப்பட்டன.
News courtesy - Dinamani
Apr 28 2017 (16:55)  விழுப்புரம் - தஞ்சாவூர் ரயில் பாதை ரூ.218 கோடியில் மின் மயமாகிறது (m.dinamalar.com)
back to top
New Facilities/TechnologySR/Southern  -  

News Entry# 301059   Blog Entry# 2255210     
   Tags   Past Edits
Apr 28 2017 (16:55)
Station Tag: Peralam Junction/PEM added by sGs*^~/41440

Apr 28 2017 (16:55)
Station Tag: Thiruvarur Junction/TVR added by sGs*^~/41440

Apr 28 2017 (16:55)
Station Tag: Thanjavur Junction/TJ added by sGs*^~/41440

Apr 28 2017 (16:55)
Station Tag: Kumbakonam/KMU added by sGs*^~/41440

Apr 28 2017 (16:55)
Station Tag: Mayiladuturai Junction/MV added by sGs*^~/41440

Apr 28 2017 (16:55)
Station Tag: Villupuram Junction/VM added by sGs*^~/41440

Posted by: sGs*^~  248 news posts
விழுப்புரத்திலிருந்து தஞ்சாவூர் வரையிலான ரயில் பாதையை மின் மயமாக்க முடிவெடுக்கப்பட்டு, அந்த திட்டத்திற்கு, 218 கோடி ரூபாய் ஒதுக்கப்படுவதாக, மத்திய அரசு அறிவித்து
உள்ளது. மற்ற மாநிலங்களோடு ஒப்பிடுகையில், தமிழகத்தில், ரயில்வே திட்டங்கள் அனைத்தும் ஆமை வேகத்திலேயே நடக்கின்றன. அண்டை மாநிலமான கேரளாவில், அனைத்து ரயில் பாதைகளுமே, மின் மயமாக்கப்பட்டே ரயில்கள் இயக்கப் படுகின்றன; ஆனால், தமிழகத்தில் மின் மயமாக்கப்படாத பாதைகளே, அதிகமாக உள்ளன. மதுரை - கன்னியாகுமரிக்கு இடையிலான பாதையை, மின் மயமாக்க வேண்டுமென்ற கோரிக்கை, நீண்ட காலமாகவே இருந்து வருகிறது. இந்நிலையில்தான், விழுப்புரம்- - தஞ்சாவூர் இடையிலான ரயில் பாதையை, மின் மயமாக்கும் திட்டம், தற்போது துாசு தட்டப்பட்டு உள்ளது. இந்த திட்டம், கடந்த மத்திய பட்ஜெட்டில் அறிவிக்கப்பட்டு இருந்தது. இந்த திட்டம், விழுப்புரம்,கடலுார், மயிலாடுதுறை, தஞ்சாவூர் மற்றும் மயிலாடுதுறை திருவாரூர் என, 228 கி.மீ., துாரம் உடையது. இந்த பாதைதான், தற்போது மின் மயமாக்கப்பட உள்ளது.மின் மயமாக்கும் பணியை, 'ரயில்வே விகாஸ் நிகாம் லிமிடெட்' நிறுவனம் மேற்கொள்ளும். இதற்காக, 218 கோடி ரூபாய் செலவிடப்பட உள்ளது.
தமிழகத்தில்,
...
more...
முக்கிய துறைமுகமாக வளர்ந்து வரும் கடலுார் துறைமுகம், இத்திட்டத்தை, பெரிதும் நம்பி இருந்தது. மின் மயமாக்கப்பட்ட பின், வர்த்தக ரீதியாக, கடலுார் துறைமுகமும், காரைக்கால் துறைமுகமும் பெரிய அளவில் பயனடையும் என எதிர்பார்க்கப்படுகிறது.
- நமது டில்லி நிருபர் -

2 posts - Sat Apr 29, 2017 - are hidden. Click to open.

1 posts - Sat May 06, 2017 - are hidden. Click to open.

992 views
May 14 2017 (08:18)
Finally GZB WAP7 comes to MSCAPE Zone~   1445 blog posts   6 correct pred (40% accurate)
Re# 2255210-4            Tags   Past Edits
But the work hasnt started
Apr 26 2017 (22:43)  Rs 218 cr sanctioned for electrification of Villupuram-Thanjavur railway line (www.deccanchronicle.com)
back to top
New Facilities/TechnologySR/Southern  -  

News Entry# 300877   Blog Entry# 2252471     
   Tags   Past Edits
Apr 26 2017 (22:43)
Station Tag: Thiruvarur Junction/TVR added by sGs*^~/41440

Apr 26 2017 (22:43)
Station Tag: Kumbakonam/KMU added by sGs*^~/41440

Apr 26 2017 (22:43)
Station Tag: Mayiladuturai Junction/MV added by sGs*^~/41440

Apr 26 2017 (22:43)
Station Tag: Thanjavur Junction/TJ added by sGs*^~/41440

Apr 26 2017 (22:43)
Station Tag: Villupuram Junction/VM added by sGs*^~/41440

Posted by: sGs*^~  248 news posts
Nagapattinam: The Railway Ministry has sanctioned Rs 218 crore for electrifying the Villupuram-Thanjavur railway line in Tamil Nadu.
A press release from the Southern Railway, Tiruchirapalli division, said that as announced in the 2017-18 Union Budget, the electrification work of Villupuram-Cuddalore Port – Mayiladuturai-Thanjavur line and Mayiladuturai-Thiruvarur line has been entrusted to Rail Vikas Nigam Limited (RVNL) for execution at an estimated cost of Rs 218.41 crore.
Electrification of the section would provide an alternate route to Chennai-Tiruchchirappalli section via Villupuram-Mayiladuturai-Thanjavur.
In
...
more...
addition, the line would connect Cuddalore and Karaikal ports on electric traction, states the release.
On completion of the project, energy-efficient, eco-friendly Mainline Electric Multiple Units (MEMU trains) can be operated in these sections, paving the way for reduction in commuting time for rail users of delta regions.
Scores of students commuting to educational institutions on this section would be benefitted, it said.
In addition, pilgrims visiting religious centres in and around Chidambaram, Mayiladuthurai, Kumbakonam and Thanjavur can take advantage of the improved connectivity, the release added.

2 posts - Thu Apr 27, 2017 - are hidden. Click to open.

2 posts - Fri Apr 28, 2017 - are hidden. Click to open.

1 posts - Sat Apr 29, 2017 - are hidden. Click to open.

1 posts - Sun Apr 30, 2017 - are hidden. Click to open.

2 posts - Sat May 06, 2017 - are hidden. Click to open.

2 posts - Sun May 07, 2017 - are hidden. Click to open.

1198 views
May 10 2017 (11:30)
TN Mainline should be electrified till tpj   378 blog posts   37 correct pred (71% accurate)
Re# 2252471-11            Tags   Past Edits
Sounds good!
Apr 14 2017 (21:54)  5 more railway stations jump on the Wi-Fi bandwagon (www.thehindu.com)
back to top
New Facilities/TechnologySR/Southern  -  

News Entry# 299626     
   Tags   Past Edits
Apr 14 2017 (21:56)
Station Tag: Mayiladuturai Junction/MV added by rdb*^/69261

Apr 14 2017 (21:56)
Station Tag: Thanjavur Junction/TJ added by rdb*^/69261

Apr 14 2017 (21:56)
Station Tag: Puducherry (Pondicherry)/PDY added by rdb*^/69261

Apr 14 2017 (21:56)
Station Tag: Villupuram Junction/VM added by rdb*^/69261

Apr 14 2017 (21:56)
Station Tag: Kumbakonam/KMU added by rdb*^/69261

Posted by: rdb*^  130121 news posts
Thanjavur, Kumbakonam, Mayiladuthurai, Puducherry, Villupuram get the facility
Southern Railway has decided to expand Wi-Fi facility to more railway stations falling within the Tiruchi Railway Division as part of the Digital India initiative.
Plans are afoot to provide Wi-Fi broadband facility at Thanjavur, Kumbakonam, Mayiladuthurai, Puducherry and Villupuram railway stations in the coming year, Divisional Railway Manager A.K. Agarwal said on Thursday.
Addressing the
...
more...
62nd Railway Week celebrations here, he said that Tiruchi Division had done exceedingly well in maintaining cleanliness at railway stations and on trains. Facilities required by the travelling public had been accorded maximum priority in all planning exercises, be it new reservation facilities or new services. Tiruchi essentially being a passenger-oriented division had carried 3.66 crore passengers during the 2016-17 financial year.
As part of railway safety measures, 69 unmanned level crossings in the division had been eliminated either by manning them or providing limited use subways or diversion.
Thirty nine unmanned level crossings had been manned and 30 others closed by providing limited use subway or diversion. The division had maintained better safety record in 2016-17, the official said.
Exhorting railway employees to further improve their record, he said punctuality performance of the division was 97.5% during 2016-17 as compared to 93.3% in the previous fiscal.
Further, 100% punctuality was achieved on 176 days in 2016-17.
The originating passenger earnings of the division clocked an increase of 5.08 per cent in 2016-17 over the previous financial year.
The second railway line laid in the stretch between Valadi and Ponmalai as part of Villupuram-Dindigul doubling project was expected to be commissioned next month, he said.
Highlighting the performance in passenger amenities front, he said booking of retiring rooms through online facility had been commissioned at Puducherry, Villupuram, Nagapattinam, Kumbakonam and Srirangam. Emergency medical care centres were opened at Thanjavur, Kumbakonam, Mayiladuthurai, Tiruvarur and Nagapattinam railway stations.
As part of energy conservation measures, energy efficient LED lamps had been installed at various places.
The Tiruchi Division had bagged the overall efficiency shield in the Southern Railway zone, he said and complimented the officers and staff for the feat.
The Operating, Commercial, Accounts, Medical and Safety departments of the Division had bagged efficiency shields during 2016-17.
A total of 660 employees at the divisional level were awarded at the celebration that was attended by officers and staff.
Apr 14 2017 (07:45)  5 more railway stations jump on the Wi-Fi bandwagon (www.thehindu.com)
back to top
New Facilities/TechnologySR/Southern  -  

News Entry# 299553     
   Tags   Past Edits
Apr 14 2017 (07:45)
Station Tag: Puducherry (Pondicherry)/PDY added by rdb*^/69261

Apr 14 2017 (07:45)
Station Tag: Villupuram Junction/VM added by rdb*^/69261

Apr 14 2017 (07:45)
Station Tag: Mayiladuturai Junction/MV added by rdb*^/69261

Apr 14 2017 (07:45)
Station Tag: Kumbakonam/KMU added by rdb*^/69261

Apr 14 2017 (07:45)
Station Tag: Thanjavur Junction/TJ added by rdb*^/69261

Posted by: rdb*^  130121 news posts
Thanjavur, Kumbakonam, Mayiladuthurai, Puducherry, Villupuram get the facility
Southern Railway has decided to expand Wi-Fi facility to more railway stations falling within the Tiruchi Railway Division as part of the Digital India initiative.
Plans are afoot to provide Wi-Fi broadband facility at Thanjavur, Kumbakonam, Mayiladuthurai, Puducherry and Villupuram railway stations in the coming year, Divisional Railway Manager A.K. Agarwal said on Thursday.
Addressing the
...
more...
62nd Railway Week celebrations here, he said that Tiruchi Division had done exceedingly well in maintaining cleanliness at railway stations and on trains. Facilities required by the travelling public had been accorded maximum priority in all planning exercises, be it new reservation facilities or new services. Tiruchi essentially being a passenger-oriented division had carried 3.66 crore passengers during the 2016-17 financial year.
As part of railway safety measures, 69 unmanned level crossings in the division had been eliminated either by manning them or providing limited use subways or diversion.
Thirty nine unmanned level crossings had been manned and 30 others closed by providing limited use subway or diversion. The division had maintained better safety record in 2016-17, the official said.
Exhorting railway employees to further improve their record, he said punctuality performance of the division was 97.5% during 2016-17 as compared to 93.3% in the previous fiscal.
Further, 100% punctuality was achieved on 176 days in 2016-17.
The originating passenger earnings of the division clocked an increase of 5.08 per cent in 2016-17 over the previous financial year.
The second railway line laid in the stretch between Valadi and Ponmalai as part of Villupuram-Dindigul doubling project was expected to be commissioned next month, he said.
Highlighting the performance in passenger amenities front, he said booking of retiring rooms through online facility had been commissioned at Puducherry, Villupuram, Nagapattinam, Kumbakonam and Srirangam. Emergency medical care centres were opened at Thanjavur, Kumbakonam, Mayiladuthurai, Tiruvarur and Nagapattinam railway stations.
As part of energy conservation measures, energy efficient LED lamps had been installed at various places.
The Tiruchi Division had bagged the overall efficiency shield in the Southern Railway zone, he said and complimented the officers and staff for the feat.
The Operating, Commercial, Accounts, Medical and Safety departments of the Division had bagged efficiency shields during 2016-17.
A total of 660 employees at the divisional level were awarded at the celebration that was attended by officers and staff.
SPECIAL CORRESPONDENT
Page#    Showing 1 to 20 of 24 News Items  next>>

Scroll to Top
Scroll to Bottom


Go to Desktop site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.