Full Site Search  
Thu Feb 23, 2017 21:36:13 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search

SRE/Saharanpur Junction (6 PFs)
سہارنپور جنکشن     सहारनपुर जंक्शन

Track: Double Electric-Line

Type of Station: Junction
Number of Platforms: 6
Number of Halting Trains: 134
Number of Originating Trains: 16
Number of Terminating Trains: 17
JN Point Ambala/Delhi/Moradabad/,Lakdi Ka Pul, Saharanpur
State: Uttar Pradesh
Elevation: 278 m above sea level
Zone: NR/Northern
Division: Ambala
4 Travel Tips
No Recent News for SRE/Saharanpur Junction
Nearby Stations in the News

Rating: 3.9/5 (67 votes)
cleanliness - average (9)
porters/escalators - good (8)
food - good (9)
transportation - excellent (8)
lodging - good (7)
railfanning - excellent (9)
sightseeing - good (9)
safety - good (8)

Nearby Stations

KWT/Khanalampura Wt 1 km     TPZ/Tapri Junction 7 km     PKY/Pilkhani 8 km     BAE/Baliakheri 10 km     SSW/Sarsawa 13 km     SNKE/Sunehti Kharkhari 15 km     NGL/Nangal 17 km     MNZ/Manani 18 km     CDL/Chodiala 21 km     BNQL/Bhankala Halt 22 km    

Station News

Page#    Showing 1 to 20 of 89 News Items  next>>
Nov 26 2016 (22:05)  सोते रहे जीएम नार्दन रेलवे, टूटी पटरी से गुजरी ट्रेन (epaper.jagran.com)
back to top
Crime/AccidentsNR/Northern  -  

News Entry# 286880     
   Tags   Past Edits
Nov 26 2016 (10:05PM)
Station Tag: New Delhi/NDLS added by ☆अलविदा गोंडा मीटरगेज■☆*^~/206964

Nov 26 2016 (10:05PM)
Station Tag: Kanpur Central/CNB added by ☆अलविदा गोंडा मीटरगेज■☆*^~/206964

Nov 26 2016 (10:05PM)
Station Tag: Saharanpur Junction/SRE added by ☆अलविदा गोंडा मीटरगेज■☆*^~/206964

Posted by: ☆अलविदा गोंडा मीटरगेज■☆*^~  4996 news posts
जागरण संवाददाता, सहारनपुर :कानपुर रेल हादसा होने के बाद भी अधिकारी सजग नजर नहीं आ रहे हैं। शुक्रवार को सहारनपुर पहुंचे नार्दन रेलवे महाप्रबंधक एके पूठिया विशेष रेल के कोच में सोते रहे। इसी दौरान प्लेटफार्म नंबर 3 स्थित रेल पटरी टूट जाने से रेल अधिकारियों में हड़कंप मचा रहा। बताया जा रहा है कि इस पटरी पर एक एक्सप्रेस रेल भी गुजर गई। आनन-फानन में पटरी को ठीक कराया गया।1नार्दर्न रेलवे महाप्रबंधक को शुक्रवार को दिल्ली से सहारनपुर के अलावा जगाधरी वर्कशॉप और कालका तक रेल लाइनों व व्यवस्थाओं का निरीक्षण करने जाना था। पूठिया अपनी विशेष रेल से सुबह चार बजे प्लेटफार्म 7 गुड्स लाइन पर पहुंचे। बताया गया कि स्थानीय अधिकारियों ने जीएम का स्वागत व मुलाकात करने का प्रयास किया, लेकिन सुरक्षाकर्मियों व अधिकारियों ने सोने की बात कहकर मिलने नहीं दिया। महाप्रबंधक की विशेष रेल सुबह करीब 8 बजे तक प्लेटफार्म पर खड़ी रही और बाद...
more...
में रवाना हुई। 1इसी दौरान सुबह 7.20 बजे के करीब प्लेटफार्म नंबर-3 स्थित रेल पटरी टूट गई। बताया गया है कि टूटी रेल पटरी से कुछ देर पूर्व ही एक एक्सप्रेस को निकाला गया था। पटरी टूटने पर रेल अधिकारियो ने तत्काल अंबाला से दिल्ली जा रही इंटरसिटी एक्सप्रेस को प्लेटफार्म पर-4 पर रोका और टेक्निकल स्टाफ ने जोड़ लगाकर पटरी को संचालन हेतु तैयार किया। इस कार्य में करीब पौन घंटा लगा।1 इस दौरान इंटरसिटी एक्सप्रेस को रोके रखा गया। रेल अधिकारी मामले को दबाने में लगे रहे। 1जागरण संवाददाता, सहारनपुर :कानपुर रेल हादसा होने के बाद भी अधिकारी सजग नजर नहीं आ रहे हैं। शुक्रवार को सहारनपुर पहुंचे नार्दन रेलवे महाप्रबंधक एके पूठिया विशेष रेल के कोच में सोते रहे। इसी दौरान प्लेटफार्म नंबर 3 स्थित रेल पटरी टूट जाने से रेल अधिकारियों में हड़कंप मचा रहा। बताया जा रहा है कि इस पटरी पर एक एक्सप्रेस रेल भी गुजर गई। आनन-फानन में पटरी को ठीक कराया गया।1नार्दर्न रेलवे महाप्रबंधक को शुक्रवार को दिल्ली से सहारनपुर के अलावा जगाधरी वर्कशॉप और कालका तक रेल लाइनों व व्यवस्थाओं का निरीक्षण करने जाना था। पूठिया अपनी विशेष रेल से सुबह चार बजे प्लेटफार्म 7 गुड्स लाइन पर पहुंचे। बताया गया कि स्थानीय अधिकारियों ने जीएम का स्वागत व मुलाकात करने का प्रयास किया, लेकिन सुरक्षाकर्मियों व अधिकारियों ने सोने की बात कहकर मिलने नहीं दिया। महाप्रबंधक की विशेष रेल सुबह करीब 8 बजे तक प्लेटफार्म पर खड़ी रही और बाद में रवाना हुई। 1इसी दौरान सुबह 7.20 बजे के करीब प्लेटफार्म नंबर-3 स्थित रेल पटरी टूट गई। बताया गया है कि टूटी रेल पटरी से कुछ देर पूर्व ही एक एक्सप्रेस को निकाला गया था। पटरी टूटने पर रेल अधिकारियो ने तत्काल अंबाला से दिल्ली जा रही इंटरसिटी एक्सप्रेस को प्लेटफार्म पर-4 पर रोका और टेक्निकल स्टाफ ने जोड़ लगाकर पटरी को संचालन हेतु तैयार किया। इस कार्य में करीब पौन घंटा लगा।1 इस दौरान इंटरसिटी एक्सप्रेस को रोके रखा गया। रेल अधिकारी मामले को दबाने में लगे रहे।
Nov 05 2016 (07:38)  टेन में सीट नहीं देने पर युवक की गोली मार कर हत्या (epaper.jagran.com)
back to top
Commentary/Human InterestNR/Northern  -  

News Entry# 284822   Blog Entry# 2048887     
   Tags   Past Edits
Nov 05 2016 (7:38AM)
Station Tag: Saharanpur Junction/SRE added by Pp*^~/36064

Nov 05 2016 (7:38AM)
Station Tag: Old Delhi Junction/DLI added by Pp*^~/36064

Posted by: Pp*^~  5969 news posts
दिल्ली से सहारनपुर जा रही जनता एक्सप्रेस ट्रेन में दो युवकों ने सीट नहीं देने पर एक यात्री की गोली मारकर हत्या कर दी। फायरिंग से ट्रेन के डिब्बे में मची अफरातफरी से 13 यात्री घायल हो गए। जीआरपी ने आठ युवकों को हिरासत में लिया है, जिनमें से ज्यादातर युवक अहैड़ा और अग्रवाल मंडी टटीरी के हैं।1शुक्रवार शाम शामली जिले के मालैंडी गांव निवासी अश्वनी शर्मा (30) पुत्र जनेश्वर दत्त शर्मा शाहदरा रेलवे स्टेशन से सहारनपुर जा रही 4545 जनता एक्सप्रेस ट्रेन में सवार हुआ था। प्रत्यक्षदर्शियों के मुताबिक, बेहटा हाजीपुर रेलवे हाल्ट पर आधा दर्जन युवकों का ग्रुप डिब्बे में चढ़ा। उनमें से दो युवकों ने सीट न छोड़ने पर अश्विनी को बुरी तरह पीटा। बावजूद इसके, अश्वनी ने सीट नहीं छोड़ी। इसी बीच एक युवक ने फोन कर अहैड़ा रेलवे हाल्ट पर किसी को हथियार लाने के लिए कहा। ट्रेन जब अहैड़ा पहुंची तो वहां पहले से मौजूद...
more...
दो युवकों ने ट्रेन के अंदर खड़े युवकों को तमंचा पकड़ा दिया। एक युवक ने तमंचे से अश्वनी को गोली मार दी और आरोपी युवक चलती ट्रेन से कूदकर फरार हो गए। बड़ौत रेलवे स्टेशन पर अश्विनी का शव उतारा गया। परिजन भी पहुंच गए। इस घटना के बाद एक बार फिर ट्रेन में सुरक्षा व्यवस्था के रेलवे के दावों की पोल खुल गई है। राजकीय पुलिस सीओ हरी प्रकाश कसाना का कहना है कि जल्द से जल्द आरोपियों को गिरफ्तार किया जाएगा।

2033 views
Nov 05 2016 (10:55)
Trip to Nani Ghar aka Barauni^~   30222 blog posts   22623 correct pred (75% accurate)
Re# 2048887-1            Tags   Past Edits
Asss aess log b h desh me jo train ki seat k ly aese harkat krte h, itna garam khun h to border pe jakar dikhate garmi

1998 views
Nov 05 2016 (11:03)
Together we achieve more   1925 blog posts   4 correct pred (66% accurate)
Re# 2048887-2            Tags   Past Edits
These pigs are the real menace to the country. They show their masculinity when in group else they are eunuchs.
Sep 26 2016 (07:31)  तेजस जैसी ट्रेनें चलाने में लग जाएंगे दस साल (www.amarujala.com)
back to top
NR/Northern  -  

News Entry# 281238   Blog Entry# 2002315     
   Tags   Past Edits
Sep 26 2016 (7:31AM)
Station Tag: Anand Vihar Terminal/ANVT added by Subhash/746156

Sep 26 2016 (7:31AM)
Station Tag: Lucknow Charbagh NR/LKO added by Subhash/746156

Sep 26 2016 (7:31AM)
Station Tag: Ghaziabad Junction/GZB added by Subhash/746156

Sep 26 2016 (7:31AM)
Station Tag: Jammu Tawi/JAT added by Subhash/746156

Sep 26 2016 (7:31AM)
Station Tag: Saharanpur Junction/SRE added by Subhash/746156

Sep 26 2016 (7:31AM)
Station Tag: New Delhi/NDLS added by Subhash/746156

Sep 26 2016 (7:31AM)
Station Tag: Moradabad Junction/MB added by Subhash/746156

Posted by: Subhash  1008 news posts
ट्रेनों की रफ्तार बढ़ाने के मामले में मंडल फिसड्डी साबित हो रहा है। दूसरे मंडलाें में ट्रेनों की रफ्तार लगातार बढ़ रही है वहीं मंडल अभी भी रफ्तार 100 के पार नहीं जा पाई है। वहीं मंडल में ट्रैक की स्थिति को देखते हुए मंडल के ट्रैक पर स्पीड बढ़ा पाना दूर की कौड़ी साबित हो रहा है।
भारत की सबसे तेज ट्रेनों को चलाने के लिए रूट का चयन कर लिया गया है, लेकिन इसमें मुरादाबाद होते हुए एक भी ट्रेन शामिल नहीं है। जबकि दिल्ली वाया मुरादाबाद होते हुए हावड़ा तक का रूट महत्वपूर्ण रूट है।
जम्मू
...
more...
से हावड़ा तक ट्रेन सहारनपुर होते हुए मुरादाबाद होकर गुजरती हैं तो कई गाड़ियां दिल्ली से मुरादाबाद होकर गुजारी जाती है। जम्मे से हावड़ा के बीच मुरादाबाद मंडल बेहद महत्वपूर्ण है। लेकिन अभी भी मंडल में ट्रेनों की रफ्तार चिंता का विषय बनी हुई है।
जहां एक ओर हर मंडल में ट्रेनों की रफ्तार बढ़ने लगी है। यहां तक कि हजरत निजामुद्दीन से आगरा तक 150 किमी प्रति घंटा की रफ्तार से ट्रेन दौड़ रही हैं। वहीं अपने मंडल में अभी 100 की रफ्तार भी सुरक्षित नहीं मानी जा रही। गाजियाबाद से मुरादाबाद तक ट्रेनाें को अधिकतम 110 किमी प्रति घंटा की रफ्तार से चलाया जा सकता है।
जबकि मुरादाबाद से लखनऊ के बीच अधिकतम स्पीड 100 किमी प्रति घंटा की है। इसे 110 किमी तक लाने के लिए 2017 तक का समय दिया गया है। जबकि 120 की स्पीड करने के लिए 2019 तक का टारगेट निर्धारित किया गया है।
कारण मंडल में ट्रैक की स्थिति बेहद खराब है। आनंद विहार से लखनऊ तक तेजस ट्रेन चलाने की स्वीकृति मिल गई है। इसे आनंद विहार, अलीगढ़ कानपुर होते हुए चलाया जाएगा। बताया जा रहा है कि रूट की खराब स्थिति के कारण इस रूट को तेजस के लिए नहीं चुना गया।

2 posts - Mon Sep 26, 2016 - are hidden. Click to open.

4231 views
Sep 26 2016 (08:18)
Splendid Sapt Kranti Express   1189 blog posts   725 correct pred (74% accurate)
Re# 2002315-3            Tags   Past Edits
aur har baar ke TAAG ke tarah iss baar bhi iss section mein trains slow ki jaayengi in TAAG 2016-17.
like FD-DLI Express

4240 views
Sep 26 2016 (08:19)
Splendid Sapt Kranti Express   1189 blog posts   725 correct pred (74% accurate)
Re# 2002315-4            Tags   Past Edits
अधिकारियों की अकर्मान्यता 100% true.

4259 views
Sep 26 2016 (08:20)
Splendid Sapt Kranti Express   1189 blog posts   725 correct pred (74% accurate)
Re# 2002315-5            Tags   Past Edits
यहां तक कि हजरत निजामुद्दीन से आगरा तक 150 किमी प्रति घंटा की रफ्तार से ट्रेन दौड़ रही हैं
This is 160KMPH not 150KMPH.
Baaki first time Amar Ujala ne baut sahi bakhiya udhedi hai Moradabad mandal ki.

Sep 26 2016 (08:32)
Smabbas2008   162 blog posts   9 correct pred (69% accurate)
Re# 2002315-6            Tags   Past Edits
Suhaildev 22420 slowed by 23min between anvt and MB

4166 views
Sep 26 2016 (11:49)
MB DIVISION NEEDS 150 d~   223 blog posts
Re# 2002315-7            Tags   Past Edits
gzb se lko via mb tak poora track badal dena chahie... huh
itni importance hone k baad bhi
response ni milta mb division ko
gzb se lko via mb track ki halat ko dekha jae aur iske speedup krne k baare mein socha jae
toh
...
more...
ek hi baat aati h poora track hi badal do
sach bahot buri halat h
speedup krna bahot mushkil h kyunki track hi speed up ki halat mein ni h
issy bdia new track daal do 😅😅 😁

4206 views
Sep 26 2016 (12:03)
Splendid Sapt Kranti Express   1189 blog posts   725 correct pred (74% accurate)
Re# 2002315-8            Tags   Past Edits
MB-GZB ke bich electrification hone ke kuchh dino tak achha performance diya tha, uske baad phir wahi halat ho gayi hai.
har train GZB se nikal ke Pilkhua/Hapur tak paryaapt late ho jaati hai ki aage cover nahi karti.
yahi cheez Saharanpur se Roorkee tak hoti hai.
yahi cheez MB se Rampur ke bich bhi hoti hai.
aur
...
more...
MB ko PF par trains apne nirdharit samay se jyaada khadi rakhne ki problem hai. Yeh cheez maine aksar dekhi hai. jab jyada der khadi rakhoge to platform kaha se free milega pichhe aani wali trains ko.
.
I am not sure, if this is due to the freight running ahead or due to PSR/TSR.

4144 views
Sep 26 2016 (12:13)
Abhishek Jaiswal   44807 blog posts   18341 correct pred (69% accurate)
Re# 2002315-9            Tags   Past Edits
so as mahamana exp.

4298 views
Sep 26 2016 (13:05)
GZB WAP7 30211 WITH GD sf AT GORAKHPUR JN~   5151 blog posts   10 correct pred (50% accurate)
Re# 2002315-10            Tags   Past Edits
itna asan nahi tracks to pora badal pana.....................

3936 views
Sep 26 2016 (13:13)
©The Dark Lord™~   4926 blog posts
Re# 2002315-11            Tags   Past Edits
Wahi to or kuch members jeed karte hai ki LKO-MB pe Tejus chalni chahiye!! Saptkranti jub 100 pe LKO-MB k beech chalti hai to train kapti hai. LKO-MB ko 130 capable banana jald se jald bahoot jaruri hai tabhi ye LKO-CNB-NDLS k alternative ko roop me ubhar payegi.

3904 views
Sep 26 2016 (14:39)
MB DIVISION NEEDS 150 d~   223 blog posts
Re# 2002315-12            Tags   Past Edits
Sab Log RM KO EK EK KRKE TWEET KREY
MB DIVISION K SPEED UP K LIYE
SHYD KOI ACTION LE LIYA JAE
Sep 14 2016 (04:04)  200 किमी के ट्रैक पर क्रेक ही क्रेक (www.amarujala.com)
back to top
NR/Northern  -  

News Entry# 279985     
   Tags   Past Edits
Sep 14 2016 (4:04AM)
Station Tag: Saharanpur Junction/SRE added by Subhash/746156

Sep 14 2016 (4:04AM)
Station Tag: Lucknow Charbagh NR/LKO added by Subhash/746156

Sep 14 2016 (4:04AM)
Station Tag: New Delhi/NDLS added by Subhash/746156

Sep 14 2016 (4:04AM)
Station Tag: Moradabad Junction/MB added by Subhash/746156

Posted by: Subhash  1008 news posts
रेलवे के सफर को सुरक्षित बनाने के लिए ट्रैक की सेहत पर विशेष रूप से ध्यान दिया जा रहा है। इसके लिए उसकी हर स्तर पर जांच कराकर बीमारियों को दूर करने पर काम हो रहा है। ट्रैक में कोई भी खामी छिपी न रह जाए और उसके चलते दुर्घटना हो उससे पहले गहनता से जांच के लिए अल्ट्रासोनिक ट्रैक फ्लो डिटेक्टर मशीन से अल्ट्रासाउंड कर रहे हैं। अल्ट्रासाउंड में मंडल का करीब दो किमी का एरिया बीमार निकला है। रेलवे बोर्ड के निर्देश पर ट्रैक मेंटीनैंस पखवाड़ा चलाया जा रहा है।
ट्रैक ट्रेन संचालन का सबसे महत्वपूर्ण हिस्सा है। ट्रैक में छोटी से खराबी सैकड़ों यात्रियों की जान खतरे में डाल सकती है। ट्रैक दुरुस्त करने के लिए
...
more...
उसकी जांच भी बेहद जरूरी है। पुराने सिस्टम के अनुसार गैंगमैन और ट्रैकमैन लगातार पटरियों की निगरानी करते हैं।
प्रतिदिन एक निर्धारित एरिया में वे पेट्रोलिंग कर उसकी खामियों को दूर करते हैं। लेकिन यह सब बाहर से दिखाई देने वाली कमी को दूर कर पाते हैं। ट्र्रैक के अंदर की कमी को दूर कर पाना बेहद मुश्किल है। ऐेसे में तकनीकी का भी प्रयोग बढ़ा है। जिसके तहत ट्रैक के अंदर किसी प्रकार फ्रैक्चर, गलन या लोहे की संगठनात्मक स्थिति में खराबी का पता करने के लिए अल्ट्रासोनिक ट्रैक फ्लो डिटेक्टर मशीन लगाई जाती है।
जो ट्रैक का अल्ट्रासाउंड कर उसके अंदर की खामी को निकालती है। इस मशीन से किए गए सर्वे में मंडल की दिल्ली लखनऊ, सहारनपुर लखनऊ लाइन के अलावा सभी ब्रांच लाइनों में करीब 200 किमी का एरिया में खराबी है। इसमें कई जगह ट्रैक को बदलने की जरूरत है तो कहीं कही खराब हिस्से को काटकर दूसरा लगाया जा सकता है। जर्जर होने के कारण वहां से ट्रेनों कासन पर गुजारा जा रहा है। वहीं अधिकारियों ने इसके लिए शार्ट और लांग टर्म दो प्लान बनाए हैं। लांग टर्म में जिसमें निश्चित हिस्से का ट्रैक बदलना और शार्ट टर्म में सुधार करना।
जगह जगह ट्रैक को चैक कराया जा रहा है। इसमें सभी अधिकारी लगाए गए हैं। आधुनिक मशीनाें का भी सहारा लिया जा रहा है। कई ट्रैक में खामियां मिली हैं। जिन्हें पहचानकर उन्हें ठीक कराने की प्लानिंग बना ली गई है और काम शुरू कर दिया गया है।
प्रमोद कुमार, डीआरएम
कैसे काम करती है मशीन
मुरादाबाद। मशीन पहिए के सहारे ट्रैक पर चलाई जाती है। उससे निकलने वाली अल्ट्रासोनिक किरणों से ट्रैक के अंदर की स्थिति मशीन में लगे डिस्प्ले पर दिखाई देती है। साथ ही एक ग्राफ बनता जाता है। उससे में होने वाले उतार चढ़ाव से ट्रैक की स्थिति का पता लगता है। खराबी मिलने पर उस स्थान पर लाल निशान लगा देते हैं। इसके बाद सूचना जारी कर दी जाती है। उसे बदलने या फिर ठीक करने के लिए होता है।
अलग अलग स्टेशनों को हुई आवंटित
मुरादाबाद 2
बरेली 2
शाहजहांपुर 2
रुड़की 1
हरिद्वार 2
मुरादाबाद से बरेली के बीच
बरेली से शाहजहांपुर के बीच
सीतापुर लाइन
Aug 22 2016 (22:29)  Diversion and termination (m.hindustantimes.com)
back to top
Other News

News Entry# 277870     
   Tags   Past Edits
Aug 22 2016 (10:29PM)
Station Tag: Ambala Cantt. Junction/UMB added by AryanKapoor JUD/945861

Aug 22 2016 (10:29PM)
Station Tag: Moradabad Junction/MB added by AryanKapoor JUD/945861

Aug 22 2016 (10:29PM)
Station Tag: Moradabad Junction/MB added by AryanKapoor JUD/945861

Aug 22 2016 (10:29PM)
Station Tag: Panipat Junction/PNP added by AryanKapoor JUD/945861

Aug 22 2016 (10:29PM)
Station Tag: Saharanpur Junction/SRE added by AryanKapoor JUD/945861

Aug 22 2016 (10:29PM)
Station Tag: Muzaffarnagar/MOZ added by AryanKapoor JUD/945861

Aug 22 2016 (10:29PM)
Station Tag: Yamunanagar-Jagadhri/YJUD added by AryanKapoor JUD/945861

Aug 22 2016 (10:29PM)
Train Tag: JammuTawi - Kanpur (Barfaani) SF Express/12470 added by AryanKapoor JUD/945861

Aug 22 2016 (10:29PM)
Train Tag: Kanpur - JammuTawi (Barfaani) SF Express/12469 added by AryanKapoor JUD/945861

Aug 22 2016 (10:29PM)
Train Tag: Archana SF Express/12356 added by AryanKapoor JUD/945861

Aug 22 2016 (10:29PM)
Train Tag: Archana SF Express/12355 added by AryanKapoor JUD/945861

Aug 22 2016 (10:29PM)
Train Tag: Jan Nayak Express/15212 added by AryanKapoor JUD/945861

Aug 22 2016 (10:29PM)
Train Tag: Jan Nayak Express/15211 added by AryanKapoor JUD/945861

Posted by: AryanKapoor JUD  5 news posts
Several Ambala trains to be diverted for 36 days owing to work at Saharanpur
HT Correspondent, Hindustan Times, Ludhiana| Updated: Aug 18, 2016 11:12 IST
Trains going to Jammu and coming from Ambala are among those affected.(Livemint representative image)
The construction of a washable apron at platform 4 of the Saharanpur railway station will require several trains to be diverted for 36 days from
...
more...
August 16 to September 20, while one train has been cancelled.
Trains going to Jammu and coming from Ambala are among those affected. The 51907/ 51908 Shamli Saharanpur Passenger is the one cancelled for the period. The Muradabad-Saharanpur 64565/ 64566 will terminate at Rurki.
The Delhi-Ambala Cantt (64561) train will halt for 70 minutes in Delhi, while the Ambala Meerut City Passenger (54542) and Ambala-Hazrat Nizamuddin Passenger (54540) will be stop for 40 minutes in Ambala.
The Delhi-Saharanpur Express will terminate at Muzaffarpur. The Ambala Cantt-Saharanpur, Saharpur-Nagaldam, and Saharanpur-Ambala Cantt trains will terminate at Yamunanagar Jagadhri.
The Darbhanga-Amritsar Jannayak Express, Rajendra Nagar-Jammu Tawi Archna Express, Kanpur Junction-Jammu Tawi Express and Barauni-Jammu Tawi Express will follow the route connecting Muradabad, Ghaziabad, Delhi, Panipat, Ambala and back for these 36 days.
Gurbachan Singh, councillor from the same ward, faced public wrath when he went to hear grievances of the people, who are facing problems due to accumulation of sewerage water in their respective areas.
The civic body had failed to take notice of sewerage overflow problem in the area from past one week. The police have registered case against the accused Aatma Singh, his son Jashan and three unidentified persons.
Aug 19 2016 (15:01)  अमृतसर-दरभंगा एक्सप्रेस समेत कई ट्रेन बदले रुट से चलेंगी (www.google.co.in)
back to top
Other NewsNR/Northern  -  

News Entry# 277633     
   Tags   Past Edits
This is a new feature showing past edits to this News Post.

Posted by: Yash^~  45 news posts
सहारनपुर रेलवे स्टेशन के प्लेटफॉर्म नंबर चार एवं पांच पर वाशेवल एप्रेन बदलने के लिये 16 अगस्त से 25 सितंबर एवं 8 नवम्बर से 16 दिसम्बर, तक 36 ट्रेनों का ब्लॉक रहेगा। इस दौरान कई ट्रेन बदले रुट से चलेंगी।
Aug 12 2016 (22:22)  New Train Haridwar Jammu Tawi 14605/06 (wap.business-standard.com)
back to top
New/Special TrainsNR/Northern  -  

News Entry# 277027   Blog Entry# 1963328     
   Tags   Past Edits
Aug 12 2016 (10:22PM)
Station Tag: Haridwar/HW added by AryanKapoor JUD/945861

Aug 12 2016 (10:22PM)
Station Tag: Saharanpur Junction/SRE added by AryanKapoor JUD/945861

Aug 12 2016 (10:22PM)
Station Tag: Ambala City/UBC added by AryanKapoor JUD/945861

Aug 12 2016 (10:22PM)
Station Tag: Khanna/KNN added by AryanKapoor JUD/945861

Aug 12 2016 (10:22PM)
Station Tag: Ambala City/UBC added by AryanKapoor JUD/945861

Aug 12 2016 (10:22PM)
Station Tag: Yamunanagar-Jagadhri/JUD added by AryanKapoor JUD/945861

Aug 12 2016 (10:22PM)
Station Tag: Yamunanagar-Jagadhri/YJUD added by AryanKapoor JUD/945861

Aug 12 2016 (10:22PM)
Station Tag: Rajpura Junction/RPJ added by AryanKapoor JUD/945861

Aug 12 2016 (10:22PM)
Station Tag: Sirhind Junction/SIR added by AryanKapoor JUD/945861

Aug 12 2016 (10:22PM)
Station Tag: Ludhiana Junction/LDH added by AryanKapoor JUD/945861

Aug 12 2016 (10:22PM)
Station Tag: Ambala Cantt. Junction/UMB added by AryanKapoor JUD/945861

Aug 12 2016 (10:22PM)
Station Tag: Jalandhar Cantt. Junction/JRC added by AryanKapoor JUD/945861

Aug 12 2016 (10:22PM)
Station Tag: Pathankot Cantt/PTKC added by AryanKapoor JUD/945861

Aug 12 2016 (10:22PM)
Station Tag: Jammu Tawi/JAT added by AryanKapoor JUD/945861

Aug 12 2016 (10:22PM)
Train Tag: Jammu Tawi- Haridwar Express/14606 added by AryanKapoor JUD/945861

Aug 12 2016 (10:22PM)
Train Tag: Haridwar- Jammu Tawi Express/14605 added by AryanKapoor JUD/945861

Posted by: AryanKapoor JUD  5 news posts
Jammu-Haridwar weekly Exp from Aug 15
For the convenience of rail passengers, Railways will be introducing two express train service between Jammu and Haridwar
The Haridwar - Jammu Tawi Weekly Express will depart from Haridwar at 5.10 PM on every Monday to reach Jammu at 4 AM the next day from August 15 while in the return direction, the Jammu - Haridwar Weekly Express will depart from Jammu at 10.10 PM on every Sunday from August 21 to reach Haridwar at 10.25 AM the next day, according to a release.
Consisting
...
more...
of one AC 2 Tier, three AC 3 Tier, nine sleeper class, five General Class and two second class cum luggage van coaches, the Jammu - Haridwar - Jammu Weekly Express train will stop at Pathankot, Jalandhar, Ludhiana, Khanna, Sirhind, Rajpura, Ambala City, Jagadhari and Saharanpur stations enroute in both the directions.

6402 views
Aug 15 2016 (12:59)
AryanKapoor JUD   576 blog posts
Re# 1963328-1            Tags   Past Edits
Ambala Cant also

6432 views
Aug 15 2016 (13:13)
Trip to Nani Ghar aka Barauni^~   30222 blog posts   22623 correct pred (75% accurate)
Re# 1963328-2            Tags   Past Edits
Hemkunt me b ek sl coach aur add krde to badhiya h
Aug 09 2016 (16:43)  Raipur: Changed chhattisgarh express route due to mega block-छत्तीसगढ़ एक्सप्रेस में करने वाले हैं यात्रा, तो ये खबर जरूर पढ़ें - Patrika News (www.patrika.com)
back to top
Major Accidents/DisruptionsSECR/South East Central  -  

News Entry# 276547     
   Tags   Past Edits
Aug 09 2016 (4:43PM)
Station Tag: Saharanpur Junction/SRE added by For Better Managed Indian Railways~/1546020

Aug 09 2016 (4:43PM)
Station Tag: Old Delhi Junction/DLI added by For Better Managed Indian Railways~/1546020

Aug 09 2016 (4:43PM)
Station Tag: Raipur Junction/R added by For Better Managed Indian Railways~/1546020

Posted by: For Better Managed Indian Railways~  948 news posts
रायपुर. उत्तर रेलवे के दिल्ली-गाजियाबाद-मेरठ सिटी-सहारनपुर सेक्शन में 8, 10, 11 अगस्त को रात 10.10 बजे से दिनांक 9,11,12 अगस्त को रात 1.10 बजे तक तीन घंटे का मेगा पॉवर एंड ट्रैफिक ब्लॉक के कारण गाड़ी संख्या 18237 बिलासपुर-अमृतसर छत्तीसगढ़ एक्सप्रेस को मार्ग बदल कर चलाया जा रहा है। यह गाड़ी गाजियाबाद-मेरठ सिटी-सहारनपुर की बजाय परिवर्तित मार्ग निजामुद्दीन-तिलक ब्रिज-शामली से होकर अपने गंतव्य तक पहुंचेगी।
Jul 28 2016 (10:49)  सहारनपुर पैसेंजर सहित कई ट्रेनें निरस्त (epaper.jagran.com)
back to top
IR AffairsNR/Northern  -  

News Entry# 275126   Blog Entry# 1943927     
   Tags   Past Edits
Jul 28 2016 (10:49AM)
Station Tag: Moradabad Junction/MB added by ☆अलविदा गोंडा मीटरगेज■☆*^~/206964

Jul 28 2016 (10:49AM)
Station Tag: Saharanpur Junction/SRE added by ☆अलविदा गोंडा मीटरगेज■☆*^~/206964

Jul 28 2016 (10:49AM)
Station Tag: Sarahula Halt/SAHA added by ☆अलविदा गोंडा मीटरगेज■☆*^~/206964

Jul 28 2016 (10:49AM)
Station Tag: Lucknow Charbagh NR/LKO added by ☆अलविदा गोंडा मीटरगेज■☆*^~/206964

Posted by: ☆अलविदा गोंडा मीटरगेज■☆*^~  4996 news posts
जासं, लखनऊ : मुरादाबाद रेल मंडल प्रशासन ने ट्रेनों के अधिक दबाव के कारण सहारनपुर पैसेंजर सहित कई ट्रेनों को निरस्त कर दिया है। कुछ ट्रेनों को सप्ताह में दो दिन शनिवार व रविवार को निरस्त किया गया है जबकि कई ट्रेनें अगले आदेश तक लगातार निरस्त रहेंगी। 1टेन नंबर 54251/52 लखनऊ-सहारनपुर पैसेंजर अगले आदेश तक निरस्त कर दी गई है। ट्रेन 54377/78 बरेली-इलाहाबाद पैसेंजर 28 जुलाई से अगले आदेश तक रद रहेगी। जबकि 64221/22 लखनऊ-शाहजहांपुर मेमू ट्रेन भी आगामी कई दिनों तक लगातार निरस्त रहेगी। ट्रेन 54331/32 लखनऊ-बालामऊ पैसेंजर 30 जुलाई से प्रत्येक शनिवार और रविवार को निरस्त रहेगी। ट्रेन 54201 लखनऊ-रहीमाबाद पैसेंजर का संचालन भी 30 जुलाई से अगले आदेश तक निरस्त रहेगा।1आसपास भी पड़ेगा प्रभाव1ट्रेन 54325 सीतापुर कैंट-बालामऊ-उन्नाव पैसेंजर को भी आगामी आदेशों तक निरस्त कर दिया गया है। ट्रेन 54326 उन्नाव-बालामऊ-सीतापुर कैंट पैसेंजर का संचालन 28 जुलाई से निरस्त रहेगा।

5015 views
Jul 28 2016 (11:30)
DhnEcr~   4475 blog posts
Re# 1943927-1            Tags   Past Edits
मुरादाबाद रेल मंडल प्रशासन ने ट्रेनों के अधिक दबाव के कारण
Really with less than 50% of what cnb route ye itni crowded already.

5119 views
Jul 28 2016 (12:17)
Twesh Rajput   5428 blog posts   5032 correct pred (85% accurate)
Re# 1943927-2            Tags   Past Edits
lko-mb-ndls is completely manual signal..while cnb-ndls is automatic signal.comparsion baseless..moradabad divn handles nearly 250+trains daily..dont forget Moradbad is one of the biggest hub for Freight loadings and unloadings...numerous routes intersect here..namely HW/SRE/GZB/Bijnore/KGM/Chandausi/RMR/Sitapur/Unnao on what basis is this traffic 50% of CNB-NDLS route(not to forget it is automatic)?instead i always respect LKO/MB controllers for handling such traffic even without Automatic signalling...afaik CNB handles 350+ trains, LKO 300+ and MB 260+ trains...

4815 views
Jul 28 2016 (17:12)
DhnEcr~   4475 blog posts
Re# 1943927-3            Tags   Past Edits
Know abt the manual signal thing as it has outer problems. But the crowd is definetly 50% of Cnb. Not sure for freight as hardly seen any during journeys in Ddn- bsb. while Cnb route is overloaded with freight. Fr passenger train section MB has traffic from Delhi, Asr, Ddn side mostly while Ddn load is insignificant. Dli + umb makes bulk of it and Lko on the other.
click here
As per this link some 23 daily trains rest weekly bi tri and slots in a way to fit each other TT.
...
more...
Eg: 12318,12358,12326 combined 5 days a week.Lko is crowded no doubt and badly needs automatic signalling but MB isnt saturated to extent.

4349 views
Jul 28 2016 (23:53)
☆अलविदा गोंडा मीटरगेज■☆*^~   11965 blog posts   3039 correct pred (65% accurate)
Re# 1943927-4            Tags   Past Edits
Jb dhekho tb cancle train
Jul 28 2016 (08:37)  West UP rly stations far from clean, says survey (timesofindia.indiatimes.com)
back to top
NR/Northern  -  

News Entry# 275109     
   Tags   Past Edits
Jul 28 2016 (8:37AM)
Station Tag: Saharanpur Junction/SRE added by For Better Managed Indian Railways~/1546020

Jul 28 2016 (8:37AM)
Station Tag: Bareilly Junction/BE added by For Better Managed Indian Railways~/1546020

Jul 28 2016 (8:37AM)
Station Tag: Ghaziabad Junction/GZB added by For Better Managed Indian Railways~/1546020

Jul 28 2016 (8:37AM)
Station Tag: Meerut Cantt./MUT added by For Better Managed Indian Railways~/1546020

Posted by: For Better Managed Indian Railways~  948 news posts
Meerut: In a survey on the cleanliness standards of railway stations, released by railway minister Suresh Prabhu in Delhi on Tuesday, four of Uttar Pradesh railway stations featured in the list of ten dirtiest in the country. While all the four - Ballia, Shahganj, Janghai and Pratapgarh - are from the state's eastern parts, western UP districts have not done any better. In fact, Ghaziabad has been ranked in the survey at level 5 which is the lowest in the five tier category based on the level of cleanliness (below average).
Among other stations in the region, Meerut, Saharanpur, Aligarh, Hapur, Bariellly and Shahjahanpur scored level 4 which reflects 'average' while Moradabad, Chandausi and Agra Cantt had level 3 which means 'fair'.
...
more...
The analysis was conducted by Indian Railway Catering & Tourism Corporation (IRCTC) through TNS India Private Ltd and was commissioned by the ministry of railways. Launched under the 'Swachh Rail, Swachh Bharat Abhiyan, with the objective of measuring passengers' satisfaction and cleanliness at station premises, the survey covered 407 major railway stations across the country.
Speaking with TOI, Moradabad's additional divisional railway manager Sanjeev Singh said, "Some of our stations in Moradabad division, like Haridwar and Dehradoon, did well in Swachh Bharat rankings. However, we have a long way to go when it comes to other stations like Bareilly, Moradabad and Rampur. We have introduced mechanised cleaning at most of these stations. One of the important aspects remains support of public who need to be sensitized for the goal of cleanliness and which can't be achieved through punitive measures. We have been seeking cooperation and creating awareness to achieve a behaviourial change in people to maintain cleanliness and help us serve them better."
However, railway officials, who feel that too many factors were left out while preparing the report, believe that it cannot be taken as a benchmark.
For instance, Arun Arora, divisional railway manager of Delhi under whose jurisdiction Meerut, Ghaziabad and Muzaffarnagar also fall, said, "The primary aim of this report was to assess the level of cleanliness on the stations. The intention of railway ministry is very noble as it intends to upgrade stations to a higher level of cleanliness, but the report itself is a bit sketchy and does not reflect an authentic picture. The results have been drawn from the perception of a passenger whose profile also matters a lot in developing that perception."
"Cleanliness depends on a lot of factors, many of which are not in our control. For instance, encroachment near railway tracks, footfall and the profile of an average passenger. Delhi station cannot be compared with the one at Shamli. New Delhi railway station has to cater to 5 lakh passengers on a daily basis, it has 16 platforms and facilitates the movement of more than 300 trains on a daily basis. All these factors have an impressionable impact on a passenger. These things have not been taken into account while drafting the report. But it being a preliminary report, I am sure with time it will also be fine-tuned."
His sentiments were echoed by Neeraj Bhatnagar, spokesperson of Agra division, who said, "It is not clear that on what basis ranking has been done. Earlier this year, Agra Cantt station was awarded the best for maintenance of cleanliness in the entire NCR. The ranking is not satisfactory."
Page#    Showing 1 to 20 of 89 News Items  next>>

Scroll to Top
Scroll to Bottom


Go to Desktop site