Full Site Search  
Sat Mar 25, 2017 05:27:43 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Large Station Board;
Large Station Board;

TORI/Tori Junction (3 PFs)
ٹوری جنکشن     टोरी जंक्शन

Track: Double Electric-Line

Type of Station: Junction
Number of Platforms: 3
Number of Halting Trains: 32
Number of Originating Trains: 1
Number of Terminating Trains: 1
National Highway 99, Tori, Chandwa, 829203
State: Jharkhand
Elevation: 515 m above sea level
Zone: ECR/East Central
Division: Dhanbad
4 Travel Tips
No Recent News for TORI/Tori Junction
Nearby Stations in the News

Rating: 4.4/5 (8 votes)
cleanliness - good (1)
porters/escalators - good (1)
food - good (1)
transportation - excellent (1)
lodging - excellent (1)
railfanning - good (1)
sightseeing - excellent (1)
safety - excellent (1)

Nearby Stations

CTQ/Chetar 9 km     MMLN/Mahuamilan 13 km     BODG/Bodagram PH 14 km     RCGT/Richughuta 17 km     MGME/McCluskieGanj 22 km     DEMU/Demu 26 km     KLRE/Khalari 29 km     BICI/Barkichanpi 30 km     LTHR/Latehar 32 km     RAY/Ray 38 km    

Station News

Page#    Showing 1 to 20 of 20 News Items  
Mar 10 2017 (16:01)  टोरी बनेगा रेलवे हब (www.prabhatkhabar.com)
back to top
Commentary/Human InterestBMRC/Bangalore Metro  -  

News Entry# 295951     
   Tags   Past Edits
Mar 10 2017 (16:01)
Station Tag: Ranchi Junction/RNC added by Is Holi Iphone ki umeed waali Holi^~/1270085

Mar 10 2017 (16:01)
Station Tag: Barkakana Junction/BRKA added by Is Holi Iphone ki umeed waali Holi^~/1270085

Mar 10 2017 (16:01)
Station Tag: Tori Junction/TORI added by Is Holi Iphone ki umeed waali Holi^~/1270085

Posted by: I hate Yogi in reality bt his work proves me wrong^~  284 news posts
टोरी (चंदवा) के साथ एक नया अध्याय जुड़ गया. अब टोरी स्टेशन से रेलवे के दो जोन जुड़ गये. पूर्व में टोरी-बरकाकाना रेल लाइन (इसीआर जोन) ही था. रांची-लोहरदगा-टोरी रेल आने के बाद एसइआर जोन भी टोरी से जुड़ गया. ऐसे में टोरी जल्द ही रेलवे हब बनने की दिशा में अग्रसर हो गया है. नये टोरी रेलवे स्टेशन के कंस्ट्रक्शन का काम भी प्रगति पर है. टोरी-शिवपुर हजारीबाग रेल लाइन निर्माण कार्य शुरू है. इसके चालू होने के बाद टोरी की रंगत और बदल जायेगी.
Mar 09 2017 (18:47)  आज रांची-लोहरदगा-टोरी पैसेंजर को मुख्यमंत्री दिखायेंगे हरी झंडी (www.prabhatkhabar.com)
back to top
New/Special TrainsSER/South Eastern  -  

News Entry# 295860     
   Tags   Past Edits
Mar 09 2017 (18:48)
Station Tag: Tori/TORI added by माएरी याद वो याद वो आए री😊^~/1421836

Mar 09 2017 (18:48)
Station Tag: Lohardaga/LAD added by माएरी याद वो याद वो आए री😊^~/1421836

Mar 09 2017 (18:48)
Station Tag: Ranchi Junction/RNC added by माएरी याद वो याद वो आए री😊^~/1421836

Mar 09 2017 (18:47)
Train Tag: Ranchi - Tori Inaugural Passenger Special/08653 added by माएरी याद वो याद वो आए री😊^~/1421836

Posted by: दिल्ली में मोदी यूपी में योगी हिंदुत्व की जय हो🙏  82 news posts
रांची. रांची से लोहरदगा-टोरी के बीच सीधी रेल सेवा शुक्रवार से शुरू हो जायेगी. गुरुवार को रेलमंत्री सुरेश प्रभु सादे समारोह में दिल्ली से वीडियो कांफ्रेंसिंग के जरिये रिमोट कंट्रोल से हरी झंडी दिखाकर ट्रेन को रवाना करेंगे. इधर, रांची रेलवे स्टेशन पर भी दिन के 12 बजे से समारोह का आयोजन होगा.
इसमें मुख्यमंत्री रघुवर दास, केंद्रीय मंत्री सुदर्शन भगत, सांसद रामटहल चौधरी, सांसद महेश पोद्दार, मंत्री सह स्थानीय विधायक सीपी सिंह, लोहरदगा के विधायक सुखदेव भगत सहित रेलवे के वरीय अधिकारी हरी झंडी दिखाकर ट्रेन को रवाना करेंगे. इस दिन उदघाटन ट्रेन चलेगी. शुक्रवार से यह ट्रेन निर्धारित समय से खुलेगी. मंडल कार्यालय की अोर से उदघाटन की तैयारी शुरू कर दी गयी है.
...
more...
Mar 07 2017 (10:47)  दिल्ली से रेल मंत्री दिखायेंगे हरी झंडी, जल्द ही शुरू होगी रांची-टोरी रेल सेवा (www.prabhatkhabar.com)
back to top
New/Special TrainsSER/South Eastern  -  

News Entry# 295601   Blog Entry# 2188927     
   Tags   Past Edits
Mar 07 2017 (10:47)
Station Tag: Tori/TORI added by माएरी याद वो याद वो आए री😊^~/1421836

Mar 07 2017 (10:47)
Station Tag: Ranchi Junction/RNC added by माएरी याद वो याद वो आए री😊^~/1421836

Posted by: दिल्ली में मोदी यूपी में योगी हिंदुत्व की जय हो🙏  82 news posts
रांची: रांची से टोरी के बीच सीधी रेल सेवा जल्द शुरू होगी. इसकी तैयारी पूरी कर ली गयी है. सादे समारोह में रेल मंत्री सुरेश प्रभु दिल्ली से ही ट्रेन को हरी झंडी दिखाकर रवाना करेंगे.

इधर, रांची में इससे संबंधित समारोह आयोजित किया जायेगा, जिसमें कई गणमान्य लोग उपस्थित रहेंगे. उदघाटन के दिन सांकेतिक रूप से यह ट्रेन चलेगी. अगले दिन से ट्रेन अपने निर्धारित समय पर खुलेगी. फिलहाल, मंडल कार्यालय नौ मार्च को उदघाटन का दिन मानकर इसकी तैयारी कर रहा है. हालांकि, इस संदर्भ में कोई लिखित सूचना
...
more...
मंडल को नहीं मिली है. सूत्रों ने बताया है कि रांची से टोरी के बीच चलनेवाली पैसेंजर ट्रेन का किराया 40 से 45 रुपये के बीच होने की संभावना है.

ट्रेन की प्रस्तावित समय सारिणी
रांची से टोरी
रांची से खुलेगी सुबह 9:30 बजे
लोहरदगा पहुंचेगी 11:00 बजे
लोहरदगा से खुलेगी 11:05 बजे
बड़कीचांपी पहुंचेगी 11:25 बजे
बड़कीचांपी से खुलेगी 11:27 बजे
बोदा पहुंचेगी 11:48 बजे
बोदा से खुलेगी 11:50 बजे
टोरी पहुंचेगी दोपहर 12:05 बजे
टोरी से रांची
टोरी से खुलेगी दोपहर 2:45 बजे
बोदा पहुंचेगी 3:00 बजे
बोदा से खुलेगी 3:02 बजे
बड़कीचांपी पहुंचेगी 3:28 बजे
बड़कीचांपी से खुलेगी 3:30 बजे
लोहरदगा पहुंचेगी 3:50 बजे
लोहरदगा से खुलेगी 3:55 बजे
रांची पहुंचेगी शाम 5:25 बजे

1311 views
Mar 07 2017 (14:27)
I hate Yogi in reality bt his work proves me wrong^~   32110 blog posts   22996 correct pred (76% accurate)
Re# 2188927-1            Tags   Past Edits
11 march k baad bhut trains aur saare projects shuru honge
election k karan sb ruka hua tha

1309 views
Mar 07 2017 (14:32)
22481 जोधपुर दिल्ली सराय रोहिल्ला एक्सप्रेस^~   2973 blog posts   255 correct pred (53% accurate)
Re# 2188927-2            Tags   Past Edits
Yes kal he RTGH SRDR ka CRS hone wala hai. 😍😍😍😍

1201 views
Mar 07 2017 (15:36)
Aditya   3352 blog posts   14730 correct pred (79% accurate)
Re# 2188927-3            Tags   Past Edits
Yes.
Feb 21 2017 (08:41)  मार्च से टोरी लाइन पर दौड़ेगी ट्रेन (epaper.jagran.com)
back to top
Commentary/Human InterestSER/South Eastern  -  

News Entry# 294429   Blog Entry# 2172709     
   Tags   Past Edits
Feb 21 2017 (08:41)
Station Tag: Barkichanpi/BICI added by 4πu¶am*^~/401739

Feb 21 2017 (08:41)
Station Tag: Lohardaga/LAD added by 4πu¶am*^~/401739

Feb 21 2017 (08:41)
Station Tag: Tori/TORI added by 4πu¶am*^~/401739

Feb 21 2017 (08:41)
Station Tag: Ranchi Junction/RNC added by 4πu¶am*^~/401739

Posted by: 4πu¶am*^~  4372 news posts
प्रस्तावित समय
’ ट्रेन नंबर 58651 रांची से 05.30 पर खुलकर 7 बजे लोहरदगा पहुंचेगी।
’ ट्रेन नंबर 58652 लोहरदगा से 07.35 पर खुलकर 09.05 बजे रांची पहुंचेगी।
’ ट्रेन नंबर 58653 रांची से 09.30 पर खुलकर 12.05 बजे टोरी पहुंचेगी।
...
more...
ट्रेन नंबर 58654 टोरी से 14.45 पर खुलकर 17.25 बजे रांची पहुंचेगी।
’ ट्रेन नंबर 58655 रांची से 18.15 पर खुलकर 19.45 बजे लोहरदगा पहुंचेगी।
’ ट्रेन नंबर 58656 लोहरदगा से 20.20 पर खुलकर 21.40 बजे रांची पहुंचेगी।
जागरण संवाददाता, रांची : रांची-टोरी रेल लाइन मार्च 2017 तक चालू हो जाएगी। इसके लिए सीआरएस (कमीशन ऑफ रेलवे सेफ्टी) ने अपनी सहमति जता दी है। सीआरएस की नौ सदस्यीय टीम ने सोमवार को टोरी लाइन का निरीक्षण किया। साथ में रांची रेल मंडल के डीआरएम एसके अग्रवाल उपस्थित थे। सीआरएस ने पाया कि कुछ छोटे कामों को छोड़ दिया जाए, तो रेलवे लाइन को लेकर अधिकतर कामकाज पूरा हो चुका है। सीआरएस सुदर्शन नायक ने बताया कि पहाड़ों की कटाई हो चुकी है। पहाड़ों से पत्थर न गिरे इसके लिए उन्हें बांधा जा रहा है। कुछ कार्य अधूरे हैं, जिसे मार्च तक पूरा कर लिया जाएगा। सीसीआरएस ने इसकी जानकारी निरीक्षण करने के बाद रांची रेलवे स्टेशन पर पत्रकारों को दिया।
तीन फेरे चलेगी ट्रेन : डीआरएम एसके अग्रवाल ने बताया कि रांची से लोहरदगा तक चार फेरे ट्रेन चलाई जा रही है। बड़कीचांपी से टोरी तक रेल लाइन पूरा होते ही ट्रेनों के फेरों में कटौती कर दी जाएगी। चार के बदले तीन फेरे ट्रेन चलाई जाएगी। रांची से टोरी आने-जाने में स्वाभाविक रूप से ट्रेन को ज्यादा समय लगेगा। इसलिए अब इस मार्ग पर रांची लोहरदगा ट्रेन के तीन फेरे ही चलाए जाने का प्रस्ताव है। इस संबंध में रांची मंडल के मंडल रेल प्रबंधक एसके अग्रवाल एवं वरिष्ठ अधिकारियों की झारखंड पैसेंजर एसोसिएशन व झारखंड चैंबर ऑफ कॉमर्स के सदस्यों के साथ उच्चस्तरीय बैठक भी हुई थी। ट्रेन की जानकारी देते रेलवे अधिकारी एस नायक व डीआरएम एसके अग्रवाल

1962 views
Feb 21 2017 (09:44)
DhnEcr~   4907 blog posts
Re# 2172709-1            Tags   Past Edits
Excellent news. Passengers train covering the stretch in 2.5 hours then express sf may do it in 1.5-2 hours

1950 views
Feb 21 2017 (10:25)
Aditya   3352 blog posts   14730 correct pred (79% accurate)
Re# 2172709-2            Tags   Past Edits
Now Tori Should Be Update As Tori Jn. #moderator Sir Please Update ☺
Feb 14 2017 (08:08)  रांची-टोरी रेल मार्ग: मार्च से परिचालन शुरू होने की संभावना, ट्रेनों के परिचालन से पहले सुविधाएं बढ़ाइये सरकार (www.prabhatkhabar.com)
back to top
New Facilities/TechnologySER/South Eastern  -  

News Entry# 293839   Blog Entry# 2164375     
   Tags   Past Edits
Feb 14 2017 (08:08)
Station Tag: Tori/TORI added by इश्क़ छुपता नहीं छुपाने से☺/1421836

Feb 14 2017 (08:08)
Station Tag: Lohardaga/LAD added by इश्क़ छुपता नहीं छुपाने से☺/1421836

Feb 14 2017 (08:08)
Station Tag: Ranchi Junction/RNC added by इश्क़ छुपता नहीं छुपाने से☺/1421836

Posted by: दिल्ली में मोदी यूपी में योगी हिंदुत्व की जय हो🙏  82 news posts
रांची: रांची-टोरी रेल मार्ग पर मार्च से ट्रेनों का परिचालन शुरू होने की संभावना जतायी जा रही है. इसके शुरू हो जाने से न सिर्फ टोरी, बल्कि पलामू सहित अन्य जगह जानेवाले यात्रियों को लाभ होगा. उन्हें लगभग 100 किमी की दूरी कम तय करनी होगी. साथ ही पैसों की भी बचत होगी. हालांकि, इस लाइन में पड़नेवाले प्रमुख स्टेशनों में यात्री सुविधा का अभाव है, जिससे आम यात्रियों को काफी परेशानी हो रही है.
रांची-टाेरी रेल मार्ग के प्रमुख स्टेशनों में से महत्वपूर्ण है लोहरदगा स्टेशन.
यहां न तो यात्री शेड है
...
more...
और न ही बैठने के लिए कुर्सियां. पीने की पानी के लिए मात्र एक चापाकल लगाया गया है. प्लेटफार्म पर पर्याप्त दुकानें और शौचालय नहीं हैं, जिससे महिला यात्रियों काफी परेशानी होती है. बिजली कटने पर स्टेशन में अंधेरा रहता है. ऐसे में यदि यहां महत्वपूर्ण ट्रेनें रुकेंगी, तो उनके यात्रियों को काफी परेशानी होना तय है. वहीं, बड़कीचांपी स्टेशन का हाल तो अौर भी बुरा है. यहां फिलहाल निर्माण की प्रक्रिया चल रही है. टोरी स्टेशन पर भी कई जरूरी सुविधाएं नहीं हैं.
टोरी में टिकट घर की व्यवस्था देख नाराज हुए थे जीएम : महाप्रबंधक एसएन अग्रवाल अपने दौरे क्रम में टोरी रेलवे स्टेशन के टिकट घर की व्यवस्था देख कर काफी नाराज हुए थे. यहां टिकट घर में काउंटरों की संख्या कम है. साथ ही यहां कई जरूरी सुविधाएं भी नहीं हैं. महाप्रबंधक ने अविलंब इस व्यवस्था को दुरुस्त करने का निर्देश दिया था.
तेजी से हो रहा है काम : रांची-लोहरदगा-बड़कीचांपी-टोरी लाइन का काम तेजी से हो रहा है. फिलहाल, रेलवे ट्रैक में ग्रीसिंग और गिट्टी की लेबलिंग की जा रही है. कार्य की देखरेख कर रहे अधिकारियों का मानना है कि दस दिनों के अंदर काफी बदलाव देखने को मिलेगा. इसके अलावा बड़कीचांपी में स्टेशन भवन बना लिया गया है. वहीं, सिग्नल सहित अन्य कार्य जल्दी पूरा कर लिये जायेंगे. 16 फरवरी को मुख्य संरक्षा आयुक्त इस लाइन का निरीक्षण करनेवाले थे, लेकिन यह कार्यक्रम कुछ दिनों के लिए आगे बढ़ गया है. उनकी स्वीकृति के बाद ही इस लाइन पर रेल का चलना संभव हो पायेगा.
रांची-टोरी रेल मार्ग पर ट्रेन परिचालन शुरू होने के बाद धीरे-धीरे लोहरदगा और बड़कीचांपी में व्यवस्था में काफी सुधार होगा. जो भी कमियां हैं, उन्हें चिह्नित कर चरणबद्ध तरीके से दूर किया जायेगा.
संतोष कुमार अग्रवाल, डीआरएम

1059 views
Feb 14 2017 (17:56)
DhnEcr~   4907 blog posts
Re# 2164375-1            Tags   Past Edits
पीने की पानी के लिए मात्र एक चापाकल लगाया गया है
Aur kya kahe

1114 views
Feb 14 2017 (18:00)
Incredible Indian Railway   189 blog posts   1 correct pred (25% accurate)
Re# 2164375-2            Tags   Past Edits
CIC और इसके आस पास के रूट की यही हाल है। अभी developement स्टेज पर है सभी।
Dec 27 2016 (10:36)  अप्रैल से रांची-टोरी लाइन पर दौड़ने लगेंगी पैसेंजर ट्रेनें (www.bhaskar.com)
back to top
Commentary/Human InterestSER/South Eastern  -  

News Entry# 289741   Blog Entry# 2106995     
   Tags   Past Edits
Dec 27 2016 (10:36AM)
Station Tag: Lohardaga/LAD added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Dec 27 2016 (10:36AM)
Station Tag: Chopan/CPU added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Dec 27 2016 (10:36AM)
Station Tag: Ranchi Junction/RNC added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Dec 27 2016 (10:36AM)
Station Tag: Tori/TORI added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Posted by: Few SF trains in NCR have silver spoon of PRIORITY*^  377 news posts
रांची-लोहरदगा-बरकीचापीटोरी न्यू रेल लाइन पर काम युद्धस्तर पर चल रहा है। बरकीचापी से टोरी तक मामूली काम बाकी रह गया है, जिसे अगले तीन माह में पूरा कर लिया जाएगा। रेलवे ने अप्रैल से इस ट्रैक पर यात्री ट्रेनों का परिचालन शुरू करने का लक्ष्य रखा है। इस नए ट्रैक पर ट्रेनों का परिचालन शुरू होने से रांची से दिल्ली की दूरी करीब 150 किलोमीटर घट जाएगी। यात्रा में करीब ढाई घंटे समय की भी बचत होगी। डीआरएम एसके अग्रवाल ने शनिवार को ट्रैक का इंस्पेक्शन किया। कहा कि बरकीचापी से टोरी तक 10 से 12 किमी तक रेलवे ट्रैक पहाड़ से होकर गुजरा है।
पत्थर का कोई बड़ा टुकड़ा पहाड़ से टूटकर ट्रैक पर जाए, इसलिए पहाड़ की कटिंग का
...
more...
कुछ काम रह गया है। सेफ्टी के लिए यह जरूरी है। इसे पूरा होने के बाद कमिश्नर ऑफ रेलवे सेफ्टी (सीआरएस) डिपार्टमेंट ट्रैक की जांच करेगा। सीआरएस की हरी झंडी मिलते ही इस ट्रैक पर यात्री ट्रेनें दौड़ने लगेंगी। हालांकि ट्रॉयल पूरा हो चुका है। मालगाड़ी के परिचालन में कोई दिक्कत नहीं है।
टोरीलाइन से सीधे यूपी में प्रवेश करेगी ट्रेन : नएलाइन के शुरू हाेने से ट्रेन लोहरदगा, बरकीचापी, टोरी होते हुए सीधे यूपी में प्रवेश कर जाएगी। टोरी से चोपन, चुनार होते हुए ट्रेन दिल्ली जाएगी। रांची से दिल्ली की दूरी 1450 किमी है। नए रूट से दिल्ली जाने में 1300 किमी की दूरी ही तय करनी पड़ेगी।
अभी जो ट्रेनें दिल्ली जाती हैं, वे रांची से मुरी, रामगढ़, गोला, बरकाकाना, लातेहार होते हुए टोरी पहुंचती हैं। इसमें करीब चार घंटे का समय लगता है। लोहरदगा रूट से जाने पर ट्रेन मुरी, बरकाकाना जाकर लोहरदगा होते हुए सीधे टोरी पहुंचेगी। इससे लगभग 150 किमी की दूरी कम हो जाएगी। यानी करीब ढाई घंटे समय की बचत होगी।
डीआरएम ने बताया कि सीआरएस के विशेषज्ञ रेलवे ट्रैक के आसपास ब्लास्ट कराकर जांच करेंगे। इसमें यह देखा जाएगा कि पहाड़ का कोई बड़ा हिस्सा टूट कर रेल लाइन पर रहा है या नहीं। इस काम को पूरा करने में दो से तीन माह का समय लग सकता है। अब कंस्ट्रक्शन विभाग पर निर्भर है कि कितनी जल्दी यह काम पूरा कर पाएगा।
टोरी-बरकीचापी रेलवे लाइन पर ट्रॉयल पूरा हो चुका है। दो-तीन माह पहले ही ट्रॉयल किया गया था, जो सफल रहा है। मालगाड़ी के परिचालन में कोई दिक्कत नहीं है। फिर भी इस नई रेल लाइन पर पहले कुछ दिनों तक मालगाड़ी दौड़ाई जाएगी। रेलवे अधिकारियों के अनुसार इसके बाद पैसेंजर ट्रेन चलाना सुरक्षित होगा। वरीय अधिकारियों ने इस बात का संकेत दिया कि जनवरी के अंत तक इस ट्रैक पर मालगाड़ी चलने लगेगी। इसके बाद ही पैसेंजर ट्रेनों का परिचालन शुरू होगा।

6 posts - Tue Dec 27, 2016 - are hidden. Click to open.

2 posts - Wed Dec 28, 2016 - are hidden. Click to open.

1929 views
Dec 29 2016 (15:54)
BJ~   2062 blog posts
Re# 2106995-9            Tags   Past Edits
subah ja ke sham ko aa sakti hai train
Dec 21 2016 (15:57)  Railway panel calls for security, medicare (m.timesofindia.com)
back to top
Crime/AccidentsECR/East Central  -  

News Entry# 289302     
   Tags   Past Edits
Dec 21 2016 (3:58PM)
Station Tag: Ranchi Junction/RNC added by 01035 Mumbai CST Gaya Weekly Special~/182720

Dec 21 2016 (3:58PM)
Station Tag: Tori/TORI added by 01035 Mumbai CST Gaya Weekly Special~/182720

Dec 21 2016 (3:58PM)
Station Tag: Garhwa Road Junction/GHD added by 01035 Mumbai CST Gaya Weekly Special~/182720

Dec 21 2016 (3:58PM)
Station Tag: Barwadih Junction/BRWD added by 01035 Mumbai CST Gaya Weekly Special~/182720

Dec 21 2016 (3:58PM)
Station Tag: Latehar/LTHR added by 01035 Mumbai CST Gaya Weekly Special~/182720

Dec 21 2016 (3:58PM)
Station Tag: DaltonGanj/DTO added by 01035 Mumbai CST Gaya Weekly Special~/182720

Dec 21 2016 (3:58PM)
Train Tag: Bhopal - Howrah Weekly Express/13026 added by 01035 Mumbai CST Gaya Weekly Special~/182720

Posted by: Mahaparinirwan Express DSJ Gaya Monthly~  84 news posts
DALTONGANJ: Members of the National Federation of Indian Railway Men (NFIRM) demanded adequate safety and security for the railway personnel in the East Central Railway zone under Dhanbad division, during their conference in Barwadeeh block in Latehar district on Thursday.
.
Hajipur zone's general secretary P S Chaturvedi and joint secretary Navin Kumar along with Mithilesh Kumar Singh of Moghulsarai zone were also present at the conference. The working president of NFIRM, Balmukund Pandey's special train ticket examiner Daltonganj and general secretary Suresh K Paswan jointly said "Railway personnel faces a lot of
...
more...
perils. For instance one train guard was murdered in a running train while a railway fitter was hammered to death by a passenger aboard the Bhopal Howrah express."
.
Pandey said apart from these two fatalities this year, numerous incidents were reported where the engine crew were stoned by ruffians, stolen cash and belongings of guards and gatemen of railway crossings subjected to abuses of all kinds.
Jul 31 2016 (11:18)  RS 26K-CR RAILWAY PROJECTS IN PROGRESS FOR J’KHAND (www.dailypioneer.com)
back to top
IR Affairs

News Entry# 275480     
   Tags   Past Edits
Jul 31 2016 (11:18AM)
Station Tag: Singrauli/SGRL added by Ghost Rider/356854

Jul 31 2016 (11:18AM)
Station Tag: Ramna/RMF added by Ghost Rider/356854

Jul 31 2016 (11:18AM)
Station Tag: Garhwa Road Junction/GHD added by Ghost Rider/356854

Jul 31 2016 (11:18AM)
Station Tag: Son Nagar Junction/SEB added by Ghost Rider/356854

Jul 31 2016 (11:18AM)
Station Tag: Ranchi Road/RRME added by Ghost Rider/356854

Jul 31 2016 (11:18AM)
Station Tag: Patratu/PTRU added by Ghost Rider/356854

Jul 31 2016 (11:18AM)
Station Tag: Barkakana Junction/BRKA added by Ghost Rider/356854

Jul 31 2016 (11:18AM)
Station Tag: Tori/TORI added by Ghost Rider/356854

Jul 31 2016 (11:18AM)
Station Tag: Ranchi Junction/RNC added by Ghost Rider/356854

Jul 31 2016 (11:18AM)
Station Tag: Dhanbad Junction/DHN added by Ghost Rider/356854

Jul 31 2016 (11:18AM)
Station Tag: RafiGanj/RFJ added by Ghost Rider/356854

Jul 31 2016 (11:18AM)
Station Tag: Chittaranjan/CRJ added by Ghost Rider/356854

Jul 31 2016 (11:18AM)
Station Tag: Chirimiri/CHRM added by Ghost Rider/356854

Jul 31 2016 (11:18AM)
Station Tag: Rampurhat/RPH added by Ghost Rider/356854

Jul 31 2016 (11:18AM)
Station Tag: Jasidih Junction/JSME added by Ghost Rider/356854

Jul 31 2016 (11:18AM)
Station Tag: Dumka/DUMK added by Ghost Rider/356854

Jul 31 2016 (11:18AM)
Station Tag: Basukinath/BSKH added by Ghost Rider/356854

Jul 31 2016 (11:18AM)
Station Tag: Gaya Junction/GAYA added by Ghost Rider/356854

Jul 31 2016 (11:18AM)
Station Tag: Barwadih Junction/BRWD added by Ghost Rider/356854

Jul 31 2016 (11:18AM)
Station Tag: DaltonGanj/DTO added by Ghost Rider/356854

Posted by: Ghost Rider  9 news posts
A total of 28 railway projects worth Rs 26,025 crore are in progress in the State of Jharkhand. It includes projects for lying 12 new lines at estimated cost of Rs 13,379 crore, gauge conversion of one line at cost of Rs 48.73 crore and doubling of 17 lines at cost of Rs 12,598 crore. Rajen Gohain, Minister of State for Railways stated in Rajya Sabha on July 29, 2016 in reply to the question raised by member of Rajya Sabha Parimal Nathwani.
The minister informed that the works for laying 12 new lines including Chitra-Basukinath (37 km), Godda-Pakur (80 km), Barwadih-Chirmari (182 km), Gaya-Bodhgaya-Chatra, Gaya-Natesar (Nalanda) (97 km), Gaya-Daltonganj via Rafiganj (136.88 km), Giridih-Koderma (102.5 km), Hansdiha-Godda (30 km), Koderma-Ranchi (189
...
more...
km), Koderma-Tilaiya (68 km), Pirpainti-Jasidih (97 km) and Rampurhat-Mandarhill via Dumka (130 km) with new MM for Rampurhat-Murarai (29.48 km) 3rd line are in progress.
Gauge conversion of Ranchi-Lohardaga with extension to Tori (113 km) is also going on, according to the statement laid on the table of the House. The work for doubling of lines including Garwa Road-Rail over rail (10 km), Gomoh-Flyover for down trains (15 km), Bondamunda-Ranchi (166 km), Chakradharpur-Goelkera 3rd line (34 km), Denea-Ranchi Road (25.2 km), Dhanbad-Sonnagar-Patratu 3rd line (291 km), Dongoaposi-Rajkharswan 3rd line (65 km), Garhwa Road-Ramna (32.32 km), Goelkera-Manohrpur 3rd line (40 km), Jarangdih-Danea (29.2 km), Khargpur-Adityapur 3rd line (132 km), Manoharpur-Bondamanda 3rd line (30 km), Rajkharswan-Chakradharpur 3rd line (20 km), Ramna-Singrauli (160 km), Ranchi Road-Patratu (31 km) and Sini-Adityapur (22.5 km) 3rd line are going on, as per the statement.
Nathwani wanted to know about on going and pending railway projects in the States of Gujarat and Jharkhand along with estimated cost of the projects. In Gujarat, total 20 railway projects with estimated cost of Rs 17,073 are in progress.
The minister stated that every railway project requires a number of clearances from various Ministries and Departments of State/Central Governments. These, inter-alia, include clearances inherent to land acquisition, forestry clearances and permission for crossing from departments like National Highway Authority of India, Public Works Department, Irrigation canals etc., and also clearances of Archeological Survey of India if the alignment is passing in vicinity of a protected monument, local bodies for project passing through urban areas, etc. which are part of project execution, he said. The progress of works is based on above factors and availability of funds, said the minister.
Jul 30 2016 (10:23)  झारखंड में 26,025 करोड़ रुपये की रेल परियोजनाएं (www.prabhatkhabar.com)
back to top
Other NewsSER/South Eastern  -  

News Entry# 275379   Blog Entry# 1945743     
   Tags   Past Edits
Jul 30 2016 (10:23AM)
Station Tag: Patratu/PTRU added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Sini Junction/SINI added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Adityapur/ADTP added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Kharagpur Junction/KGP added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Dhanbad Junction/DHN added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Patratu/PTRU added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Son Nagar Junction/SEB added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Chakradharpur/CKP added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Bondamunda/BNDM added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Netaji SC Bose Gomoh Junction/GMO added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Garhwa Road Junction/GHD added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Tori/TORI added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Lohardaga/LAD added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Rampurhat/RPH added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Jasidih Junction/JSME added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Ranchi Junction/RNC added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Koderma Junction/KQR added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Gaya Junction/GAYA added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Chirimiri/CHRM added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Ambikapur/ABKP added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Barwadih Junction/BRWD added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Pakur/PKR added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Basukinath/BSKH added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Chatra/CTR added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Singrauli/SGRL added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Posted by: Few SF trains in NCR have silver spoon of PRIORITY*^  377 news posts
रेल राज्यमंत्री ने राज्यसभा में सांसद परिमल नथवाणी द्वारा पूछे गये प्रश्न के उत्तर में दी जानकारी
12 नयी लाइनें बिछाने, आमान परिवर्तन और 17 लाइनों के दोहरीकरण की परियोजनाएं हैं शामिल

रांची : झारखंड में कुल 26,025 करोड़ रुपये की अनुमानित लागत की रेलवे परियोजनाएं चल रही हैं. इनमें 13,379 करोड़ की लागत से 12 नयी लाइनें
...
more...
बिछाने, 48.73 करोड़ रुपये की लागत से आमान परिवर्तन और 12,598 करोड़ रुपये की लागत से 17 लाइनों के दोहरीकरण की परियोजनाएं शामिल हैं. केंद्रीय रेल राज्यमंत्री राजेन गोहांई ने राज्यसभा में शुक्रवार को सांसद परिमल नथवाणी द्वारा पूछे गये प्रश्न के उत्तर में यह जानकारी दी.

मंत्री ने बताया कि झारखंड में कुल 12 नयी लाइनें बिछाने की परियोजनाएं हैं. इनमें चतरा-बासुकीनाथ 37 किमी, गोड्डा-पाकुड़ 80 किमी, बरवाडीह-चिरमारी 182 किमी, गया- बोधगया-चतरा, गया-नातेसर (नालंदा) गिरिडीह-कोडरमा 102.5 किमी, हसदीह-गोड्डा 30 किमी, कोडरमा- रांची 189 किमी, कोडरमा-तिलैया 68 किमी, पीरपैंती-जसीडीह 97 किमी, और रामपुरहाट-मंदारहिल बरास्ता दुमका 130 किमी, लाइन शामिल है. सदन के पटल पर रखे गए विवरण के अनुसार, टोरी तक विस्तार सहित रांची- लोहारदगा 113 किमी का आमान परिवर्तन किया जा रहा है. राज्य में रेल लाइनों के दोहरीकरण की परियोजनाओं में गढ़वा रोड-रेल ओवर रेल 10 किमी, गोमी डाउन गाड़ियों के लिए फ्लाई ओवर 15 किमी, बंडामुंडा-रांची 166 किमी, चक्रधरपुर-गोइलकेरा तीसरी लाइन 34 किमी, रांची रोड 25 किमी, धनबाद-सोननगर-पतरातु तीसरी लाइन 291 किमी, डोंगापोसी- खरसावां तीसरी लाइन 65 किमी, गढ़वा रोड-रमना 32.32 किमी, गोयलकेरा-मनोहरपुर तीसरी लाइन 40 किमी, जरंगडीह-दानी 29.2 किमी, खड़गपुर-आदित्यपुर तीसरी लाइन 30 किमी, खरसावां-चक्रधरपुर तीसरी लाइन 20 किमी, रमना-सिंगरौली 160 किमी, रांची रोड-पतरातु 31 किमी और सिनी-आदित्यपुर तीसरी लाइन 22.5 शामिल हैं.

10461 views
Jul 30 2016 (11:35)
hiprasoon   321 blog posts   59 correct pred (77% accurate)
Re# 1945743-1            Tags   Past Edits
Bahut Kaam ho raha hai Jharkhand mein..logo unhi bol rahe hai Purvachal ko fayda ho raha hai due to Manoj Sinha.
Purvachal koi pucha nahi except Pt Kamla pati tripathi. Purvanchal ke naam par sirf BSB mein kuch hota tha ya fir GKP mein.
Mar 30 2016 (00:02)  Trial run on Lohardaga-Tori rail link conducted (indiatoday.intoday.in)
back to top
Other NewsSER/South Eastern  -  

News Entry# 262825   Blog Entry# 1784198     
   Tags   Past Edits
Mar 30 2016 (12:02AM)
Station Tag: Tori/TORI added by GoldPacific/219610

Mar 30 2016 (12:02AM)
Station Tag: Lohardaga/LAD added by GoldPacific/219610

Mar 30 2016 (12:02AM)
Station Tag: Ranchi Junction/RNC added by GoldPacific/219610

Posted by: GoldPacific  2 news posts
Trial run on Lohardaga-Tori rail link conducted
PTI
March 29, 2016 | UPDATED 23:25 IST
Lohardaga(Jharkhand), Mar 29 (PTI) Trial run on the Lohardaga-Tori rail link was conducted as part of the proposed Ranchi-Lohardaga-Tori rail project in Lohardaga district today.
The
...
more...
engine, which left Lohardaga at 11 AM, ran till Boda, railway officials said Senior Section Engineer and others were on board the engine.
The distance between Ranchi and Tori was about 113 km, while it was 69 km from Ranchi to Lohardaga covering 12 stations.
Following the implementation of the Ranchi-Tori rail link, travel timing between Delhi and Ranchi was expected to reduce by over five hours, the officials said

7 posts - Wed Mar 30, 2016 - are hidden. Click to open.

3 posts - Mon Apr 04, 2016 - are hidden. Click to open.

1 posts - Tue Apr 05, 2016 - are hidden. Click to open.

2 posts - Fri Apr 29, 2016 - are hidden. Click to open.

1 posts - Sat Apr 30, 2016 - are hidden. Click to open.

3267 views
May 03 2016 (05:54)
GoldPacific   246 blog posts   91 correct pred (72% accurate)
Re# 1784198-15            Tags   Past Edits
Gotcha .... I thought you replied to one of my posts as I never mentioned that myself ...On the contrary I have been reiterating the same as you, i.e. max saving will be 3 Hrs for the slow trains and 1.5 to 2 Hrs for the Super fast / Exp.
Page#    Showing 1 to 20 of 20 News Items  

Scroll to Top
Scroll to Bottom


Go to Desktop site