Full Site Search  
Sat Mar 25, 2017 21:03:27 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Large Station Board;

VEER/Veer (1 PFs)
वीर     वीर

Track: Construction - Single-Line Electrification

Type of Station: Regular
Number of Platforms: 1
Number of Halting Trains: 8
Number of Originating Trains: 0
Number of Terminating Trains: 0
NH-17, Tel: 02145-270055, Veer
State: Maharashtra
Elevation: 6 m above sea level
Zone: KR/Konkan
Division: Ratnagiri
2 Travel Tips
No Recent News for VEER/Veer
Nearby Stations in the News

Rating: 3.0/5 (21 votes)
cleanliness - good (3)
porters/escalators - average (2)
food - average (2)
transportation - average (3)
lodging - average (2)
railfanning - average (3)
sightseeing - good (3)
safety - good (3)

Nearby Stations

GNO/Goregaon Road Halt 6 km     SAPE/Sape Wamne 8 km     KFD/Karanjadi 16 km     MNI/Mangaon 17 km     INP/Indapur 23 km     VINH/Vinhere 24 km     DWV/Diwan Khavati 34 km     KOL/Kolad 34 km    

Station News

Page#    Showing 1 to 9 of 9 News Items  
Mar 10 2017 (09:42)  कोकण रेल्वेच्या कामात महसूल यंत्रणेला ठेवले वंचित (www.lokmat.com)
back to top
IR AffairsKR/Konkan  -  

News Entry# 295903   Blog Entry# 2192349     
   Tags   Past Edits
Mar 10 2017 (09:42)
Station Tag: Veer/VEER added by ameyambre/16020

Mar 10 2017 (09:42)
Station Tag: Mangaon/MNI added by ameyambre/16020

Mar 10 2017 (09:42)
Station Tag: Roha/ROHA added by ameyambre/16020

Posted by: ameyambre~  1802 news posts
काही महिन्यांपूर्वी रोहा ते वीर डबल ट्रॅक करण्याचे भूमिपूजन रेल्वे मंत्री सुरेश प्रभू यांच्या हस्ते करण्यात आले. प्रत्यक्षात एक महिन्यापूर्वी रोहा ते वीर कोकण रेल्वे डबल ट्रॅकचे काम जोमाने व जलद गतीने चालू झाले आहे. मात्र, माणगाव तालुक्यातील महसूल यंत्रणेला या कामाची माहितीच जिल्हाधिकाऱ्यांकडून वा कोकण रेल्वेकडून मिळाली नसल्याचे समजते. त्यामुळे या ठिकाणी काम करीत असलेल्या कंत्राटदारांना रान मोकळे मिळाले आहे. त्याचाच परिणाम नागरिकांस भोगावा लागत
आहे.
गेला महिनाभर माणगाव तालुक्यात गोरेगाव येथे कोकण रेल्वेचा रोहा ते वीर डबल ट्रॅकच्या भरावाचे काम सुरू झाले. ते काम फार जलद गतीने चालू आहे. याच्याबद्दल तहसीलदार
...
more...
ऊर्मिला पाटील यांच्याकडे चौकशी केली असता आमच्याकडे कोणताही पत्रव्यवहार झाला नसल्याचे सांगितले. तसेच कोकण रेल्वेच्या भरावाकरिता माणगाव तहसील कार्यालयात कोणतीही परवानगी दिली नसल्याचे सांगितले.
जिल्हा गौण खनिजकर्म अधिकाऱ्यांना या कामाबाबत विचारले असता त्यांनी कोकण रेल्वे उप अभियंता यांना दिलेले पत्र दाखवले. यामध्ये रोहा-वीर या डबल ट्रॅकचे काम मे.एस.आर.सी.कंपनी इन्फ्रास्ट्रक्चर प्रा. लिमिटेड या कंपनीला दिले असल्याचे दिसले. या कामासाठी लाखो ब्रास माती उत्खनन रॉयल्टीचे पैसे काम पूर्ण झाल्यावर मोजमाप करून कोकण रेल्वे कंत्राटदार यांच्या पैशातून रॉयल्टीचे पैसे कट करून देणार असल्याचे पत्रात सांगितले आहे. म्हणजेच काम झाल्यानंतर कोणते परिमाण वापरून माती मोजण्याचे काम करणार याबाबत संशय निर्माण होतो. सर्वात महत्त्वाची गोष्ट म्हणजे परवानगीचे पत्र २० फेब्रुवारीचे आहे, मात्र माती उत्खननाचे काम १ फेब्रुवारीपासून चालू झाले आहे. या कामासाठी होणाऱ्या भरावाबद्दल माणगाव प्रांत कार्यालय व तहसील कार्यालयात माहिती घेतली असता आम्हाला काहीच माहिती नसल्याचे सांगितले.
आणखीन म्हणजे या पत्रात दिलेल्या आटी-शर्तीनुसार काम होत नसल्याचे दिसते. कंत्राटदाराने दिलेल्या जमिनीच्या सर्वे नंबरमध्ये उत्खनन होत नाही तर दुसऱ्याही सर्वे नंबरमधून उत्खनन होत आहे.
तसेच या उत्खननासाठी जे डम्पर नंबर दिले आहेत त्याच्या व्यतिरिक्त सुद्धा आणखीन डंपर वापरत असल्याचे दिसते आहे.
डंपरमुळे गोरेगाव बाजारपेठेत वाहतूककोंडी
माती उत्खनन करून गोरेगावच्या बाजारपेठेतून डंपरच्या सारख्या फेऱ्या होत असतात. यामुळे बाजारपेठेत वारंवार वाहतूककोंडी होते. डंपर इतका भरलेला असतो की येथील नागरिकांच्या डोळ्यांत माती उडत असते आणि पोलीस सुद्धा या क्षमतेपेक्षा जास्त भरलेल्या गाड्यांवर करवाई करीत नाहीत. नाहक सर्वसामान्य नागरिकांना त्रास सहन करावा लागत आहे. तसेच या धुळीवरून डंपरचालक व नागरिकांमध्ये वाद झाल्याच्या घटना वारंवार घडत आहेत. तसेच डंपरचालक नागरिकांना दमदाटी करीत धमकावत असल्याची घटना घडली आहे. याबाबत नागरिकही तक्रारी करीत आहेत.
विशेष बाब म्हणजे कंत्राटदार कोकण रेल्वेच्या भरावाच्या नावाने लोणेरे ग्रामपंचायत हद्दीत दोन ठिकाणी लोणेरे - गोरेगाव मार्गालगत भराव केल्याचे दिसते. त्याची माहिती मंडळ अधिकारी लोणेरे यांच्याकडून घेतली असता त्यासाठी कोणतीही रॉयल्टी घेतली नसल्याचे सांगण्यात आले.
कोकण रेल्वेचे दुपदरीकरण होत असल्याने त्याच्या भरावासाठी लागणाऱ्या मातीकरिता रॉयल्टी ही कोकण रेल्वे कंत्राटदारांना अदा करण्यात येणाऱ्या पैशांतून देणार आहेत. त्याचा पहिला टप्पा म्हणून ९ मार्च रोजी एक कोटी ४० लाख रुपये जिल्हाधिकारी कार्यालय अलिबाग येथे भरणार आहेत.
- रोशन मेश्राम, जिल्हा खनिज गौण अधिकारी, अलिबाग
लोणेरे-गोरेगाव रस्त्यालगत लोणेरे ग्रामपंचायत हद्दीत दोन ठिकाणी भराव झाले आहेत. मात्र, त्याची कोणत्याही प्रकारची रॉयल्टी घेण्यात आली नाही वा कोणताही अर्ज आला नाही.
- योगिता पाटील,
मंडळ अधिकारी लोणेरे

980 views
Mar 10 2017 (09:50)
Yash Railographer~   441 blog posts   171 correct pred (73% accurate)
Re# 2192349-1            Tags   Past Edits
This is not fair. Doubling tar vhayla hava, pan lokana traas sahan Karava lagu naye.
click here NEWS:
09:12PM - रत्नागिरी - कोकण रेल्वे मार्गावरील रोहा ते वीर मार्गाचे दुपदरीकरण जानेवारीपासून, व्यवस्थापकीय संचालक संजय गुप्ता यांनी रत्नागिरीमध्ये दिली माहिती.
The doubling of line between Roha and Veer on Konkan railway will start from January.
Sanjay Gupta, M.D.
Sep 17 2016 (18:59)  RUNNING OF UNRESERVED SPECIAL TRAINS ON KONKAN RAILWAY ROUTE (www.konkanrailway.com)
back to top
Other News

News Entry# 280443     
   Tags   Past Edits
Sep 18 2016 (1:47AM)
Train Tag: Panvel - Ratnagiri Special/00509 added by Vaibhav Agarwal*^/432532

Sep 18 2016 (1:47AM)
Train Tag: Ratnagiri - Panvel Special/00504 added by Vaibhav Agarwal*^/432532

Sep 17 2016 (7:00PM)
Station Tag: Ratnagiri/RN added by Akshay Mahapadi/33893

Sep 17 2016 (7:00PM)
Station Tag: Bhoke/BOKE added by Akshay Mahapadi/33893

Sep 17 2016 (7:00PM)
Station Tag: Ukshi/UKC added by Akshay Mahapadi/33893

Sep 17 2016 (7:00PM)
Station Tag: Sangameshwar Road/SGR added by Akshay Mahapadi/33893

Sep 17 2016 (7:00PM)
Station Tag: Savarda/SVX added by Akshay Mahapadi/33893

Sep 17 2016 (7:00PM)
Station Tag: Kamathe/KMAH added by Akshay Mahapadi/33893

Sep 17 2016 (7:00PM)
Station Tag: Chiplun/CHI added by Akshay Mahapadi/33893

Sep 17 2016 (7:00PM)
Station Tag: Khed/KHED added by Akshay Mahapadi/33893

Sep 17 2016 (7:00PM)
Station Tag: Diwan Khavati/DWV added by Akshay Mahapadi/33893

Sep 17 2016 (7:00PM)
Station Tag: Vinhere/VINH added by Akshay Mahapadi/33893

Sep 17 2016 (7:00PM)
Station Tag: Karanjadi/KFD added by Akshay Mahapadi/33893

Sep 17 2016 (7:00PM)
Station Tag: Sape Wamne/SAPE added by Akshay Mahapadi/33893

Sep 17 2016 (7:00PM)
Station Tag: Veer/VEER added by Akshay Mahapadi/33893

Sep 17 2016 (7:00PM)
Station Tag: Goregaon Road Halt/GNO added by Akshay Mahapadi/33893

Sep 17 2016 (6:59PM)
Station Tag: Mangaon/MNI added by Akshay Mahapadi/33893

Sep 17 2016 (6:59PM)
Station Tag: Kolad/KOL added by Akshay Mahapadi/33893

Sep 17 2016 (6:59PM)
Station Tag: Roha/ROHA added by Akshay Mahapadi/33893

Sep 17 2016 (6:59PM)
Station Tag: Nidi/NIDI added by Akshay Mahapadi/33893

Sep 17 2016 (6:59PM)
Station Tag: Nagothane/NGTN added by Akshay Mahapadi/33893

Sep 17 2016 (6:59PM)
Station Tag: Kasu/KASU added by Akshay Mahapadi/33893

Sep 17 2016 (6:59PM)
Station Tag: Pen/PEN added by Akshay Mahapadi/33893

Sep 17 2016 (6:59PM)
Station Tag: Apta/APTA added by Akshay Mahapadi/33893

Sep 17 2016 (6:59PM)
Station Tag: Rasayani/RSYI added by Akshay Mahapadi/33893

Sep 17 2016 (6:59PM)
Station Tag: Somatne/SMNE added by Akshay Mahapadi/33893

Sep 17 2016 (6:59PM)
Station Tag: Ratnagiri/RN added by Akshay Mahapadi/33893

Sep 17 2016 (6:59PM)
Station Tag: Panvel Junction/PNVL added by Akshay Mahapadi/33893

Sep 17 2016 (6:59PM)
Station Tag: Diva Junction/DIVA added by Akshay Mahapadi/33893

Sep 17 2016 (6:59PM)
Train Tag: Dadar - Ratnagiri Passenger/50103 added by Akshay Mahapadi/33893

Sep 17 2016 (6:59PM)
Train Tag: Ratnagiri - Dadar Passenger/50104 added by Akshay Mahapadi/33893

Posted by: Akshay Mahapadi~  21 news posts
17-September-2016

Central Railway has decided to take up Line Block at DIVA station on 18/09/2016 Sunday from 08:30 to 18:30hrs Total 10:00hrs Block due to which following train cancelled and special trains will be run. Details of the services are given as under:-
A) Cancellation :-
Train
...
more...
No.50104/ 50103 Ratnagiri – Dadar – Ratnagiri Passenger on 18/09/2016 (Sunday) is cancelled.

B) Train No. 00504 /00509 Ratnagiri - Panvel –Ratnagiri Unreserved Special on 18/09/2016 :-
Train No. 00504 Ratnagiri – Panvel Unreserved Special will leave from Ratnagiri at 07.30 Hrs.on 18 September 2016. Train will reach Panvel at 14.45 Hrs. on Same Day.
Train No. 00509 Panvel- Ratnagiri Unreserved Special will leave from Panvel at 16.57 Hrs. on 18th September 2016. Train will reach Ratnagiri at 00.50 Hrs. on Next Day.
Train will have 18 Coaches and will halt at Bhoke, Ukshi, Sangameshwar, Aravali Road, Savarda, Kamthe, Chiplun. Anjani, Khed, Divankhavati, Vinhere, Karanjadi, Sape-Wamane(H), Veer, Goregaon (H), Mangaon, Indapur Road (H), Kolad, Roha, Nidi, Nagothane, Kasu, Pen, Hamarpur, Jite, Apta, Rasayani and Somatne Stations.

Passengers may avail of the services.


(L. K. Verma)
Chief Public Relations Officer
Aug 30 2016 (22:35)  RUNNING OF GANPATI SPECIAL TRAINS ON KONKAN RAILWAY ROUT (www.konkanrailway.com)
back to top
New/Special TrainsKR/Konkan  -  

News Entry# 278596     
   Tags   Past Edits
Aug 30 2016 (10:36PM)
Station Tag: Mangaluru Junction (Mangalore)/MAJN added by Akshay Mahapadi/33893

Aug 30 2016 (10:36PM)
Station Tag: Surathkal/SL added by Akshay Mahapadi/33893

Aug 30 2016 (10:36PM)
Station Tag: Udupi/UD added by Akshay Mahapadi/33893

Aug 30 2016 (10:36PM)
Station Tag: Byndoor Mookambika Road/BYNR added by Akshay Mahapadi/33893

Aug 30 2016 (10:36PM)
Station Tag: Bhatkal/BTJL added by Akshay Mahapadi/33893

Aug 30 2016 (10:36PM)
Station Tag: Kumta/KT added by Akshay Mahapadi/33893

Aug 30 2016 (10:36PM)
Station Tag: Karwar/KAWR added by Akshay Mahapadi/33893

Aug 30 2016 (10:36PM)
Station Tag: Madgaon Junction/MAO added by Akshay Mahapadi/33893

Aug 30 2016 (10:36PM)
Station Tag: Thivim/THVM added by Akshay Mahapadi/33893

Aug 30 2016 (10:36PM)
Station Tag: Sawantwadi Road/SWV added by Akshay Mahapadi/33893

Aug 30 2016 (10:36PM)
Station Tag: Kudal/KUDL added by Akshay Mahapadi/33893

Aug 30 2016 (10:36PM)
Station Tag: Sindhudurg/SNDD added by Akshay Mahapadi/33893

Aug 30 2016 (10:36PM)
Station Tag: Kankavali/KKW added by Akshay Mahapadi/33893

Aug 30 2016 (10:36PM)
Station Tag: Vaibhavwadi Road/VBW added by Akshay Mahapadi/33893

Aug 30 2016 (10:36PM)
Station Tag: Rajapur Road/RAJP added by Akshay Mahapadi/33893

Aug 30 2016 (10:36PM)
Station Tag: Ratnagiri/RN added by Akshay Mahapadi/33893

Aug 30 2016 (10:36PM)
Station Tag: Adavali/ADVI added by Akshay Mahapadi/33893

Aug 30 2016 (10:36PM)
Station Tag: Sangameshwar Road/SGR added by Akshay Mahapadi/33893

Aug 30 2016 (10:36PM)
Station Tag: Savarda/SVX added by Akshay Mahapadi/33893

Aug 30 2016 (10:36PM)
Station Tag: Chiplun/CHI added by Akshay Mahapadi/33893

Aug 30 2016 (10:36PM)
Station Tag: Khed/KHED added by Akshay Mahapadi/33893

Aug 30 2016 (10:36PM)
Station Tag: Veer/VEER added by Akshay Mahapadi/33893

Aug 30 2016 (10:36PM)
Station Tag: Mangaon/MNI added by Akshay Mahapadi/33893

Aug 30 2016 (10:36PM)
Station Tag: Roha/ROHA added by Akshay Mahapadi/33893

Aug 30 2016 (10:36PM)
Station Tag: Panvel Junction/PNVL added by Akshay Mahapadi/33893

Aug 30 2016 (10:36PM)
Station Tag: Vasai Road/BSR added by Akshay Mahapadi/33893

Aug 30 2016 (10:36PM)
Train Tag: Indore - Vikramnagar Simhasth Special/00116 added by Akshay Mahapadi/33893

Aug 30 2016 (10:36PM)
Train Tag: Vikramnagar - Indore Simhasth Special/00115 added by Akshay Mahapadi/33893

Aug 30 2016 (10:36PM)
Train Tag: Indore - Vikramnagar Simhasth Special/00112 added by Akshay Mahapadi/33893

Aug 30 2016 (10:36PM)
Train Tag: Vikramnagar - Indore Simhasth Special/00111 added by Akshay Mahapadi/33893

Posted by: Akshay Mahapadi~  21 news posts
30-August-2016

Good news for passengers !! it has been decided to run reserved special trains between Mangalore Junction / Madgaon – Vasai Road – Madgaon / Mangalore Junction to clear extra rush of passengers during Ganpati festival in co-ordination with Central & Western Railway. Details of train services are given as under :-
1)
...
more...
Train No. 00112/ 00111 Madgaon – Vasai Road – Madgaon Special Train on Special Fare (Reserved) :-
Train No. 00112 Madgaon – Vasai Road Express will leave from Madgaon 21.00 Hrs on 02nd & 09th September 2016. Train will reach Vasai at 12.50 Hrs. On Next Day.
Train No. 00111 Vasai Road – Madgaon Express will leave from Madgaon 13.45 Hrs on 05th & 12th September 2016. Train will reach Madgaon at 03.00 Hrs. On Next Day.
Train will have 16 Coaches and will halt at Thivim, Sawantwadi Road, Kudal, Sindhudurg, Kankavali, Vaibhavwadi Road, Rajapur Road, Adavali, Ratnagiri, Sangameshwar Road, Savarda, Chiplun, Khed, Veer, Mangaon, Roha, and Panvel Statons.
2) Train No. 00115 /00116 Mangalore Junction – Vasai Road – Mangalore Junction Special Train on Special Fare (Reserved) :-
Train No. 00115 Vasai Road – Mangalore Junction Special will leave from Vasai at 13.45 Hrs on 03rd and 10th September 2016. Train will reach Mangalore 11.00 Hrs on Next Day.
Train No. 00116 Mangalore Junction - Vasai Road Special will leave from Mangalore Junction at 18.00 Hrs on 04th and 11th September 2016. Train will reach Vasai Road 12.50 Hrs on Next Day.
Train will have 16 Coaches and will halt at Suratkal, Udupi, Kundapura, Mookambika Road Byndoor, Bhatkal, Kumta, Karwar, Madgaon, Thivim, Sawantwadi Road, Kudal, Sindhudurg, Kankavali, Vaibhavwadi Road, Rajapur Road, Adavali, Ratnagiri, Sangameshwar Road, Savarda, Chiplun, Khed, Veer, Mangaon, Roha and Panvel Statons.

Passengers may avail of the services.

(L. K. Verma)
Chief Public Relations Officer
Aug 30 2016 (09:27)  Konkan Railway to start track-doubling, electrification work after the monsoon (m.thehindubusinessline.com)
back to top
New Facilities/TechnologyKR/Konkan  -  

News Entry# 278515   Blog Entry# 1976193     
   Tags   Past Edits
Aug 30 2016 (9:27AM)
Station Tag: Roha/ROHA added by Vinod KL~/1264560

Aug 30 2016 (9:27AM)
Station Tag: Veer/VEER added by Vinod KL~/1264560

Posted by: Design Engineer at Johnson controls~  37 news posts
Konkan Railway Corporation Ltd (KRCL), is set to enhance line capacity to handle more trains as it starts track-doubling work on its 740-km route after this year’s monsoon. The rail PSUalso plans to electrify its entire network in three years, says its Chairman and Managing Director Sanjay Gupta. Excerpts from an interview with BusinessLine:
What is the present status of doubling and electrification on the Konkan Railway?
We did Bhoomi Pujan about a year ago. The tenders for doubling — patch doubling between Roha and Veer (46 km) — has been awarded in
...
more...
June. However, work will commence after the monsoon.
For electrification, paper work is on. We will be publishing the tender very soon. We hope to start work post monsoon. Financial closure for both the projects has been done. We will be raising money within a month. This will be financed by 30 per cent equity contribution from us and the remaining would be debt, over the next 4-5 years.
What is the estimated cost?
The estimated cost is about ₹300 crore for the patch doubling, cost of electrification would be between ₹700 crore and ₹800 crore for complete electrification of the 740-km length.
Plus, there would be some interest cost during construction that would get added to the project cost. We hope to complete both these things in three years time.
How are you trying to maximise revenue both passenger and freight?
A majority of the traffic originates in the Indian Railways system and either terminates on KRCL or passes through us. We cannot have a tariff system which is separate from that of the Indian Railways. We are like any other zonal railway from that point of view and distributed accordingly.
Besides, the three major ports situated near KRCL — JNPT, Goa port and Mangalore port — serve a hinterland which does not require them to use KRCL. Once other ports such as Jaigarh (Maharashtra) and Karwar (Karnataka) are developed fully, they will feed our railways system and we can get cargo.
What about running more passenger services?
At present, we are close to saturation. Passenger services now require a different focus — Chiplun- Khed has a different requirement, and so does Sawantwadi. Goa is heavy on week-end traffic and nowadays there is no off-season there. All our trains towards Goa — Konkan Kanya, Mandovi, JanShatabdi, Rajya Rani — are full, barring the AC double-decker.
In Jan Shatabdi and Rajya Rani, there is scope for increasing the length of the train, but they originate from Dadar a station which cannot handle rakes longer than 18 coaches, hence there is a limitation
Maybe in two years once the Panvel terminus comes in, additional trains for Pune/Konkan side would start from there. There is demand for day trains from Chiplun/Ratnagiri.
But we need a maintenance slot at the Mumbai end which is not working out. Once Nagothane- Roha on Central Railway and our section gets doubled, a few diesel multiple unit (DMU) services that are already running between Diva and Roha on Central Railway might be extended.
What are your hiring plans?
We are hiring essential category staff such as loco pilots, guards, TTEs and station masters regularly. KRCL is a young organisation. All of us were recruited together and we have virtually no retirement as of now. We also have plans to spread out our future recruitment in a manner so that we are not adversely affected by mass retirements.
What is your debt position as on date?
It was about ₹1,500 crore in FY16.We will be picking up more debt for doubling and electrification of our network.
Our operating ratio as per the definition of the Indian Railways is 80 per cent (KRCL spends 80 paise to earn one rupee) — excellent as per IR standards. Now in FY17, we also have the impact of the Seventh Pay Commission.
What about revenue from projects outside Konkan Railway?
The J&K project has been doing really well. We made a topline of ₹550 crore from the construction of the Kashmir Railway project last year. This year, we will touch a much higher figure and this will last for another 2-3 years. We also have two NTPC projects at Kudgi between Bijapur and Gadag (about ₹400 crore) and at Gadarwara between Itarsi and Jabalpur (₹400-500 crore).
IR has enough shelf of projects and anybody and everybody with experience of rail projects will be occupied for the next many years, especially North East, doubling and new lines as the Government is investing heavily.

2384 views
Aug 30 2016 (12:04)
Ashish Sharma~   262 blog posts   889 correct pred (69% accurate)
Re# 1976193-1            Tags   Past Edits
Good Initiative, It will help KonKan Railway as well as Indian Railway to speedup its train which uses the Konkan route. Most importantly electrification will provide Eco friendly mode to traction, which reduce air pollution and save diesel and time.
Aug 21 2016 (10:13)  38 more ganpati special trains (twitter.com)
back to top
New/Special TrainsCR/Central  -  

News Entry# 277732     
   Tags   Past Edits
Aug 21 2016 (10:13AM)
Station Tag: Karmali/KRMI added by Akshay Mahapadi/33893

Aug 21 2016 (10:13AM)
Station Tag: Thivim/THVM added by Akshay Mahapadi/33893

Aug 21 2016 (10:13AM)
Station Tag: Madure/MADR added by Akshay Mahapadi/33893

Aug 21 2016 (10:13AM)
Station Tag: Sawantwadi Road/SWV added by Akshay Mahapadi/33893

Aug 21 2016 (10:13AM)
Station Tag: Zarap/ZARP added by Akshay Mahapadi/33893

Aug 21 2016 (10:13AM)
Station Tag: Sindhudurg/SNDD added by Akshay Mahapadi/33893

Aug 21 2016 (10:13AM)
Station Tag: Kudal/KUDL added by Akshay Mahapadi/33893

Aug 21 2016 (10:13AM)
Station Tag: Kankavali/KKW added by Akshay Mahapadi/33893

Aug 21 2016 (10:13AM)
Station Tag: Ratnagiri/RN added by Akshay Mahapadi/33893

Aug 21 2016 (10:13AM)
Station Tag: Sangameshwar Road/SGR added by Akshay Mahapadi/33893

Aug 21 2016 (10:13AM)
Station Tag: Aravali Road/AVRD added by Akshay Mahapadi/33893

Aug 21 2016 (10:13AM)
Station Tag: Savarda/SVX added by Akshay Mahapadi/33893

Aug 21 2016 (10:13AM)
Station Tag: Chiplun/CHI added by Akshay Mahapadi/33893

Aug 21 2016 (10:13AM)
Station Tag: Khed/KHED added by Akshay Mahapadi/33893

Aug 21 2016 (10:13AM)
Station Tag: Veer/VEER added by Akshay Mahapadi/33893

Aug 21 2016 (10:13AM)
Station Tag: Mangaon/MNI added by Akshay Mahapadi/33893

Aug 21 2016 (10:13AM)
Station Tag: Roha/ROHA added by Akshay Mahapadi/33893

Aug 21 2016 (10:13AM)
Station Tag: Panvel Junction/PNVL added by Akshay Mahapadi/33893

Aug 21 2016 (10:13AM)
Station Tag: Thane/TNA added by Akshay Mahapadi/33893

Aug 21 2016 (10:13AM)
Station Tag: Lokmanya Tilak Terminus/LTT added by Akshay Mahapadi/33893

Aug 21 2016 (10:13AM)
Train Tag: Karmali - Mumbai LTT Ganpati Special/01026 added by Akshay Mahapadi/33893

Aug 21 2016 (10:13AM)
Train Tag: Mumbai LTT - Karmali Ganpati Special/01025 added by Akshay Mahapadi/33893

Aug 21 2016 (10:13AM)
Train Tag: Karmali - Mumbai LTT AC Special/01044 added by Akshay Mahapadi/33893

Aug 21 2016 (10:13AM)
Train Tag: Mumbai LTT - Karmali AC Special/01043 added by Akshay Mahapadi/33893

Aug 21 2016 (10:13AM)
Train Tag: Ratnagiri - Mumbai LTT Special/01092 added by Akshay Mahapadi/33893

Aug 21 2016 (10:13AM)
Train Tag: Mumbai LTT - Ratnagiri Special/01091 added by Akshay Mahapadi/33893

Posted by: Akshay Mahapadi~  21 news posts
38 More Special Trains for Ganpati festival,142 announced earlier total 180.Booking opens from 22/8 @sureshpprabhu
SRC : Twitter
Feb 15 2016 (11:48)  Konkan Railway unveils Rs. 1,009cr rail project (nbmcw.com)
back to top
Rail BudgetKR/Konkan  -  

News Entry# 257370   Blog Entry# 1739371     
   Tags   Past Edits
Feb 15 2016 (11:48AM)
Station Tag: Madgaon Junction/MAO added by Mazhar/1139229

Feb 15 2016 (11:48AM)
Station Tag: Vasco-da-Gama/VSG added by Mazhar/1139229

Feb 15 2016 (11:48AM)
Station Tag: Veer/VEER added by Mazhar/1139229

Feb 15 2016 (11:48AM)
Station Tag: Roha/ROHA added by Mazhar/1139229

Posted by: Mazi IRI  34 news posts
In an attempt to expand its operational ambit, Konkan Railways has recently decided to launch the track-doubling work on the Roha-Veer section after the tendering process is completed very shortly.
The scope of work included doubling the track length and electrification will cost a whopping investment worth Rs. 1,009-cr whereby the 49-km long rail section will be doubled at an estimated cost of Rs. 300-cr and that the electrification work for the whole of Konkan Railway's route with a length of 739 km will cost Rs. 709cr, Interim CMD and Director of Operations, KRCL, Sanjay Gupta, said adding that the track doubling would begin from the Roha end of KRCL as the work between Panvel and Roha is likely to be
...
more...
completed by Central Railway soon.
As a matter of fact, the commencement from the Roha-end would ensure continuity and that the track doubling seeks to enhance capacity by 2.5 times and improve average speed besides enabling KRCL to handle freight traffic from port connectivity. Alongside the electrification is also likely to commence in the next few months.

4198 views
Feb 15 2016 (11:55)
Kishor*^~   4626 blog posts   123 correct pred (63% accurate)
Re# 1739371-1            Tags   Past Edits
once track is doubled the passengers will be able to enjoy the Speed and time saving on this route. hopefully 'Goods Traffic' won't occupy the time of speeding trains
Jan 18 2016 (11:51)  रेल्वेच्या धडकेने आदिवासीचा मृत्यू (online4.esakal.com)
back to top
Crime/AccidentsKR/Konkan  -  

News Entry# 254290     
   Tags   Past Edits
Jan 18 2016 (11:51AM)
Station Tag: Veer/VEER added by ameyambre/16020

Posted by: ameyambre~  1802 news posts
महाड - कोकण रेल्वेमार्गावर महाड तालुक्‍यातील वीर-टेंबेवाडी येथील रघुनाथ विठ्ठल जाधव (वय 28) याला एर्नाकुलम एक्‍स्प्रेसने धडक दिल्यामुळे त्याचा मृत्यू झाला. शुक्रवारी (ता. 15) दुपारी कॉफिला रेती बंदरासमोर हा अपघात झाला. रघुनाथ वीटभट्टीवर कामाला होता. तो रेल्वेमार्गावरून दासगावातून वीरकडे पायी जात होता. त्या वेळी मुंबईकडे जाणाऱ्या एक्‍स्प्रेसने त्याला धडक दिली.
Jul 15 2014 (09:40)  90 SPECIAL TRAINS DURING GANPATI FESTIVAL (www.cr.indianrailways.gov.in)
back to top
New/Special TrainsCR/Central  -  IR Press Release  

News Entry# 185252     
   Tags   Past Edits
Jul 15 2014 (9:40AM)
Station Tag: Ratnagiri/RN added by maheshdhanavade10/538660

Jul 15 2014 (9:40AM)
Station Tag: Thane/TNA added by maheshdhanavade10/538660

Jul 15 2014 (9:40AM)
Station Tag: Mumbai Dadar Central/DR added by maheshdhanavade10/538660

Jul 15 2014 (9:40AM)
Station Tag: Mumbai CST/CSTM added by maheshdhanavade10/538660

Jul 15 2014 (9:40AM)
Station Tag: Thivim/THVM added by maheshdhanavade10/538660

Jul 15 2014 (9:40AM)
Station Tag: Pernem/PERN added by maheshdhanavade10/538660

Jul 15 2014 (9:40AM)
Station Tag: Madure/MADR added by maheshdhanavade10/538660

Jul 15 2014 (9:40AM)
Station Tag: Sawantwadi Road/SWV added by maheshdhanavade10/538660

Jul 15 2014 (9:40AM)
Station Tag: Panvel Junction/PNVL added by maheshdhanavade10/538660

Jul 15 2014 (9:40AM)
Station Tag: Mangaon/MNI added by maheshdhanavade10/538660

Jul 15 2014 (9:40AM)
Station Tag: Zarap/ZARP added by maheshdhanavade10/538660

Jul 15 2014 (9:40AM)
Station Tag: Sindhudurg/SNDD added by maheshdhanavade10/538660

Jul 15 2014 (9:40AM)
Station Tag: Nandgaon Road/NAN added by maheshdhanavade10/538660

Jul 15 2014 (9:40AM)
Station Tag: Vaibhavwadi Road/VBW added by maheshdhanavade10/538660

Jul 15 2014 (9:40AM)
Station Tag: Rajapur Road/RAJP added by maheshdhanavade10/538660

Jul 15 2014 (9:40AM)
Station Tag: Vilavade/VID added by maheshdhanavade10/538660

Jul 15 2014 (9:40AM)
Station Tag: Adavali/ADVI added by maheshdhanavade10/538660

Jul 15 2014 (9:40AM)
Station Tag: Veer/VEER added by maheshdhanavade10/538660

Jul 15 2014 (9:40AM)
Station Tag: Aravali Road/AVRD added by maheshdhanavade10/538660

Jul 15 2014 (9:40AM)
Station Tag: Savarda/SVX added by maheshdhanavade10/538660

Jul 15 2014 (9:40AM)
Station Tag: Kudal/KUDL added by maheshdhanavade10/538660

Jul 15 2014 (9:40AM)
Station Tag: Kankavali/KKW added by maheshdhanavade10/538660

Jul 15 2014 (9:40AM)
Station Tag: Ratnagiri/RN added by maheshdhanavade10/538660

Jul 15 2014 (9:40AM)
Station Tag: Chiplun/CHI added by maheshdhanavade10/538660

Jul 15 2014 (9:40AM)
Station Tag: Khed/KHED added by maheshdhanavade10/538660

Jul 15 2014 (9:40AM)
Station Tag: Roha/ROHA added by maheshdhanavade10/538660

Jul 15 2014 (9:40AM)
Station Tag: Sangameshwar Road/SGR added by maheshdhanavade10/538660

Jul 15 2014 (9:40AM)
Station Tag: Mumbai Lokmanya Tilak Terminus/LTT added by maheshdhanavade10/538660

Jul 15 2014 (9:40AM)
Train Tag: Ratnagiri - Mumbai LTT Ganpati Special/01038 added by maheshdhanavade10/538660

Jul 15 2014 (9:40AM)
Train Tag: Mumbai CST - Nagpur (One Trip) Special/01037 added by maheshdhanavade10/538660

Jul 15 2014 (9:40AM)
Train Tag: Pernem - Mumbai LTT Ganpati Special/01044 added by maheshdhanavade10/538660

Jul 15 2014 (9:40AM)
Train Tag: Mumbai LTT - Pernem Ganpati Special/01043 added by maheshdhanavade10/538660

Jul 15 2014 (9:40AM)
Train Tag: Pernem - Mumbai CST Ganpati Special/01042 added by maheshdhanavade10/538660

Jul 15 2014 (9:40AM)
Train Tag: Mumbai CST - Pernem Ganpati Special/01041 added by maheshdhanavade10/538660

Jul 15 2014 (9:40AM)
Train Tag: Pernem - Mumbai LTT Ganpati Special/01040 added by maheshdhanavade10/538660

Jul 15 2014 (9:40AM)
Train Tag: Mumbai LTT - Pernem Ganpati Special/01039 added by maheshdhanavade10/538660

Jul 15 2014 (9:40AM)
Train Tag: Madgaon - Mumbai CST Ganpati Special/01034 added by maheshdhanavade10/538660

Jul 15 2014 (9:40AM)
Train Tag: Mumbai CST - Madgaon Ganpati Special/01033 added by maheshdhanavade10/538660

Posted by: maheshdhanavade10  13 news posts
CR TO RUN 90 SPECIAL TRAINS DURING GANPATI FESTIVAL
BOOKING OPENING DATE FOR RESERVED SPECIAL TRAINS WILL BE ANNOUNCED LATER

Central Railway has decided to run 52 Reserved Special Trains and 38 Unreserved Special Trains during the ensuing Ganpati Festival to clear the extra rush of Passengers. The details are as under –
...
more...

A) RESERVED SPECIAL TRAINS BETWEEN MUMBAI – MADGAON (28 Services)

01033 Special will leave Chhatrapati Shivaji Terminus Mumbai at 00.20 hrs for Six days (except Thursday) from 26.8.2014 to 10.9.2014 (14 trips) and will reach Madgaon at 14.10 hrs same day.

01034 Special will leave Madgaon at 14.40 hrs (Except Thursday) from 26.8.2014 to 10.9.2014 (14 trips) and will arrive Chhatrapati Shivaji Terminus Mumbai at 04.35 hrs next day.

HALTS: Dadar, Thane, Panvel, Roha, Mangaon, Veer, Khed, Chiplun, Savarde, Aravali Road, Sangameshwar, Ratnagiri, Adavali, Vilawade, Rajapur Road, Vaibhavwadi Road, Nandgaon Road, Kankavali, Sindhudurg, Kudal, Zarap, Sawantwadi Road, Madure, Pernem, Thivim and Karmali.

COMPOSITION: One AC-2 Tier, Two AC-3 Tier, 10 Sleeper class, 3 General Second Class and 2 General Second Class cum Guard’s Brake Vans

B) RESERVED SPECIAL TRAINS BETWEEN LOKMANYA TILAK TERMINUS – KARMALI (Goa) (6 SERVICES)

01039 Special will leave Lokmanya Tilak Terminus at 13.00 hrs o­n 25.8.2014, 1.9.2014 and 8.9.2014 (3 Trips) and will arrive Karmali at 01.40 hrs next day.

01040 Special will leave Karmali at 10.00 hrs o­n 26.8.2014, 2.9.2014 and 9.9.2014 (3 Trips) and will arrive Lokmanya Tilak Temrinus at 23.15 hrs same day.

HALTS: Thane, Panvel, Roha, Mangaon, Veer, Khed, Chiplun, Savarde, Aravali Road, Sangameshwar, Ratnagiri, Adavali, Vilawade, Rajapur Road, Vaibhavwadi Road, Nandgaon Road, Kankavali, Sindhudurg, Kudal, Zarap, Sawantwadi Road, Madure, Pernem and Thivim.

COMPOSITION: One AC-2 Tier, o­ne AC-3 Tier, 13 Sleeper class, 5 General Second Class and 2 General Second Class cum Guard’s Brake Vanss.

C) RESERVED SPECIAL TRAINS BETWEEN MUMBAI AND KARMALI (Goa) (10 SERVICES)

01041 Bi-weekly Special will leave Chhatrapati Shivaji Terminus Mumbai at 12.50 hrs o­n every Tuesday & Saturday o­n 26th , 30th August, 2nd, 6th and 9th September 2014 (5 Trips) and will arrive Karmali at 01.40 hrs next day.

01042 Bi-weekly Special will leave Karmali at 10.00 hrs o­n every Wednesday& Sunday o­n 27th, 31st August, 3rd, 7th and 10th September 2014 (5 Trips) and will arrive Chhatrapati Shivaji Terminus Mumbai at 23.20 hrs same day.

HALTS: Dadar, Thane, Panvel, Roha (for 01041 o­nly), Mangaon, Veer, Khed, Chiplun, Savarde, Aravali Road, Sangameshwar, Ratnagiri, Adavali, Vilawade, Rajapur Road, Vaibhavwadi Road, Nandgaon Road, Kankavali, Sindhudurg, Kudal, Zarap, Sawantwadi Road, Madure, Pernem and Thivim.

COMPOSITION: One First AC cum AC-2 Tier, o­ne AC-2 Tier, Two AC-3 Tier, 12 Sleeper class, 5 General Second Class and 2 General Second Class cum Guard’s Brake Vanss

D) RESERVED WEEKLY SPECIAL TRAINS BETWEEN LOKMANYA TILAK TERMINUS AND KARMALI (6 SERVICES)

01043 Weekly Special will leave Lokmanya Tilak Terminus at 13.00 hrs o­n o­n 28.8.2014, 4.9.2014 and 11.9.2014 (3 Trips) and will arrive Karmali at 01.40 hrs next day.

01044 Weekly Special will leave Karmali at 10.00 hrs o­n 29.8.2014, 5.9.2014 and 12.9.2014 (3 Trips) and will arrive Lokmanya Tilak Temrinus at 23.15 hrs same day.

HALTS: Thane, Panvel, Roha (for 01043 o­nly), Mangaon, Veer, Khed, Chiplun, Savarde, Aravali Road, Sangameshwar, Ratnagiri, Adavali, Vilawade, Rajapur Road, Vaibhavwadi Road, Nandgaon Road, Kankavali, Sindhudurg, Kudal, Zarap, Sawantwadi Road, Madure, Pernem and Thivim.

COMPOSITION: One AC-2 Tier, Two AC-3 Tier, 7 Sleeper class, 6 General Second Class and 2 General Second Class cum Guard’s Brake Vanss.

E) UNRESERVED SPECIAL TRAINS BETWEEN LOKMANYA TILAK TERMINUS AND RATNAGIRI (20 Services)

01037 Unreserved Special will leave Lokmanya Tilak Terminus at 01.00 hrs o­n 23, 25, 27, 29 and 31.8.2014 & 2, 5, 7, 9 and 12.9.2014 (10 trips) and will arrive Ratnagiri at 09.05 hrs same day.

01038 Unreserved Special will leave Ratnagiri at 11.30 hrs o­n 23, 25, 27, 29 and 31.8.2014 & 2, 5, 7, 9 and 12.9.2014 (10 trips) and will arrive Lokmanya Tilak Terminus at 19.20 hrs Same day.

HALTS: Thane, Panvel, Roha, Mangaon, Veer, Khed, Chiplun, Savarde, Aravali Road and Sangameshwar.

COMPOSITION: 12 Unreserved Second Seating, 4 General Second Class and 2 General Second Class cum Guard’s brake Vanss.

F) UNRESERVED SPECIAL TRAINS BETWEEN DADAR AND SAWANTWADI ROAD (TRI-WEEKLY) (18 Services)

01003 Unreserved Tri-Weekly Special will leave Dadar at 07.50 hrs (Sunday, Tuesday and Friday) from 24.8.2014 to 12.9.2014 (9 trips) and will arrive Sawantwadi Road at 20.30 hrs same day.

01004 Unreserved Tri-weekly Special will leave Sawantwadi Road at 04.50 hrs (Monday, Wednesday and Saturday) from 25.8.2014 to 13.9.2014 (9 trips) and will arrive Dadar at 16.10 hrs same day.

HALTS: Thane, Panvel, Roha, Mangaon, Veer, Khed, Chiplun, Savarde, Aravali Road, Sangameshwar, Ratnagiri, Adavali, Vilawade, Rajapur Road, Vaibhavwadi Road, Nandgaon Road, Kankavli, Sindhudurg, Kudal and Zarap

COMPOSITION: 7 Unreserved Second Class Seating, 4 General Second Class and 2 General Second Class cum Guard’s brake Vans

G) RESERVED SPECIALS BETWEEN MUMBAI AND KOLHAPUR (2 Services)

01205 Special will leave Lokmanya Tilak Terminus at 16.40 hrs o­n 28.8.2014 and arrive Shri Chhatrapati Shahu Maharaj Terminus (Kolhapur) at 04.35 hrs next day.

01206 Special will leave Shri Chhatrapati Shahu Maharaj Terminus (Kolhapur) at 09.05 hrs o­n 29.8.2014 and arrive Lokmanya Tilak Terminus at 23.55 hrs same day.

HALTS: Thane, Kalyan, Lonavala, Pune, Satara, Karad, Sangli and Miraj.

COMPOSITION: o­ne AC-2 Tier, Two AC-3 Tier, 13 Sleeper Class, 3 General Second Class, 2 General Second Class cum Guard’s Brake van.

RESERVATION: Booking Opening Date for all Reserved Special Trains will be announced later.
-----------
Date: July 14, 2014
This news comes to you from Public Relations Department, Central Railway, Chhatrapati Shivaji Terminus Mumbai.
Page#    Showing 1 to 9 of 9 News Items  

Scroll to Top
Scroll to Bottom


Go to Desktop site