Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Yeh dil maange more (RailFans, while ending their trip) - Kirti Solanki

Search Trains
Post PNR
Side View; Large TB; EOG/SLR; Outside of Train; Standing;
Entry# 3752322-0
Medium; Side View; Small TB; 3 AC; Outside of Train; Standing;
Entry# 4256475-0


Availability Calendar
Search MAS to TPTY
Return# 16204
PDF Download

16203/Garudadri Express
गरुडाद्रि एक्सप्रेस

MAS/MGR Chennai Central --> TPTY/Tirupati

Updated: Oct 03 2023 (00:18) by BangaloreMail^~
Oct 03 2023 (00:18)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips
Other Trains in the News
This is the Shortest Route between MAS and TPTY.
Travel Time: 3h 55m     8 halts
Distance: 147 km     Avg Speed: 37 km/hr
Max Permissible Speed: 110 km/hr between PER/Perambur and RU/Renigunta Junction
Departs @ 16:35
MGR Chennai Central/MAS 
Platform# 7
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Arrives @ 20:30
TPTY/Tirupati 
Platform# 2
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Type: Mail/Express
Rake Zone: SWR/South Western
Latest News
(You need to double-check/verify this info yourself)
Train No. 16203 Dr MGR Chennai Central - Tirupati Express leaving Dr MGR Chennai Central at 16.35 hrs on 27th, 28th February, 12th and 13th March, 2024 is fully cancelled.
Thu Feb 22, 2024 (05:18PM)
News History
🔹Due to the ongoing Michuang cyclone, Train no. 16203/Garudadri Express JCO 06/12/2023 will be fully cancelled until further official notice.
Wed Dec 06, 2023 (11:06AM)
🔹Train no. 16203/Garudadri Express JCO 28/09/2023 to 12/10/2023 will be fully cancelled.
Thu Sep 28, 2023 (08:28AM)
Train No.16203 MGR Chennai Central - Tirupati Garudadri Express leaving MGR Chennai Central at 4.35pm on September 12, 13, 14, 15, 20, 21, 23 & 25 is fully cancelled for launching temporary girder and construction of subway between Somanayakkanpatti and Jolarpettai Stations of Jolarpettai - KSR Bengaluru section.
Sun Sep 10, 2023
...
more...
(11:05PM)
🔹Train No. 16203 Dr MGR Chennai Central – Tirupati Express leaving Dr. MGR Chennai Central at 16.35 hrs from 11th August 2023 is fully cancelled
Fri Aug 11, 2023 (01:36AM)
JCO 12/07/2023 to 10/08/2023 will remain fully cancelled
Tue Jul 11, 2023 (03:45PM)
Train No. 16204/16203 Tirupati – MGR Chennai Central – Tirupati Daily Express will be augmented temporarily with o­ne Second Class Sleeper coach with effect from 24.05.2022 to 28.06.2022 from Tirupati and with effect from 24.05.2022 to 28.06.2022 from MGR Chennai Central.
Mon May 23, 2022 (07:17PM)
Restored w.e.f 26 June 2021
Tue Jun 22, 2021 (06:20PM)
0 Follows
Rating: 4.0/5 (23 votes)
cleanliness - excellent (4)
punctuality - good (4)
food - average (3)
ticket avbl - excellent (4)
u/r coach - good (3)
railfanning - good (4)
safety - good (4)
Bedroll/Linen: Don't know change
Pantry/Catering
✕ Pantry Car
✕ On-board Catering
✓ E-Catering
E-Catering is Only Available at MAS, RU & TPTY.
ICF Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
 GS
  3
 GS
  4
 H1
  5
 A1
  6
 B1
  7
 B2
  8
 S1
  9
 S2
 18
S11
 17
S10
 16
 S9
 15
 S8
 14
 S7
 13
 S6
 12
 S5
 11
 S4
 10
 S3
 19
 D1
 20
 GS
 21
SLR
  RU
Loco/Rake Reversals
RU/Renigunta Junction

Show ALL intermediate Stations

8 halts. 45 intermediate Stations between MGR Chennai Central and Tirupati
#1
0.0 km
/==/
Zone: SR
PF# 7
Speed: 25
Elev: 3m

16:35
Day: 1
5.5 km
3 intermediate stations
00:13
#2
5.5 km
/==/
Zone: SR
PF# 1
Speed: 94
Elev: 7m
16:48
16:50
Day: 1
36.1 km
17 intermediate stations
00:23
#3
41.6 km
/==/
Zone: SR
PF# 2
Speed: 70
Elev: 47m
17:13
17:15
Day: 1
27.0 km
8 intermediate stations
00:23
#4
68.6 km
/==/
Zone: SR
PF# 3
Speed: 48
Elev: 85m
17:38
17:40
Day: 1
14.4 km
2 intermediate stations
00:18
#5
83.0 km
/==/
Zone: SR
PF# 1
Speed: 59
Elev: 88m
17:58
18:00
Day: 1
14.8 km
2 intermediate stations
00:15
#6
97.8 km
/==/
Zone: SR
PF# 3
Speed: 31
18:15
18:16
Day: 1
1.5 km
0 intermediate stations
00:03
#7
99.3 km
/==/
Zone: SR
PF# 2
Speed: 47
Elev: 117m
18:19
18:20
Day: 1
14.0 km
1 intermediate stations
00:18
#8
113.4 km
/==/
Zone: SR
PF# 1
Speed: 35
Elev: 152m
18:38
18:40
Day: 1
23.4 km
3 intermediate stations
00:40
#9
136.8 km
/==/
Zone: SCR
PF# 3
Speed: 10
Elev: 115m
19:20
19:30
Day: 1
Rake Reversal (the train reverses direction)
9.8 km
1 intermediate stations
01:00
#10
146.6 km
/==/
Zone: SCR
PF# 2

Elev: 163m
20:30

Day: 1
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy