Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Bangalore Namma Metro - ಸ್ವಲ್ಪ ಜಾಗ ಕೊಡಿ

Search Trains
Post PNR
IMAGINARY Train. NOT an ACTUAL running Train.
(Imaginary Trains are created by RailFans to explore various alternative Train Routes and TTs. Such trains are NOT ACTUALLY RUNNING on the tracks.)
Availability Calendar
Search CSMT to TN
Return# IMG16357-1468766
PDF Download

IMG16358-1468766/♥♥Mumbai CSMT = Tuticorin Antyodaya Express, (Via-Tirupati)♥♥
मुंबई सीएसएमटी = तूतीकोरिन अंत्योदय एक्सप्रेस, (वाया-तिरुपति)

CSMT/Mumbai CSM Terminus --> TN/Tuticorin

IMAGINARY Train.
VadivelKolanji_
Jan 14 2022 (23:27)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips
The Shortest Route between CSMT and TN is 346 km (18%) shorter.
Travel Time: 32h 30m     56 halts
Distance: 1975 km     Avg Speed: 61 km/hr
Max Permissible Speed: n/a
Departs @ 10:00
Mumbai CSM Terminus/CSMT 
Platform# --
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Arrives @ 18:30 +1 night
TN/Tuticorin 
Platform# --
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Type: Antyodaya
Rake Zone: SR/Southern
Practical - Can Easily be Introduced by IR
First Direct Train Connectivity Between From Mumbai CSMT To Tuticorin Antyodya SF Express, (Via-Tirupati)
0 Follows
9
Bedroll/Linen: Don't know change
Pantry/Catering
✕ Pantry Car
✓ On-board Catering
✕ E-Catering
LHB Rake

Rake/Coach Position

  0
EOG
  1
 D1
  2
 D2
  3
 D3
  4
 D4
  5
 D5
  6
 D6
  7
 D7
  8
 D8
  9
 D9
 18
EOG
 17
GEN
 16
GEN
 15
GEN
 14
GEN
 13
GEN
 12
D12
 11
D11
 10
D10
RSA - Rake Sharing

Show ALL intermediate Stations

56 halts. 326 intermediate Stations between Mumbai CSM Terminus and Tuticorin
#1
0.0 km
/==/
Zone: CR
Speed: 42
Elev: 14m

10:00
Day: 1
9.0 km
9 intermediate stations
00:13
#2
9.0 km
/==/
Zone: CR
Speed: 63
Elev: 7m
10:13
10:15
Day: 1
24.3 km
12 intermediate stations
00:23
#3
33.3 km
/==/
Zone: CR
Speed: 54
Elev: 7m
10:38
10:40
Day: 1
18.1 km
9 intermediate stations
00:20
#4
51.5 km
/==/
Zone: CR
Speed: 62
Elev: 9m
11:00
11:03
Day: 1
46.5 km
9 intermediate stations
00:45
#5
98.0 km
/==/
Zone: CR
Speed: 56
Elev: 52m
11:48
11:50
Day: 1
Loco Bankrs Attached
27.8 km
5 intermediate stations
00:30
#6
125.8 km
/==/
Zone: CR
Speed: 56
Elev: 623m
12:20
12:22
Day: 1
Loco Bankres Detached
63.7 km
17 intermediate stations
01:08
#7
189.5 km
/==/
Zone: CR
Speed: 70
Elev: 560m
13:30
13:35
Day: 1
Remote Quota Starting and Charting Station
75.5 km
15 intermediate stations
01:05
#8
265.0 km
/==/
Zone: CR
Speed: 74
Elev: 515m
14:40
14:45
Day: 1
73.8 km
8 intermediate stations
01:00
#9
338.8 km
/==/
Zone: CR
Speed: 86
Elev: 526m
15:45
15:46
Day: 1
34.3 km
3 intermediate stations
00:24
#10
373.1 km
/==/
Zone: CR
Speed: 79
Elev: 511m
16:10
16:12
Day: 1
15.8 km
1 intermediate stations
00:12
#11
388.9 km
/==/
Zone: CR
Speed: 82
Elev: 481m
16:24
16:25
Day: 1
29.9 km
3 intermediate stations
00:22
#12
418.9 km
/==/
Zone: CR
Speed: 62
Elev: 457m
16:47
16:48
Day: 1
33.1 km
3 intermediate stations
00:32
#13
451.9 km
/==/
Zone: CR
Speed: 83
Elev: 455m
17:20
17:30
Day: 1
Remote Quota Starting and Charting Station
15.1 km
2 intermediate stations
00:11
#14
467.1 km
/==/
Zone: CR
Speed: 72
Elev: 467m
17:41
17:42
Day: 1
Xing with 11020/Konark Express | Daily
20.3 km
2 intermediate stations
00:17
#15
487.4 km
/==/
Zone: CR
Speed: 70
Elev: 456m
17:59
18:00
Day: 1
27.8 km
2 intermediate stations
00:24
#16
515.2 km
/==/
Zone: CR
Speed: 73
Elev: 451m
18:24
18:25
Day: 1
23.0 km
2 intermediate stations
00:19
#17
538.3 km
/==/
Zone: CR
Speed: 64
Elev: 445m
18:44
18:45
Day: 1
26.7 km
3 intermediate stations
00:25
#18
564.9 km
/==/
Zone: CR
Speed: 72
Elev: 454m
19:10
19:12
Day: 1
26.6 km
2 intermediate stations
00:22
#19
591.5 km
/==/
Zone: CR
Speed: 62
Elev: 404m
19:34
19:35
Day: 1
10.3 km
0 intermediate stations
00:10
#20
601.8 km
/==/
Zone: CR
Speed: 67
Elev: 428m
19:45
19:50
Day: 1
Remote Quota Starting and Charting Station
38.9 km
4 intermediate stations
00:35
#21
640.7 km
/==/
Zone: SCR
Speed: 76
Elev: 365m
20:25
20:26
Day: 1
68.6 km
8 intermediate stations
00:54
#22
709.4 km
/==/
Zone: SCR
Speed: 67
Elev: 407m
21:20
21:22
Day: 1
28.9 km
3 intermediate stations
00:26
#23
738.2 km
/==/
Zone: SCR
Speed: 72
Elev: 332m
21:48
21:50
Day: 1
40.8 km
4 intermediate stations
00:34
#24
779.0 km
/==/
Zone: SCR
Speed: 63
Elev: 421m
22:24
22:25
Day: 1
52.1 km
6 intermediate stations
00:50
#25
831.1 km
/==/
Zone: SCR
Speed: 71
Elev: 451m
23:15
23:25
Day: 1
28.4 km
3 intermediate stations
00:24
#26
859.5 km
/==/
Zone: SCR
Speed: 67
Elev: 365m
23:49
23:50
Day: 1
48.0 km
7 intermediate stations
00:43
#27
907.5 km
/==/
Zone: SCR
Speed: 74
Elev: 237m
00:33
00:34
Day: 2
68.9 km
8 intermediate stations
00:56
#28
976.4 km
/==/
Zone: SCR
Speed: 69
01:30
01:31
Day: 2
39.3 km
4 intermediate stations
00:34
#29
1015.8 km
/==/
Zone: SCR
Speed: 65
Elev: 137m
02:05
02:07
Day: 2
51.0 km
6 intermediate stations
00:47
#30
1066.7 km
/==/
Zone: SCR
Speed: 69
Elev: 145m
02:54
02:55
Day: 2
33.6 km
4 intermediate stations
00:29
#31
1100.3 km
/==/
Zone: SCR
Speed: 70
Elev: 198m
03:24
03:25
Day: 2
40.9 km
4 intermediate stations
00:35
#32
1141.2 km
/==/
Zone: SCR
Speed: 45
Elev: 115m
04:00
04:02
Day: 2
9.8 km
1 intermediate stations
00:13
#33
1151.0 km
/==/
Zone: SCR
Speed: 52
Elev: 163m
04:15
04:30
Day: 2
Remote Quota Starting and Charting Station
41.9 km
5 intermediate stations
00:48
#34
1192.9 km
/--/
Zone: SCR
Speed: 67
05:18
05:20
Day: 2
30.0 km
2 intermediate stations
00:27
#35
1222.9 km
/--/
Zone: SCR
Speed: 53
05:47
05:48
Day: 2
32.8 km
4 intermediate stations
00:37
#36
1255.7 km
/--/
Zone: SR
Speed: 42
Elev: 215m
06:25
06:30
Day: 2
Remote Quota Starting and Charting Station
Xing with 16780/Rameswaram - Tirupati Express | Mon,Fri,Sat
9.9 km
1 intermediate stations
00:14
#37
1265.6 km
/--/
Zone: SR
Speed: 63
Elev: 218m
06:44
06:45
Day: 2
35.7 km
5 intermediate stations
00:34
#38
1301.4 km
/--/
Zone: SR
Speed: 69
Elev: 173m
07:19
07:20
Day: 2
16.2 km
1 intermediate stations
00:14
#39
1317.6 km
/--/
Zone: SR
Speed: 75
Elev: 170m
07:34
07:35
Day: 2
31.4 km
2 intermediate stations
00:25
#40
1348.9 km
/--/
Zone: SR
Speed: 68
Elev: 170m
08:00
08:03
Day: 2
33.9 km
3 intermediate stations
00:30
#41
1382.8 km
/--/
Zone: SR
Speed: 58
Elev: 99m
08:33
08:35
Day: 2
33.6 km
5 intermediate stations
00:35
#42
1416.4 km
/--/
Zone: SR
Speed: 63
Elev: 43m
09:10
09:25
Day: 2
Remote Quota Starting and Charting Station PAX Extended Way 35KM PDY
19.9 km
3 intermediate stations
00:19
#43
1436.3 km
/--/
Zone: SR
Speed: 67
Elev: 27m
09:44
09:45
Day: 2
26.8 km
4 intermediate stations
00:24
#44
1463.2 km
/--/
Zone: SR
Speed: 70
Elev: 2m
10:09
10:10
Day: 2
38.5 km
5 intermediate stations
00:33
#45
1501.7 km
/--/
Zone: SR
Speed: 68
Elev: 5m
10:43
10:45
Day: 2
17.0 km
3 intermediate stations
00:15
#46
1518.7 km
/--/
Zone: SR
Speed: 71
Elev: 6m
11:00
11:01
Day: 2
20.0 km
3 intermediate stations
00:17
#47
1538.7 km
/--/
Zone: SR
Speed: 67
Elev: 13m
11:18
11:20
Day: 2
31.2 km
6 intermediate stations
00:28
#48
1569.9 km
/--/
Zone: SR
Speed: 67
Elev: 32m
11:48
11:50
Day: 2
39.3 km
8 intermediate stations
00:35
#49
1609.3 km
/--/
Zone: SR
Speed: 56
Elev: 57m
12:25
12:27
Day: 2
49.7 km
8 intermediate stations
00:53
#50
1659.0 km
/==/
Zone: SR
Speed: 64
Elev: 86m
13:20
13:30
Day: 2
Remote Quota Starting and Charting Station
36.4 km
3 intermediate stations
00:34
#51
1695.4 km
/==/
Zone: SR
Speed: 66
Elev: 160m
14:04
14:05
Day: 2
57.9 km
6 intermediate stations
00:53
#52
1753.3 km
/==/
Zone: SR
Speed: 68
Elev: 280m
14:58
15:00
Day: 2
62.3 km
9 intermediate stations
00:55
#53
1815.6 km
/==/
Zone: SR
Speed: 65
Elev: 133m
15:55
16:00
Day: 2
Remote Quota Starting and Charting Station
43.4 km
4 intermediate stations
00:40
#54
1859.0 km
/==/
Zone: SR
Speed: 70
Elev: 101m
16:40
16:42
Day: 2
26.9 km
1 intermediate stations
00:23
#55
1886.0 km
/==/
Zone: SR
Speed: 72
17:05
17:06
Day: 2
21.6 km
1 intermediate stations
00:18
#56
1907.6 km
/==/
Zone: SR
Speed: 66
Elev: 90m
17:24
17:25
Day: 2
36.1 km
3 intermediate stations
00:33
#57
1943.6 km
/==/
Zone: SR
Speed: 62
17:58
18:00
Day: 2
31.2 km
6 intermediate stations
00:30
#58
1974.8 km
/==/
Zone: SR

Elev: 1m
18:30

Day: 2
Destination
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy