Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal - Train Search + Time-Tables + Avl Calendar + Forum

पश्चिम रेलवे की शान, पश्चिम सुपरफास्ट एक्सप्रेस मेरी जान - Abdul Rehman

Search Trains
Post PNR
Night Pic; Side View; Small TB; UnReserved; Outside of Train; Standing at Station;
Entry# 3783206-0
Medium; Side View; Small TB; 1 AC/Ex CC; Outside of Train;
Entry# 4466732-0


Availability Calendar
Search MYS to SNSI
Return# 16218
PDF Download

06201⇒16217/Mysuru - Sainagar Shirdi Weekly Express
मैसूरु - साईनगर शिरडी साप्ताहिक एक्सप्रेस

MYS/Mysuru Junction (Mysore) --> SNSI/Sainagar Shirdi Terminus

Updated: Mar 02 (22:13) by KarnavatiExpress^~
Mar 02 (22:13)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips
Other Trains in the News
The Shortest Route between MYS and SNSI is 252 km (18%) shorter.
Travel Time: 29h 50m     25 halts
Distance: 1426 km     Avg Speed: 48 km/hr
Max Permissible Speed: 110 km/hr
Departs @ 05:20
Mysuru Junction (Mysore)/MYS 
Platform# --
 
Mon
 
 
 
 
 
Arrives @ 11:10 +1 night
SNSI/Sainagar Shirdi Trm 
Platform# 1
 
 
Tue
 
 
 
 
Type: Mail/Express
Rake Zone: SWR/South Western
Latest News
(You need to double-check/verify this info yourself)
16217 Mysuru - Sai Nagar Shirdi Weekly Express Will Stop At *Almatti Railway station* W.E.F - 11.03.24.
Tue Mar 05, 2024 (10:39PM)
News History
16217 - Mysuru - Sainagar Shirdi Express is diverted via Ballari Bypass and provided 5 Minutes halt at Ballari Cantonment Halt untill July 29th 2024
Sat Feb 03, 2024 (06:12PM)
🔹 Extension of Diversion Period upto January 2024.🔹 🔹16517/16 Mysuru -Sai Nagar Shirdi -Mysuru Express Diverted Via Ballari Bypass and Provided 5 Minutes Stop at #BallariCantonment Railway station.
Sat Oct 21, 2023 (11:38AM)
Train No. 16217 Mysuru – Sainagar Shirdi Weekly Express, starting from Mysuru o­n March 27, 2023 will be cancelled.
Sat Mar 18, 2023 (03:06PM)
🔹Train No. 16217 Mysuru - Sainagar Shirdi Weekly Express commencing journey from Mysuru on 10.10.2022 & 17.10.2022 will be diverted to run via Kurduwadi, Latur Road, Parbhani, Ankai, Manmad and Puntamba stations, skipping stoppages at Daund and Ahmadnagar and Belapur Stations.
Sat Oct 08, 2022 (12:24PM)
Train 16217 starting on 10 & 17 Oct 2022 will be diverted by KWV-LTRR-PBN-ANK-MMR-PB. Please check before bookings and start journey.
Tue Oct 04, 2022 (11:31AM)
JCO 8.8.2022 is cancelled.
Sat Aug 06, 2022 (06:06AM)
📢⚟ JCO 18.10.2021 & 25.10.2021 is cancelled due to NI work.
Sat Oct 09, 2021 (08:48PM)
1 Follows
Rating: 3.5/5 (37 votes)
cleanliness - good (6)
punctuality - good (6)
food - average (6)
ticket avbl - good (6)
u/r coach - poor (1)
railfanning - good (7)
safety - good (6)
Bedroll/Linen: AVAILABLE change
Inaugural Run
Mon Jul 09, 2012
Pantry/Catering
✓ Pantry Car
✓ On-board Catering
✓ E-Catering
LHB Rake

Rake/Coach Position

  0
  L
  1
EOG
  2
HA1
  3
 A1
  4
 A2
  5
 B1
  6
 B2
  7
 B3
  8
 B4
  9
 B5
 18
 S7
 17
 S6
 16
 S5
 15
 S4
 14
 S3
 13
 S2
 12
 S1
 11
 PC
 10
 B6
 19
 GN
 20
 GN
 21
EOG
  PB
Loco
MYS -> SBCSBC -> SNSI
Loco/Rake Reversals
PB/Puntamba Junction

Show ALL intermediate Stations

25 halts. 204 intermediate Stations between Mysuru Junction (Mysore) and Sainagar Shirdi Terminus
#1
0.0 km
/==/
Zone: SWR
Speed: 58
Elev: 759m

05:20
Day: 1
44.6 km
10 intermediate stations
00:46
#2
44.6 km
/==/
Zone: SWR
PF# 3
Speed: 70
Elev: 669m
06:06
06:07
Day: 1
80.9 km
9 intermediate stations
01:09
#3
125.5 km
/==/
Zone: SWR
PF# 2
Speed: 17
Elev: 797m
07:16
07:17
Day: 1
12.1 km
3 intermediate stations
00:43
#4
137.6 km
/==/
Zone: SWR
Speed: 34
Elev: 897m
08:00
08:05
Day: 1
Remote Location Quota Starting and Charting Station || Loco change from Electric to Diesel
Xing with 17308/Basava Express | Mon
Xing with 16536/Gol Gumbaz Express | Mon
5.7 km
1 intermediate stations
00:10
#5
143.3 km
/==/
Zone: SWR
Speed: 80
Elev: 915m
08:15
08:17
Day: 1
63.8 km
12 intermediate stations
00:48
#6
207.1 km
/==/
Zone: SWR
Speed: 59
Elev: 819m
09:05
09:07
Day: 1
96.3 km
14 intermediate stations
01:38
#7
303.4 km
/==/
Zone: SWR
Speed: 78
Elev: 803m
10:45
10:50
Day: 1
45.4 km
4 intermediate stations
00:35
#8
348.8 km
/==/
Zone: SWR
Speed: 89
Elev: 794m
11:25
11:27
Day: 1
68.2 km
8 intermediate stations
00:46
#9
417.0 km
/==/
Zone: SWR
Speed: 47
Elev: 668m
12:13
12:15
Day: 1
33.8 km
5 intermediate stations
00:43
#10
450.8 km
/--/
Zone: SWR
PF#: 1
Speed: 107
Elev: 722m
12:58
13:00
Day: 1
97.9 km
6 intermediate stations
00:55
#11
548.7 km
/--/
Zone: SWR
Speed: 25
13:55
13:57
Day: 1
55.2 km
5 intermediate stations
02:13
#12
603.9 km
/==/
Zone: SWR
PF# 1
Speed: 39
Elev: 465m
16:10
16:15
Day: 1
61.3 km
9 intermediate stations
01:35
#13
665.2 km
/==/
Zone: SWR
PF# 1
Speed: 51
Elev: 466m
17:50
17:55
Day: 1
27.9 km
4 intermediate stations
00:33
#14
693.0 km
/==/
Zone: SWR
Speed: 55
18:28
18:33
Day: 1
57.3 km
7 intermediate stations
01:02
#15
750.4 km
/==/
Zone: SWR
Speed: 45
Elev: 654m
19:35
19:40
Day: 1
Remote Location Quota Starting and Charting Station
67.5 km
9 intermediate stations
01:29
#16
817.9 km
/==/
Zone: SWR
Speed: 69
Elev: 586m
21:09
21:10
Day: 1
26.4 km
2 intermediate stations
00:23
#17
844.3 km
%==%
Zone: SWR
Speed: 48
Elev: 537m
21:33
21:35
Day: 1
35.1 km
5 intermediate stations
00:44
#18
879.4 km
!%%!%
Zone: SWR
Speed: 36
Elev: 526m
22:19
22:20
Day: 1
Experimental basis halt w.e.f 11.03.24 to till further advice.
62.3 km
10 intermediate stations
01:45
#19
941.6 km
/==/
Zone: SWR
PF# 1,2
Speed: 63
Elev: 592m
00:05
00:15
Day: 2
50.6 km
5 intermediate stations
00:48
#20
992.2 km
/==/
Zone: SWR
Speed: 31
Elev: 490m
01:03
01:04
Day: 2
Experimental halt for 6 months W.E.F 11/09/2023 to 04/03/2024.
59.1 km
9 intermediate stations
01:56
#21
1051.3 km
/==/
Zone: CR
PF# 3
Speed: 80
Elev: 455m
03:00
03:05
Day: 2
78.8 km
9 intermediate stations
00:59
#22
1130.1 km
/==/
Zone: CR
PF# 2
Speed: 46
Elev: 511m
04:04
04:05
Day: 2
108.2 km
12 intermediate stations
02:20
#23
1238.3 km
/==/
Zone: CR
PF# 2,3
Speed: 48
Elev: 515m
06:25
06:30
Day: 2
84.1 km
12 intermediate stations
01:45
#24
1322.4 km
%==%
Zone: CR
PF# 1
Speed: 65
08:15
08:18
Day: 2
67.3 km
8 intermediate stations
01:02
#25
1389.7 km
/==/
Zone: CR
PF# 1
Speed: 52
Elev: 535m
09:20
09:22
Day: 2
20.0 km
1 intermediate stations
00:23
#26
1409.7 km
/==/
Zone: CR
PF# 1
Speed: 15
09:45
10:05
Day: 2
Technical Halt Rake Reversal (the train reverses direction)
16.5 km
0 intermediate stations
01:05
#27
1426.3 km
/--/
Zone: CR
PF# 1

Elev: 508m
11:10

Day: 2
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy