Please flag this imaginary train which is intended to connect Visakhapatnam and Varanasi. A train between VSKP and BSB was demanded by Srikakulam MP too, and this is a proposed route.
Apr 01 2021 (18:57) This train demanded by Srikakulam MP to run Via Srikakulam, Bramhapur from long demand even ,even Suvidha SPL trains also ran in that route in btw 2017 - 2019 so re- route via this given route
Apr 01 2021 (18:56) This train demanded by Srikakulam MP to run Via Srikakulam, BAM Bramhapur from long demand even Suvidha SPL trains also ran in that route in btw 2017 - 2019 so re- route via this given route
Apr 01 2021 (18:56) This train demand demanded by Srikakulam MP to run Via Srikakulam, BAM from long demand even Suvidha SPL train trains also ran in that route in btw 2017 - 2019 so re- route via this given route
Apr 01 2021 (18:54) This train demand by Srikakulam MP to run Via Srikakulam, BAM from long demand even suvidha Suvidha SPL train also ran in that route in btw 2017 - 2019 so re- route via this given route
This train demanded by Srikakulam MP to run Via Srikakulam, Bramhapur from long demand ,even Suvidha SPL trains also ran in that route in btw 2017 - 2019 so re- route via this given route..
Please flag this imaginary train which is intended to connect Varanasi and Visakhapatnam. A train between BSB and VSKP was demanded by Srikakulam MP too, and this is a proposed route.
Important Note:This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks. Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.