Can Sabari express have The RSA with Narayanadri as it is breaking with Devagiri
So now Is there any possibility of Sabari having RSA with Narayanadri Coz it's the only possibility which is available now and as Narayanadri will be running dedicated from 05/06/24.
As it is even meeting needs of LHB PM cycle
Making TPTY CDO and SM at TVC ...
more...
PM- 685km- 1578km- SM- 1578km- 685km- PM repeat which is making 4516Km for each PM cycle
Or else any other possibilities?
please wait...Translate to EnglishYo, Sabari Express need to hook up with Narayanadri since it's getting cut off with Devagiri. So, should Sabari link up with Narayanadri 'cause that's the only option now, and Narayanadri gonna be on its own specific route from 05/06/24. It's even gonna cover the LHB PM circle cool. Handling TPTY CDO and SM at TVC. Travels 685km PM route, then 1578km, SM, 1578km, 685km, then PM again, that adds up to 4516km for each PM loop. Any other ideas or what?