Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Shabdbhedi Express: गति इसकी शब्दों को भेदती है, पूरब को पूर्वांचल से जोड़ती है - Dr. Abhishek Rai

Search Forum
Post PNR
Availability Calendar
Search GZB to PHD
Return# 14217
PDF Download

14218/Unchahar Express
ऊँचाहार एक्सप्रेस

GZB/Ghaziabad Junction --> PHD/Phaphund

Updated: Oct 08 2023 (15:12) by Siddharth98^~
Oct 08 2023 (15:12)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    482 blog entries  <<prev  next>>
Info Update
233764 views
8

Sep 07 2023 (14:23)   12581/Banaras - New Delhi SF Express (PT) | TDL/Tundla Junction (7 PFs)
PrakharYadav^~
PrakharYadav^~   15097 blog posts
Entry# 5816303            Tags   Past Edits
4 compliments
Useful Great Great Great
Ministry of Railways desires that stoppage of the following trains should be provided on an experimental basis at the station(s)

#ExperimentalStops2023
Translate to English
Translate to Hindi

More Posts
General Travel
187793 views
2

Sep 08 2023 (07:56)   12875/Neelachal Express (PT) | TDL/Tundla Junction (7 PFs)
Track_diaries^~   28622 blog posts
Entry# 5816719            Tags   Past Edits
Additional halt at TUNDLA
Translate to English
Translate to Hindi
General Travel
157648 views
0

Sep 06 2023 (16:20)   14218/Unchahar Express | BQP/Bighapur (2 PFs)
Lucknowplaces
Lucknowplaces   151 blog posts
Entry# 5815560            Tags  
Unchahar Express Arrival Bighapur Railway Station || Bighapur Unnao || ऊंचाहार एक्सप्रेस
click here
Translate to English
Translate to Hindi
Info Update
250653 views
0

Aug 14 2023 (20:06)   12231/Lucknow - Chandigarh SF Express | PYGS/Prayagraj Sangam (5 PFs)
PrakharYadav^~
PrakharYadav^~   15097 blog posts
Entry# 5798313            Tags   Past Edits
Traffic Block of Sadar Washing line/Lucknow from 18.08.2023 to 16.12.2023 (120 Days) for Up-gradation of 26 Coach Length New Washing Line as per latest CAMTECH drawing.

At Present, Primary Maintenance. of t.no. 12232/12231/14218/14217 (No. of rakes-4, Load-24 coaches ICF at Present) is done at Sadar Washing line Lucknow
During traffic block Rakes of 12231/14218/14217/12232 Will get Primary Maintenance at
...
more...
PYGS with insertion of one Scratch rake of same composition ex PYGS to work. as 14217 daily, Incoming rake of 14218 will get Primary Maintenance at PYGS. (No. of rakes-5, Load 24 ICF coaches. each).

Translate to English
Translate to Hindi
Info Update
70777 views
0

Mar 11 2023 (19:33)   14218/Unchahar Express
aprvkmr
aprvkmr   37 blog posts
Entry# 5662077            Tags   Past Edits
coach composition is changed
SLR-GS-GS-B6-B5-B4-B3-B2-B1-H1-A2-A1-S9-S8-S7-S6-S5-S4-S3-S2-S1-GS-GS-SLR
Translate to English
Translate to Hindi
Page#    482 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy