Can another rake be allotted for this to be extended to UBL from MAO.
Better if SWR can take over the train , they can also operate this between UBL and MYS via Konkan and Shiradi ghats with 3 rakes maximum relieving the SBC-KAWR exp of the circuitous route and ensure one proper daily connection to both UBL and MYS for coastal KA.