Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailFans - once you meet them, friends for life

Search Forum
Post PNR
Availability Calendar
Search NZM to BSL
Return# 12779
PDF Download

12780/Goa Express (PT)
गोवा एक्सप्रेस

NZM/Hazrat Nizamuddin --> BSL/Bhusaval Junction

Updated: Oct 09 (18:46) by PrakharYadav
Oct 09 (18:46)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    3218 blog entries  <<prev  next>>
General Travel
25185 views
4

Oct 09 (09:32)   12780/Goa Express (PT) | JL/Jalgaon Junction (6 PFs) | PUNE/WAP-7
ErArani^~
ErArani^~   9366 blog posts
Entry# 6213769            Tags   Past Edits
2 compliments
Great Great
Today's clicks.
Translate to English
Translate to Hindi

More Posts
General Travel
17187 views
5

Oct 09 (12:16)   12780/Goa Express (PT) | KPG/Kopargaon (3 PFs)
ErArani^~
ErArani^~   9366 blog posts
Entry# 6213921            Tags  
2 compliments
Great Great
Today's pictures. Arrived before time. October here is not so pleasant.
Translate to English
Translate to Hindi
Travelogue
16343 views
4

Oct 04 (10:06)   12779/Goa Express (PT)
travelroutes95
travelroutes95   64 blog posts
Entry# 6208897            Tags  
1 compliments
Great
Spectacular Monsoon Journey through Braganza Ghat, Dudhsagar Waterfalls onboard 12779 VSG NZM Goa Express - Madgaon to Castle Rock
If you liked my Video Please do Subscribe and Support my Channel
For more Videos
Indian Railways Onboard Journey videos - click here
Indian
...
more...
Railways Trainspotting Videos - click here

Translate to English
Translate to Hindi
General Travel
246998 views
14

★★
Apr 17 2023 (11:30)   12779/Goa Express (PT) | SVM/Sanvordem (Kudchade) (3 PFs)
LHB_for_18047~
LHB_for_18047~   11327 blog posts
Entry# 5696672            Tags   Past Edits
5 compliments
Useful Great Useful Useful Useful
Few updates from my recent trip in 12779 on 13.04.2023.
1. 12779 CC is exactly reversed by SWR except the 2 parcel vans.
2. Spotted 8 brand new LHB coaches consisting of 6 GS and 2 3ACE coaches most probably for Goa express at Kalem.
3. SVM to Kalem FEDL updates Total 10 kms. SVM outers ground works going on at good pace and
...
more...
the bridge outside SVM ready too, ground works at good progress for around 1km, further around 2 kms no works done most probably some land issue, then for around 7kms double line fully laid till Kalem. Regarding electrification the existing line is electrified and on the new line poles are laid. If the work on the middle 2 kms start immediately now the section can be doubled in next 6 months.
4. Kalem to Kulem existing single line already electrified and doubling works have just begun from Kulem railway station.
5. Kulem to Castle Rock no doubling work, but electric poles have been or are being put up at all places except the tunnels.
6. Castle Rock to Tinaighat doubling update: from CLR for around 30% of the section no work but for remaining around 70% ground fully levelled now ballast laying to commence. Electric poles have but put up besides the area levelled for double line. At CLR I think only the mainline is under wires (not fully sure) but other tracks only poles have been put up wiring still left.
7. LD to Kudachi if fully doubled now and Kudachi to Vijaynagar doubling almost done can be commissioned in next 2 to 3 months. could not notice electrification coz of darkness but poles are definitely there entire route could not or did not see the wiring though.
8. Vijaynagar to MRJ doubling going at slower pace compared to Kudachi Vijaynagar. My trip ended at MRJ.

Translate to English
Translate to Hindi

More Posts
General Travel
15226 views
0

Sep 29 (21:34)   12779/Goa Express (PT) | VSG/Vasco-da-Gama (3 PFs)
LHB_for_18047~
LHB_for_18047~   11327 blog posts
Entry# 6204845            Tags  
Two more coaches of 3AC should be added to this train as demand is definitely there for AC travel in this.
CC should be 20 LHB+ 2 LVPH.
Translate to English
Translate to Hindi

More Posts
Page#    3218 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy