Full Site Search  
Wed May 24, 2017 13:32:56 IST
PostPostPost Trn TipPost Trn TipUpload Train PicUpload Train PicAdvanced Search
×
Forum Super Search
Blog Entry#:
Words:

HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Details Edit
Large TB;
Entry# 907751-0
Details Edit
Medium; Side View; Large TB; UnReserved; Outside of Train; Standing at Station; Standing;
Entry# 2185159-0
Details Edit
Medium; Side View; Large TB; Outside of Train;
Entry# 1450394-0
Details Edit
Inside of Train;
Entry# 2185184-0
Refresh Live Status (34m ago)

12766/Amravati - Tirupati SF Express
అమరావతి -తిరుపతి ద్వి వీక్లీ సూపర్ఫాస్ట్ ఎక్స్ప్రెస్ / अमरावती - तिरुपती सुपरफास्ट एक्सप्रेस     अमरावती - तिरुपति सुपरफास्ट एक्सप्रेस

AMI/Amravati (Terminal) --> TPTY/Tirupati Main

Updated: Dec 16 2016 (19:43) by Awes Khan*^~
Dec 16 2016 (19:43)

Train Forum

Page#    148 blog entries  next>>
  
General Travel
0 Followers
368 views
May 12 2017 (20:55)   12765/Tirupati - Amravati SF Express

GK   36 blog posts
Entry# 2274538            Tags   Past Edits
This Train can be given LHB Rake
  
Predictions: 7
confirm: 1
rac: 6
wl: 0
Journey: Thu May 11, 2017 @ 08:30
Class: Sleeper - SL   |   Tot Seats: Avbl 235
Travel: AK/Akola Junction   to   TPTY/Tirupati Main   |   1221 km / 1309 km
12766/Amravati - Tirupati SF Express
Entry# 2260844

PNR: 815-xxxxxxx    |   Similar PNRs
Posted Status as of: May 03 2017 (13:01)
Passenger 1: Waitlist# 8 (Booking Status: W/L 30,GNWL)
Total Fare:  550
Chart NOT Prepared
Please analyze this PNR, and predict the final Charting Status. Thanks.
Posted thru RailCal

Latest Status as of: May 10 2017 (19:31)
Passenger 1: Waitlist# 33 (Booking Status: W/L 30,GNWL)
Total Fare:  550
Chart PREPARED

Full PNR Status History (22 statuses)
Status as of: May 10 2017 (19:31)
Passenger 1: Waitlist# 33 (Booking Status: W/L 30,GNWL)
Total Fare:  550
Chart PREPARED

Status as of: May 10 2017 (16:58)
Passenger 1: RAC 81 (Booking Status: W/L 30,GNWL)
Total Fare:  550
Chart NOT Prepared

Status as of: May 09 2017 (23:29)
Passenger 1: RAC 87 (Booking Status: W/L 30,GNWL)
Total Fare:  550
Chart NOT Prepared

Status as of: May 09 2017 (04:15)
Passenger 1: RAC 93 (Booking Status: W/L 30,GNWL)
Total Fare:  550
Chart NOT Prepared

Status as of: May 08 2017 (08:35)
Passenger 1: RAC 93 (Booking Status: W/L 30,GNWL)
Total Fare:  550
Chart NOT Prepared

Status as of: May 08 2017 (07:58)
Passenger 1: RAC 93 (Booking Status: W/L 30,GNWL)
Total Fare:  550
Chart NOT Prepared

Status as of: May 08 2017 (07:49)
Passenger 1: RAC 93 (Booking Status: W/L 30,GNWL)
Total Fare:  550
Chart NOT Prepared

Status as of: May 08 2017 (06:58)
Passenger 1: RAC 93 (Booking Status: W/L 30,GNWL)
Total Fare:  550
Chart NOT Prepared

Status as of: May 08 2017 (06:46)
Passenger 1: RAC 93 (Booking Status: W/L 30,GNWL)
Total Fare:  550
Chart NOT Prepared

Status as of: May 08 2017 (06:26)
Passenger 1: RAC 93 (Booking Status: W/L 30,GNWL)
Total Fare:  550
Chart NOT Prepared

Status as of: May 08 2017 (06:20)
Passenger 1: RAC 93 (Booking Status: W/L 30,GNWL)
Total Fare:  550
Chart NOT Prepared

Status as of: May 08 2017 (05:56)
Passenger 1: RAC 93 (Booking Status: W/L 30,GNWL)
Total Fare:  550
Chart NOT Prepared

Status as of: May 08 2017 (05:55)
Passenger 1: RAC 93 (Booking Status: W/L 30,GNWL)
Total Fare:  550
Chart NOT Prepared

Status as of: May 08 2017 (04:40)
Passenger 1: RAC 93 (Booking Status: W/L 30,GNWL)
Total Fare:  550
Chart NOT Prepared

Status as of: May 08 2017 (04:37)
Passenger 1: RAC 93 (Booking Status: W/L 30,GNWL)
Total Fare:  550
Chart NOT Prepared

Status as of: May 08 2017 (04:10)
Passenger 1: RAC 93 (Booking Status: W/L 30,GNWL)
Total Fare:  550
Chart NOT Prepared

Status as of: May 06 2017 (15:54)
Passenger 1: RAC 93 (Booking Status: W/L 30,GNWL)
Total Fare:  550
Chart NOT Prepared

Status as of: May 06 2017 (11:51)
Passenger 1: RAC 95 (Booking Status: W/L 30,GNWL)
Total Fare:  550
Chart NOT Prepared

Status as of: May 02 2017 (18:39)
Passenger 1: Waitlist# 8 (Booking Status: W/L 30,GNWL)
Total Fare:  550
Chart NOT Prepared

Status as of: May 01 2017 (00:26)
Passenger 1: Waitlist# 9 (Booking Status: W/L 30,GNWL)
Total Fare:  550
Chart NOT Prepared

Status as of: Apr 30 2017 (20:54)
Passenger 1: Waitlist# 10 (Booking Status: W/L 30,GNWL)
Total Fare:  550
Chart NOT Prepared

Status as of: Apr 26 2017 (13:53)
Passenger 1: Waitlist# 11 (Booking Status: W/L 30,GNWL)
Total Fare:  550
Chart NOT Prepared


  
358 views
May 10 2017 (21:25)
rdb*^   31270 blog posts   373811 correct pred (80% accurate)
Re# 2260844-1            Tags   Past Edits
#downgradation
From RAC to waiting
  
★  General Travel
0 Followers
2467 views
Feb 18 2017 (15:00)   12765/Tirupati - Amravati SF Express | TPTY/Tirupati Main (5 PFs)

Hx Bza Penna Express~   293 blog posts
Entry# 2169330            Tags   Past Edits
Ready to depart from pf4...
  
Predictions: 11
confirm: 8
rac: 3
wl: 0
Journey: Thu Mar 23, 2017 @ 14:32
Class: Sleeper - SL   |   Tot Seats: Avbl 12
Travel: NZB/Nizamabad Junction   to   TPTY/Tirupati Main   |   872 km / 1309 km
12766/Amravati - Tirupati SF Express
Entry# 2206612

PNR: 854-xxxxxxx (E-Ticket)   |   Similar PNRs
Posted Status as of: Mar 22 2017 (15:27)
Passenger 1: RAC 63 (Booking Status: W/L 10,GNWL)
Passenger 2: RAC 64 (Booking Status: W/L 11,GNWL)
Passenger 3: RAC 65 (Booking Status: W/L 12,GNWL)
Passenger 4: RAC 66 (Booking Status: W/L 13,GNWL)
Passenger 5: RAC 67 (Booking Status: W/L 14,GNWL)
Passenger 6: RAC 68 (Booking Status: W/L 15,GNWL)
Total Fare:  3300
Chart NOT Prepared
Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Mar 23 2017 (00:28)
Passenger 1: S3,17 [LB] (Booking Status: W/L 10,GNWL)
Passenger 2: S3,20 [LB] (Booking Status: W/L 11,GNWL)
Passenger 3: S3,18 [MB] (Booking Status: W/L 12,GNWL)
Passenger 4: S3,19 [UB] (Booking Status: W/L 13,GNWL)
Passenger 5: S3,21 [MB] (Booking Status: W/L 14,GNWL)
Passenger 6: S3,22 [UB] (Booking Status: W/L 15,GNWL)
Total Fare:  3300
Chart PREPARED

Full PNR Status History (2 statuses)
Status as of: Mar 23 2017 (00:28)
Passenger 1: S3,17 [LB] (Booking Status: W/L 10,GNWL)
Passenger 2: S3,20 [LB] (Booking Status: W/L 11,GNWL)
Passenger 3: S3,18 [MB] (Booking Status: W/L 12,GNWL)
Passenger 4: S3,19 [UB] (Booking Status: W/L 13,GNWL)
Passenger 5: S3,21 [MB] (Booking Status: W/L 14,GNWL)
Passenger 6: S3,22 [UB] (Booking Status: W/L 15,GNWL)
Total Fare:  3300
Chart PREPARED

Status as of: Mar 22 2017 (15:25)
Passenger 1: RAC 63 (Booking Status: W/L 10,GNWL)
Passenger 2: RAC 64 (Booking Status: W/L 11,GNWL)
Passenger 3: RAC 65 (Booking Status: W/L 12,GNWL)
Passenger 4: RAC 66 (Booking Status: W/L 13,GNWL)
Passenger 5: RAC 67 (Booking Status: W/L 14,GNWL)
Passenger 6: RAC 68 (Booking Status: W/L 15,GNWL)
Total Fare:  3300
Chart NOT Prepared


  
1351 views
Mar 22 2017 (23:06)
sagar biswas   183 blog posts   46994 correct pred (68% accurate)
Re# 2206612-1            Tags   Past Edits
Base Fare Reservation Charge Superfast Charge Other Charges Tatkal Charge Total Fare
405 20 30 0 0 455 but how 3300?

  
1334 views
Mar 22 2017 (23:32)
पश्चिम रेलवे प्रखर शर्मा~   461 blog posts   5666 correct pred (78% accurate)
Re# 2206612-2            Tags   Past Edits
This ticket is booked from AKOLA-AK to TIRUPATI-TPTY with NIZAMABAD-NZB as boarding point.
Therefore fare is calculated from AKOLA not from NIZAMABAD.
Fare :- AK-TPTY = 550
  
General Travel
0 Followers
3086 views
Mar 20 2017 (16:34)   57557/Nizamabad Nanded Passenger (UnReserved) | NZB/Nizamabad Junction (3 PFs)

Rizwan NZB Jn~   270 blog posts   1 correct pred (50% accurate)
Entry# 2204057            Tags   Past Edits
19/March/2017
The 57557/NZB-NED Passenger scheduled to depart at 06:00 AM was late by 2 hours making me capture some pictures of the arriving trains at beautiful sunrise.
20/March/2017 Coming back to NZB from NED via Amaravati-Tirupati SF

  
2820 views
Mar 20 2017 (21:57)
phaniraj1274~   133 blog posts
Re# 2204057-1            Tags   Past Edits
If Suppose Aurangabad-Bhubaneshwar Express Train is laid Via Parbhani-Nanded-Nizamabad-Peddapalli-Warangal-Vija yawada-Eluru-Rajahmundry-Visakhapatnam-Vizianagara m-Berahmapur-Khurda Road the distance is 347+178+292+350+444=1,611kms
If it is Via Parbhani-Nanded-Adilabad-Sewagram-Nagapur-Gondia-D urg-Raipur-Titlagarh-Sambalpur=237+446+972=1,655km s
If it is Via Nagarsol-Manmad-Bhusaval-Akola-Badnera-Wardha-Naga pur-Gondia-Durg-Raipur-Titlagarh-Sambalpur=1549+11 1=1662kms
If it is Via Parbhani-Nanded-Nizamabad-Secunderabad-Nalgonda-Gu ntur-Vijayawada-Eluru-Rajahmundry-Visakhapatnam-Vi zianagaram-Berahmapur-Khurda Road =821+794=1,615 kms
If
...
more...
it is Via Parbhani-Parli Vaijnath-Latur Road-Vikarabad-Secunderabad-Nalgonda-Guntur-Vijaya wada-Eluru-Rajahmundry-Visakhapatnam-Vizianagaram- Berahampur-Khurda Road=900+794=1,694kms
If it is Via Parbhani-Nanded-Nizamabad-Secunderabad-Kazipet-Vij ayawada-Eluru-Rajahmundry-Visakhapatnam-Vizianagar am-Berahampur-Khurda Road =857+794=1,651kms.
Out of these 6 Routes If suppose a Train is Laid From Aurangabad-Bhubaneshwar The First Priority should be given this train to run on Parbhani-Nanded-Nizamabad-Peddapalli-Warangal-Vija yawada Section ,Because this route is the Best Route and Fastest Route and Nearest Route when compared with the remaining routes and Moreover From Peddapalli-Vijayawada Track Tripling works are going to be started and From Aurangabad-Nizamabad a Most part of doubling work process is completed and The New Line Nizamabad-Peddapalli is sanctioned with Electrification.So this is the best route for laying a train from Aurangabad-Bhubaneshwar/Puri or Parli Vaijanath-Puri

  
2683 views
Mar 20 2017 (22:01)
phaniraj1274~   133 blog posts
Re# 2204057-2            Tags   Past Edits
Please put a proposal to extend 57557/58 Nizamabad-Nanded-Nizamabad Fast Passenger till Kazipet Junction Via Peddapalli and at the same time 57657/58 Manuguru-Kazipet-Manuguru Fast Passenger till Nizamabad Junction,which will benefit a lots of passengers

  
2622 views
Mar 20 2017 (22:52)
Rizwan NZB Jn~   270 blog posts   1 correct pred (50% accurate)
Re# 2204057-3            Tags   Past Edits
First of all 57557 is not a fast passenger, it's just a passenger train. Secondary, this train will never be extended because of high local traffic between Nizamabad and Nanded. So instead of extensions, there should be another passenger train between Nizamabad-Karimnagar along with express services from Nanded-Kazipet.

  
2617 views
Mar 20 2017 (23:01)
Rizwan NZB Jn~   270 blog posts   1 correct pred (50% accurate)
Re# 2204057-4            Tags   Past Edits
Bhai instead of copy pasting the same text in each and every comment, please just post it and don't flood the forum. Don't get me wrong but you have pasted this text 9 times. I agree with your thoughts, we have to share this msg on Twitter.
  
★★  Rail Fanning
0 Followers
1789 views
Mar 04 2017 (00:47)   12765/Tirupati - Amravati SF Express | PIL/Piler (2 PFs) | GY/WDG-4/12588

Sahasra Bahubali 2*^~   5961 blog posts   842 correct pred (74% accurate)
Entry# 2185159            Tags   Past Edits
Offlinks, GY WDG4 Twins 12588 & 12593 Hauling the Tirupati Amaravati Express stops at Pileru for a scheduled halt.
  
Rail Fanning
0 Followers
1665 views
Feb 15 2017 (19:54)   12765/Tirupati - Amravati SF Express | NED/Hazur Sahib Nanded (4 PFs) | GY/WDP-4D/40113

عمران جاوید   3728 blog posts   900 correct pred (63% accurate)
Entry# 2165847            Tags   Past Edits
12765 arrives nanded
  
General Travel
0 Followers
22965 views
Nov 30 2016 (10:01)   17211/Kondaveedu Express (PT)

WAP7   80 blog posts
Entry# 2075520            Tags   Past Edits
All trains from DHNE (17211, 17215, 12252, 12194, 22684, 17615, 22883, 12648, 22831, 16570, 12766, 12770 & 12785) to GY should go Via GTL

16 posts - Wed Nov 30, 2016

  
20379 views
Nov 30 2016 (21:58)
Foamer~   1834 blog posts
Re# 2075520-17            Tags   Past Edits
Apart from that GTL may benefit after completion of electrification of GTL-WADI. Some trains like KSK may be re-routed. In march when Bidar-GR new line opens, if a train to YPR is started, again it will pass thru GTL.

  
20261 views
Nov 30 2016 (23:37)
Foamer~   1834 blog posts
Re# 2075520-18            Tags   Past Edits
What? what did I say to get an objection?
-
I said good things are bound to happen to GTL after electrification. Like maybe re-routing of few trains. Or maybe some new trains like "Boxer Bhai" was pointing out.
-
Seriously!!!
...
more...
There seems to be no rhyme or reason, continuously everyone gets objections.
-
Whosoever has the privileges, Moderator/Admins/Monitors could you please identify this objector, who has given not just objection to my post but to previous posts with reasonable arguments. Surely they can't get away with this sort of mischief and unreasonable use of objections on all and sundry.

  
20741 views
Dec 01 2016 (02:00)
dkrishnamk   115 blog posts
Re# 2075520-19            Tags   Past Edits
I agree with you. Rake reversal is a major problem here.
I have done some independent research and found a solution to this problem. That is connecting DHNE-GTL and RC-GTL lines. Just before GTL town these two lines come very close to each other may be about 0.5kms, after Mallappa Gate.
If these lines can be connected in such a way that trains coming from DHNE go the RC-GTL line at Guntakal Chord Cabin, then rake reversal problem will be avoided, this will bring some bypassing trains back to GTL.

  
16863 views
Dec 24 2016 (09:07)
Lenovo X1 Carbon Best Machine so Far   1876 blog posts   1 correct pred (50% accurate)
Re# 2075520-21            Tags   Past Edits
Train coming to junctions, taking reversals it consumes a lot of time & platform vacancy as well.
If a passing or a through line is constructed it would be much relief then.

  
12559 views
Jan 26 2017 (00:46)
❤Cheesbali Lovez Devasena❤   530 blog posts   140 correct pred (93% accurate)
Re# 2075520-22            Tags   Past Edits
Namaskarim :)
Departure: Tue Jan 24 2017 @ 15:10
12765/Tirupati - Amravati SF Express
Trip# 101948    Traveller: Sahasra Bahubali 2*^~    Linked PNR Entry# 2018139
Class: Sleeper - SL
From: TPTY/Tirupati Main
To: DMM/Dharmavaram Junction
8 wishes
HJ Sir HJ HJ HJ HJ Happy Journey,Sudarshan! HJ Happy Journey Sudarshan Sir
TRIP HAS ENDED.
Blog  Time-Table

16 posts - Tue Jan 24, 2017 - are hidden. Click to open.

  
2543 views
Jan 24 2017 (20:28)
Sahasra Bahubali 2*^~   5961 blog posts   842 correct pred (74% accurate)
Re# 2018139-17            Tags   Past Edits
at DMM/Dharmavaram Junction
Departing now

  
2480 views
Jan 24 2017 (20:42)
Sahasra Bahubali 2*^~   5961 blog posts   842 correct pred (74% accurate)
Re# 2018139-18            Tags   Past Edits
TRIP HAS ENDED.
I am proxeeding to anantapur in the aame train

  
2441 views
Jan 24 2017 (20:50)
Sahasra Bahubali 2*^~   5961 blog posts   842 correct pred (74% accurate)
Re# 2018139-19            Tags   Past Edits
Hitting 105 kmph.

  
2511 views
Jan 24 2017 (20:54)
Sahasra Bahubali 2*^~   5961 blog posts   842 correct pred (74% accurate)
Re# 2018139-20            Tags   Past Edits
Covered the distance between DMM and ATP in 25 minutes. Hit 105 kmph mps.

  
2746 views
Jan 24 2017 (20:58)
Chart Prepared*~   7043 blog posts   167 correct pred (66% accurate)
Re# 2018139-21            Tags   Past Edits
Super run ..Happy jrny ..
TRIP HAS ENDED.
Blog  Time-Table
Page#    148 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Desktop site