Full Site Search  
Mon Feb 20, 2017 14:39:27 IST
PostPostPost Trn TipPost Trn TipUpload Train PicUpload Train PicAdvanced Search
×
Forum Super Search
Blog Entry#:
Words:

HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Entry# 1201425-0
Entry# 1898207-0
Entry# 2100517-0
Refresh Live Status (41m ago)

14625/Delhi Sarai Rohilla - Firozpur Cantt. InterCity Express
ਦਿੱਲੀ ਸਰਾਏ ਰੋਹਿਲਾ - ਫਿਰੋਜ਼ਪੁਰ ਛਾਉਣੀ ਇਨ੍ਤਰਸਿਤਿ ਏਕ੍ਸ਼ਪ੍ਰੇਸ     दिल्ली सराय रोहिल्ला - फिरोजपुर कैंट इंटरसिटी एक्सप्रेस

DEE/Delhi Sarai Rohilla --> FZR/Firozpur Cantt. Junction

Updated: Oct 08 2016 (17:30) by ☆❖☆ कर्नाटक संपर्क क्रांति☆❖☆^~
Oct 08 2016 (17:30)

Train Forum

Page#    55 blog entries  next>>
  
General Travel
0 Followers
1121 views
Nov 15 2016 (21:35)   14625/Delhi Sarai Rohilla - Firozpur Cantt. InterCity Express

when is Ferozepur Bilaspur Antyodya   131 blog posts
Entry# 2061151            Tags   Past Edits
Train stops at JAITO and BARETA too.. please #moderator cross check and update
  
Info Update
0 Followers
2771 views
Oct 21 2016 (01:15)   14625/Delhi Sarai Rohilla - Firozpur Cantt. InterCity Express | KTF/Kot Fatteh (2 PFs)
 

Vaibhav Agarwal*^   6114 blog posts   2568 correct pred (94% accurate)
Entry# 2030960            Tags   Past Edits
Traffic block for NI work at Kot Fatteh - Kattar Singhwala Station from 22/10/16 - 25/10/16
  
General Travel
0 Followers
3759 views
Sep 30 2016 (17:43)   14626/Firozpur Cantt.- Delhi Sarai Rohilla InterCity Express | FZR/Firozpur Cantt. Junction (6 PFs)
 

Gajendra Sahu~   1210 blog posts   153 correct pred (80% accurate)
Entry# 2007197            Tags   Past Edits
#moderator sir plz update distance between kotkapura and bhatinda ,due to this 14626 became fastest in non premium category wd whopping avg of 72kmph
Even beating sampoornkranti in lhb category and shanebhopal in icf.

  
3344 views
Oct 02 2016 (12:10)
Surat Mumbai Tejas Soon*^~   30335 blog posts   67726 correct pred (81% accurate)
Re# 2007197-1            Tags   Past Edits
It's due tosome bug in Atlas section now fixed

  
3226 views
Oct 02 2016 (13:35)
Gajendra Sahu~   1210 blog posts   153 correct pred (80% accurate)
Re# 2007197-3            Tags   Past Edits
Now fixed.
  
★★★  Rail Fanning
0 Followers
5264 views
Jun 17 2016 (11:13)   14623/Patalkot Express | DEE/Delhi Sarai Rohilla (5 PFs) | ET/WAM-46P/21247
 

Aditya   3018 blog posts   14087 correct pred (78% accurate)
Entry# 1898207            Tags   Past Edits
WAM46P #21247 ET Takes Rest After Hauled 14623 Chhindwara - Delhi Sarai Rohilla Patalkot Express & WDM3A #18986 LDH Waits For Starter Signal @ Pf.No.4 Of Delhi Sarai Rohilla With 14625 Delhi Sarai Rohilla - Firozpur Cantt Intercity Express :)

  
5056 views
Jun 17 2016 (12:19)
ET™~   2167 blog posts   34 correct pred (80% accurate)
Re# 1898207-2            Tags   Past Edits
Wammie chacha still powerful and beautiful👌

  
4882 views
Jun 17 2016 (23:54)
Aditya   3018 blog posts   14087 correct pred (78% accurate)
Re# 1898207-3            Tags   Past Edits
Bilkul,Aap Hi Ke Chhatrachaya Mein Joh Rehta Hai :D
  
Info Update
0 Followers
15155 views
Mar 14 2016 (20:10)   12038/Ludhiana - New Delhi Shatabdi Express
 

Ludhiana dhuri jakhal hisar track needs doubling~   436 blog posts   9 correct pred (52% accurate)
Entry# 1767092            Tags   Past Edits
List of restored trains after jat agitation.(source:drmumb)
  
General Travel
0 Followers
2695 views
Jan 18 2016 (10:33)   14625/Delhi Sarai Rohilla - Firozpur Cantt. InterCity Express
 

minixpeg   8 blog posts
Entry# 1714077            Tags   Past Edits
Not decided by railway when it will run and when it will cancelled
  
Predictions: 30
confirm: 30
rac: 0
wl: 0
Journey: Sat Sep 19, 2015 @ 06:45
Class: AC 3-tier - 3A   |   Tot Seats: Avbl 40
Travel: DEE/Delhi Sarai Rohilla   to   BTI/Bathinda Junction   |   293 km / 381 km
14625/Delhi Sarai Rohilla - Firozpur Cantt. InterCity Express
Entry# 1593736

Posted by: abohar3   2 blog posts   3162 correct pred (76% accurate)
PNR: 275-xxxxxxx (E-Ticket)   |   Similar PNRs
Posted Status as of: Sep 18 2015 (18:35)
Passenger 1: RAC 6 (Booking Status: W/L 1,GNWL)
Passenger 2: Waitlist# 1 (Booking Status: W/L 2,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Sep 18 2015 (23:21)
Passenger 1: B1,25 [LB] (Booking Status: W/L 1,GNWL)
Passenger 2: B1,28 [LB] (Booking Status: W/L 2,GNWL)
Chart PREPARED

  
4119 views
Sep 18 2015 (19:11)
DJ™^~   15432 blog posts   185349 correct pred (76% accurate)
Re# 1593736-1            Tags   Past Edits
#racallocation is 6 in 3A from DEE-BTI
Latest Status as of: Today (6:35PM)
Passenger 1: RAC 6 (Booking Status: W/L 1,GNWL)
Passenger 2: Waitlist# 1 (Booking Status: W/L 2,GNWL)
Chart NOT Prepared
  
General Travel
0 Followers
3192 views
Sep 03 2015 (07:50)   14625/Delhi Sarai Rohilla - Firozpur Cantt. InterCity Express
 

Fused Bulb   3 blog posts   13 correct pred (82% accurate)
Entry# 1580847            Tags   Past Edits
Late by 2 hours today. There was no prior information available through out the web.
The web was also updated after the scheduled departure time.
  
General Travel
0 Followers
3209 views
Sep 03 2015 (07:47)   14625/Delhi Sarai Rohilla - Firozpur Cantt. InterCity Express
 

Fused Bulb   3 blog posts   13 correct pred (82% accurate)
Entry# 1580844            Tags   Past Edits
Train delayed by 2 hours
  
Rail News
0 Followers
19485 views
Commentary/Human InterestNR/Northern  -  
Jan 04 2015 (22:57)   जल्द शुरू होगा जाखल से बठिंडा तक रेलवे का डबल ट्रैक
 

Vaibhav Agarwal*^   1403 news posts
Entry# 1330668   News Entry# 207675         Tags   Past Edits
जाखलसे बठिंडा के बीच प्रस्तावित डबल रेलवे ट्रैक अब जल्द ही शुरू हो जाएगा। ट्रैक निर्माण का कार्य पूरा कर लिया गया है। रेलवे के उच्चाधिकारी अब इसका निरीक्षण इसे चालू करने की अनुमति देंगे। डबल रेलवे ट्रैक के कार्य को लेकर दिल्ली रेल मंडल के इंजीनियरिंग विभाग अधिकारियों ने शनिवार को यहां का दौरा किया। इसको लेकर विशेष तौर पर पहुंचे मंडल रेल अभियंता(डीइएन) राजेंद्र गोयल ने ट्रैक का निरीक्षण किया। वहीं जाखल के निर्माण विभाग कार्यालय में इसकी समीक्षा भी की।
मंडल अभियंता ने बताया कि इस ट्रैक को चालू करने के लिए सभी प्रक्रियाएं लगभग पूरी कर ली गई है। अब सिर्फ रेलवे के मुख्य अधीक्षक (सीआरएस ) इसका निरीक्षण करेंगे। जिसके बाद इस ट्रैक को चालू कर
...
more...
दिया जाएगा। उल्लेखनीय है कि दिल्ली से बठिंडा के बीच उत्तर रेलवे का यह प्रमुख रेलवे ट्रैक है। जिसमें दिल्ली से जाखल तक का ट्रैक कई वर्षों पूर्व ही डबल किया जा चुका है लेकिन जाखल से आगे बठिंडा तक का रेलवे ट्रैक सिंगल है।
जिस कारण ट्रेनों का आवागमण सुचारू रूप से नहीं हो पाता। एक ट्रेन के आने पर दूसरी ट्रेन को एक रेलवे स्टेशन पर खड़ा रखना पड़ता है। जिससे ट्रेनों के समय में देरी होती है। वहीं ट्रेनों के समय में देरी के साथ यात्रियों को भी इसका खमियाजा भुगतना पड़ता है। जाखल से बठिंडा के बीच ट्रैक डबल करने का कार्य करीब पांच वर्ष पूर्व शुरू किया गया था। 86 किमी. लंबे ट्रैक को अब जाकर डबल किया गया है। जिसके बाद अब ट्रेनों के दोनों ओर से आवागमन करने का रास्ता खुल गया है। इस मौके पर रेलवे के जींद सहायक अभियंता रंधीर ग्रेहा, जाखल निरीक्षक बीके मिश्रा भी मौजूद थे।
लोगों ने बताई समस्याएं
वहीं इंजीनियरिंग विभाग अधिकारियों के आने का पता चलने पर उनके समक्ष लोगों ने अपनी समस्याएं भी रखी। खासकर जाखल रेलवे स्टेशन पर फुट ओवर ब्रिज के करीब ढ़ाई साल से टूटे होने लोगों के लिए गुजरने का कोई रास्ता होने पर रोष जताया। रेलवे के रिटायर्ड हेड बुकिंग क्लर्क मांगे राम, बुकिंग अधिकारी केके प्रसाद ने कहा कि पुल के होने से प्रतिदिन सैकडों लोगों को जान जोखिम में डालकर रेलवे क्रॉसिंग करनी पड़ रही है लेकिन अधिकारी कोई ध्यान नहीं दे रहे हैं। वहीं उन्होंने रेलवे स्टेशन के बाहर शौचालयों के होने, प्लेटफार्म 1 2 के बीच बने रास्ते को बंद किए जाने पर भी रोष जताया।

7 posts - Fri Jan 09, 2015

  
8401 views
Jan 09 2015 (10:57)
Naveen~   2939 blog posts   33 correct pred (60% accurate)
Re# 1330668-8            Tags   Past Edits
Both of these routes are feeder routes of Eastern Dedicated Freight Corridor and Western Dedicated Freight Corridor respectively. What according to the documents and conversation with railway staff, I am assuming these sections would or should be doubled by or before 2018. As freight capacity on both routes are being projected to increase substantially. Where Dhuri is the intersection point of both the feeder routes.

  
Jan 31 2015 (15:20)
Vaibhav Agarwal*^   6114 blog posts   2568 correct pred (94% accurate)
Re# 1330668-9            Tags   Past Edits
Temporary Cancellation/Diversion/Rescheduling of trains due to doubling work between Jakhal - Bareta - Budhlada from 2/2/15 - 5/2/15

  
Feb 06 2015 (00:08)
Vaibhav Agarwal*^   6114 blog posts   2568 correct pred (94% accurate)
Re# 1330668-10            Tags   Past Edits
3 दिन डबल ट्रैक के निरीक्षण के बाद दौड़ेंगी गाड़ियां
click here

  
15581 views
Apr 17 2015 (23:39)
Vaibhav Agarwal*^   6114 blog posts   2568 correct pred (94% accurate)
Re# 1330668-12            Tags   Past Edits
Blog Entry Unlocked.
For info update

  
15632 views
Apr 17 2015 (23:41)
Vaibhav Agarwal*^   6114 blog posts   2568 correct pred (94% accurate)
Re# 1330668-13            Tags   Past Edits
Partial Cancellation/Diversion/Rescheduling of trains due to doubling work between Budhlada - Narinderpura - Mansa from 19/4/15 - 22/2/15
Page#    55 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Desktop site