Full Site Search  
Thu Apr 27, 2017 01:15:36 IST
PostPostPost Trn TipPost Trn TipUpload Train PicUpload Train PicAdvanced Search
×
Forum Super Search
Blog Entry#:
Words:

HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Details Edit
Large TB;
Entry# 462809-0
Details Edit
Large TB;
Entry# 2113327-11
Details Edit
Large TB;
Entry# 2150171-0
Refresh Live Status (9m ago)

12670/Ganga Kaveri Express
கங்கா - காவிரி அதி விரைவு வண்டி     गंगा कावेरी एक्सप्रेस

CPR/Chhapra Junction --> MAS/Chennai Central

Updated: Apr 12 2017 (01:24) by ☆ CSK Fan Forever ☆^~
Apr 12 2017 (01:24)

Train Forum

Page#    544 blog entries  next>>
  
Predictions: 35
confirm: 35
rac: 0
wl: 0
Journey: Mon Mar 20, 2017 @ 17:40
Class: AC 3-tier - 3A   |   Tot Seats: Avbl 115
Travel: MAS/Chennai Central   to   ALD/Allahabad Junction   |   2001 km / 2341 km
12669/Ganga Kaveri Express
Entry# 2202371

Posted by: kvn2494   0 blog posts
PNR: 454-xxxxxxx (E-Ticket)   |   Similar PNRs
Posted Status as of: Mar 18 2017 (22:58)
Passenger 1: RAC 8 (Booking Status: W/L 40,GNWL)
Total Fare:  1960
Chart NOT Prepared
Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Mar 20 2017 (13:45)
Passenger 1: A3,12 [SU] (Booking Status: W/L 40,GNWL)
Total Fare:  1960
Chart PREPARED

Full PNR Status History (2 statuses)
Status as of: Mar 20 2017 (13:45)
Passenger 1: A3,12 [SU] (Booking Status: W/L 40,GNWL)
Total Fare:  1960
Chart PREPARED

Status as of: Mar 18 2017 (22:58)
Passenger 1: RAC 8 (Booking Status: W/L 40,GNWL)
Total Fare:  1960
Chart NOT Prepared


  
1296 views
Mar 20 2017 (21:38)
rdb*^   31077 blog posts   368554 correct pred (80% accurate)
Re# 2202371-1            Tags   Past Edits
  
Predictions: 18
confirm: 18
rac: 0
wl: 0
Journey: Sun Mar 05, 2017 @ 11:55
Class: AC 2-tier - 2A   |   Tot Seats: Avbl 10
Travel: NGP/Nagpur Junction   to   BSB/Varanasi Junction   |   1044 km / 2341 km
12669/Ganga Kaveri Express
Entry# 2182877

Posted by: vikaskumar2578   2 blog posts   1 correct pred (100% accurate)
PNR: 412-xxxxxxx (PRS)   |   Similar PNRs
Posted Status as of: Mar 02 2017 (00:03)
Passenger 1: Waitlist# 1 (Booking Status: W/L 3,RLGN)
Passenger 2: NOSB (Booking Status: NOSB ,GN)
Total Fare:  2865
Chart NOT Prepared
Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Mar 05 2017 (20:27)
Passenger 1: A3,33 [LB] (Booking Status: W/L 3,RLGN)
Passenger 2: NOSB (Booking Status: NOSB ,GN)
Total Fare:  2865
Chart PREPARED

Full PNR Status History (20 statuses)
Status as of: Mar 05 2017 (08:08)
Passenger 1: A3,33 [LB] (Booking Status: W/L 3,RLGN)
Passenger 2: NOSB (Booking Status: NOSB ,GN)
Total Fare:  2865
Chart PREPARED

Status as of: Mar 05 2017 (06:29)
Passenger 1: A3,33 [LB] (Booking Status: W/L 3,RLGN)
Passenger 2: NOSB (Booking Status: NOSB ,GN)
Total Fare:  2865
Chart PREPARED

Status as of: Mar 04 2017 (23:26)
Passenger 1: A3,33 [LB] (Booking Status: W/L 3,RLGN)
Passenger 2: NOSB (Booking Status: NOSB ,GN)
Total Fare:  2865
Chart PREPARED

Status as of: Mar 04 2017 (23:02)
Passenger 1: A3,33 [LB] (Booking Status: W/L 3,RLGN)
Passenger 2: NOSB (Booking Status: NOSB ,GN)
Total Fare:  2865
Chart PREPARED

Status as of: Mar 04 2017 (09:53)
Passenger 1: Waitlist# 1 (Booking Status: W/L 3,RLGN)
Passenger 2: NOSB (Booking Status: NOSB ,GN)
Total Fare:  2865
Chart NOT Prepared

Status as of: Mar 04 2017 (07:09)
Passenger 1: Waitlist# 1 (Booking Status: W/L 3,RLGN)
Passenger 2: NOSB (Booking Status: NOSB ,GN)
Total Fare:  2865
Chart NOT Prepared

Status as of: Mar 04 2017 (07:05)
Passenger 1: Waitlist# 1 (Booking Status: W/L 3,RLGN)
Passenger 2: NOSB (Booking Status: NOSB ,GN)
Total Fare:  2865
Chart NOT Prepared

Status as of: Mar 04 2017 (04:23)
Passenger 1: Waitlist# 1 (Booking Status: W/L 3,RLGN)
Passenger 2: NOSB (Booking Status: NOSB ,GN)
Total Fare:  2865
Chart NOT Prepared

Status as of: Mar 04 2017 (04:15)
Passenger 1: Waitlist# 1 (Booking Status: W/L 3,RLGN)
Passenger 2: NOSB (Booking Status: NOSB ,GN)
Total Fare:  2865
Chart NOT Prepared

Status as of: Mar 04 2017 (03:55)
Passenger 1: Waitlist# 1 (Booking Status: W/L 3,RLGN)
Passenger 2: NOSB (Booking Status: NOSB ,GN)
Total Fare:  2865
Chart NOT Prepared

Status as of: Mar 03 2017 (22:19)
Passenger 1: Waitlist# 1 (Booking Status: W/L 3,RLGN)
Passenger 2: NOSB (Booking Status: NOSB ,GN)
Total Fare:  2865
Chart NOT Prepared

Status as of: Mar 03 2017 (22:12)
Passenger 1: Waitlist# 1 (Booking Status: W/L 3,RLGN)
Passenger 2: NOSB (Booking Status: NOSB ,GN)
Total Fare:  2865
Chart NOT Prepared

Status as of: Mar 03 2017 (15:14)
Passenger 1: Waitlist# 1 (Booking Status: W/L 3,RLGN)
Passenger 2: NOSB (Booking Status: NOSB ,GN)
Total Fare:  2865
Chart NOT Prepared

Status as of: Mar 03 2017 (08:33)
Passenger 1: Waitlist# 1 (Booking Status: W/L 3,RLGN)
Passenger 2: NOSB (Booking Status: NOSB ,GN)
Total Fare:  2865
Chart NOT Prepared

Status as of: Mar 03 2017 (08:26)
Passenger 1: Waitlist# 1 (Booking Status: W/L 3,RLGN)
Passenger 2: NOSB (Booking Status: NOSB ,GN)
Total Fare:  2865
Chart NOT Prepared

Status as of: Mar 03 2017 (04:30)
Passenger 1: Waitlist# 1 (Booking Status: W/L 3,RLGN)
Passenger 2: NOSB (Booking Status: NOSB ,GN)
Total Fare:  2865
Chart NOT Prepared

Status as of: Mar 03 2017 (04:22)
Passenger 1: Waitlist# 1 (Booking Status: W/L 3,RLGN)
Passenger 2: NOSB (Booking Status: NOSB ,GN)
Total Fare:  2865
Chart NOT Prepared

Status as of: Mar 03 2017 (04:00)
Passenger 1: Waitlist# 1 (Booking Status: W/L 3,RLGN)
Passenger 2: NOSB (Booking Status: NOSB ,GN)
Total Fare:  2865
Chart NOT Prepared

Status as of: Mar 02 2017 (23:13)
Passenger 1: Waitlist# 1 (Booking Status: W/L 3,RLGN)
Passenger 2: NOSB (Booking Status: NOSB ,GN)
Total Fare:  2865
Chart NOT Prepared

Status as of: Mar 01 2017 (23:53)
Passenger 1: Waitlist# 1 (Booking Status: W/L 3,RLGN)
Passenger 2: NOSB (Booking Status: NOSB ,GN)
Total Fare:  2865
Chart NOT Prepared


  
1678 views
Mar 04 2017 (22:42)
vikaskumar2578   2 blog posts   1 correct pred (100% accurate)
Re# 2182877-1            Tags   Past Edits
confirmed
  
★  General Travel
0 Followers
3812 views
Dec 07 2016 (17:13)   12670/Ganga Kaveri Express | LMD/Linganeni Doddi (1 PFs)

Vishnu Datta Jacke~   105 blog posts
Entry# 2083382            Tags   Past Edits
12670 CHHAPRA jN. ~ Chennai Central Ganga Kaveri Express led by KYN WDG4D + dead ED WAP4 on its way to MAS Through Diverted route KCG,MBNR,DHNE,GY,RU DUE to RII Works at BZA .

  
3648 views
Dec 07 2016 (17:16)
JBP ET OHE OMG 😲 SUPPORTS KKR 😎~   12464 blog posts   22 correct pred (42% accurate)
Re# 2083382-1            Tags   Past Edits
Why a emd ??
Was p4 failure

  
3705 views
Dec 07 2016 (17:21)
⋆7007⋆ Godavari Express ⋆7008⋆~   2072 blog posts   460 correct pred (90% accurate)
Re# 2083382-2            Tags   Past Edits
No. Since train was running in diverted route where KCG - GY stretch is not yet electrified, D loco was attached. Instead of removing E Loco at KCG and again attaching another E Loco at GY, they just made it dead.
  
★  Rail Fanning
0 Followers
2790 views
Feb 03 2017 (15:39)   12670/Ganga Kaveri Express | CPR/Chhapra Junction (5 PFs)

Avinash Pandey™~   1069 blog posts   687 correct pred (78% accurate)
Entry# 2150171            Tags   Past Edits
Southern Tamil Style : TB
Chhapra-Chennai Central GangaKaveri Exp
  
General Travel
0 Followers
3652 views
Jan 23 2017 (20:01)   12669/Ganga Kaveri Express | MAS/Chennai Central (12 PFs)

Boxer Bhai   38750 blog posts   12687 correct pred (61% accurate)
Entry# 2137553            Tags   Past Edits
Agitation near kok
So train diverted to run
Mas-ajj-ru-gdr then normal route

1 posts - Mon Jan 23, 2017

  
3423 views
Jan 23 2017 (20:32)
SRG*^~   35397 blog posts   163437 correct pred (76% accurate)
Re# 2137553-2            Tags   Past Edits
Even Circar was halted for halted for before MS for more than 90 mins then started from MS @ 19:15 delayed by 115 Mins...Running in normal route.

  
3420 views
Jan 23 2017 (20:35)
Boxer Bhai   38750 blog posts   12687 correct pred (61% accurate)
Re# 2137553-3            Tags   Past Edits
Ya it seems agitation called off

  
3335 views
Jan 23 2017 (20:43)
Strongly against KJM halt for 12657 58~   2786 blog posts   271 correct pred (65% accurate)
Re# 2137553-4            Tags   Past Edits
Issue was only at KOK station. Was cleared by 7pm and now trains running in normal route

  
3241 views
Jan 23 2017 (20:48)
JBP ET OHE OMG 😲 SUPPORTS KKR 😎~   12464 blog posts   22 correct pred (42% accurate)
Re# 2137553-5            Tags   Past Edits
Ye kya chl rha h
Sarkar n baat man li phr b dange chl rhe h

  
3223 views
Jan 23 2017 (22:06)
Boxer Bhai   38750 blog posts   12687 correct pred (61% accurate)
Re# 2137553-6            Tags   Past Edits
1 compliments
😆😆😆
Jalli jalli kattu kattu hai
  
★★★  General Travel
Dec 23 2016 (21:55)   12670/Ganga Kaveri Express | JBP/Jabalpur Junction (6 PFs) | ET/WDP-4B

भारतीय रेल की पूछताछ सेवा में आपका स्वागत है~   441 blog posts   5 correct pred (100% accurate)
Entry# 2102196            Tags   Past Edits
#ETALDELECTRIFICATION
In a nutshell, I've closely identified the progress of electrification work between Jabalpur and Itarsi. The details are given below.
1. Jabalpur (excl.)-Narsinghpur work is almost done. Wiring is complete. Work left is only on the two bridges over Narmada river. I think they are deciding to electrify KEQ-JBP at the end. Pic is given in my trip blog.
2. The pic
...
more...
no. 1 & 2 gives the good news we all have been waiting for. The final section i.e, Kareli-Pipariya work has started. Holes have been dug from Gardarwara till Pipariya. You can see works-man digging holes for poles. Soon they'll reach Kareli.
3. Pipariya station is completely under wires now. Pics 3,4,5 shows the status. Wiring from PPI-BGRT is done. At few poles it is to be tightened. I've seen works-man tighten the wires, but due to immense speed of the train (thanks to ET shed monster WDP4b :p ) i couldn't capture those instants. Pics- 8,9 shows BRGT station status.
4. The only single line section of ET-ALD route i.e, BRGT-SQL has also begun to come under wires. Poles and wires are installed and only tightening needs to be done. Pics 9,10,11 are evident. Even bridge over TAWA river is getting poles to be installed.
5. The section after SQL is completed. Only tightening of wires is left at 4-5 poles.
Work is going on at decent pace. CORE is all set to trail the electrified section of ET-PPI in January and is working on that. I hope that was useful :)

16 posts - Mon Dec 26, 2016

  
8143 views
Dec 26 2016 (12:58)
2017Year of hopes for JBP~   3294 blog posts   44 correct pred (50% accurate)
Re# 2102196-18            Tags   Past Edits
yes work of doubling also started b/w BGTA-Sontalai as i have spotted the ongoing work after sontalai as trees is being cutted and i think only before tawa bridge the new line will be diverting or else i think the more space which is there in the old bridge will be used to lay new line and before tunnel it will be divertd to avoid new tunnel construction so its good to see work of doubling started from sontalai end

  
★  
7098 views
Jan 04 2017 (23:17)
Ashfak Ahmed Moosa   62 blog posts
Re# 2102196-19            Tags   Past Edits
Jbp katni electrification work 70percent kam ho gaya hai sihora station k pas dumping yard hai jaha electrification mai lagney wala saman rakha hai

  
7201 views
Jan 04 2017 (23:42)
Mohammad Sharique Siddiqui   38 blog posts
Re# 2102196-20            Tags   Past Edits
Very happy to see that the work is restarted hope it finishes soon

  
6939 views
Jan 05 2017 (00:11)
भारतीय रेल की पूछताछ सेवा में आपका स्वागत है~   441 blog posts   5 correct pred (100% accurate)
Re# 2102196-21            Tags   Past Edits
70% ho gya?

  
7153 views
Jan 05 2017 (00:25)
Ashfak Ahmed Moosa   62 blog posts
Re# 2102196-22            Tags   Past Edits
Yes bro aj hi dayodaya express sey jaipur se lauta hu tab mainey dekha hai70na sahi par 60percent to done hai
  
Predictions: 27
confirm: 1
rac: 26
wl: 0
Journey: Sat Jan 07, 2017 @ 17:40
Class: Sleeper - SL   |   Tot Seats: Avbl 405
Travel: MAS/Chennai Central   to   BSB/Varanasi Junction   |   2135 km / 2341 km
12669/Ganga Kaveri Express
Entry# 2117529

Posted by: mthcdoshi~   866 blog posts   3420 correct pred (89% accurate)
PNR: 464-xxxxxxx (PRS)   |   Similar PNRs
Posted Status as of: Jan 06 2017 (10:46)
Passenger 1: Waitlist# 20 (Booking Status: W/L 93,GNWL)
Passenger 2: Waitlist# 21 (Booking Status: W/L 94,GNWL)
Total Fare:  1195
Chart NOT Prepared
Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jan 07 2017 (16:48)
Passenger 1: RS10 47 (Booking Status: W/L 93,GNWL)
Passenger 2: Can/Mod (Booking Status: W/L 94,GNWL)
Total Fare:  1195
Chart PREPARED

Full PNR Status History (5 statuses)
Status as of: Jan 07 2017 (16:48)
Passenger 1: RS10 47 (Booking Status: W/L 93,GNWL)
Passenger 2: Can/Mod (Booking Status: W/L 94,GNWL)
Total Fare:  1195
Chart PREPARED

Status as of: Jan 07 2017 (09:45)
Passenger 1: RAC 120 (Booking Status: W/L 93,GNWL)
Passenger 2: Waitlist# 1 (Booking Status: W/L 94,GNWL)
Total Fare:  1195
Chart NOT Prepared

Status as of: Jan 07 2017 (07:18)
Passenger 1: Waitlist# 1 (Booking Status: W/L 93,GNWL)
Passenger 2: Waitlist# 2 (Booking Status: W/L 94,GNWL)
Total Fare:  1195
Chart NOT Prepared

Status as of: Jan 06 2017 (14:38)
Passenger 1: Waitlist# 14 (Booking Status: W/L 93,GNWL)
Passenger 2: Waitlist# 15 (Booking Status: W/L 94,GNWL)
Total Fare:  1195
Chart NOT Prepared

Status as of: Jan 06 2017 (10:47)
Passenger 1: Waitlist# 20 (Booking Status: W/L 93,GNWL)
Passenger 2: Waitlist# 21 (Booking Status: W/L 94,GNWL)
Total Fare:  1195
Chart NOT Prepared


  
2807 views
Jan 07 2017 (09:49)
mthcdoshi~   866 blog posts   3420 correct pred (89% accurate)
Re# 2117529-1            Tags   Past Edits
#RACALLOCATION in GN Quota in SL class is 120
.
Passenger 1: RAC 120 (Booking Status: W/L 93,GNWL)
Passenger 2: Waitlist# 1 (Booking Status: W/L 94,GNWL)
  
★  General Travel
0 Followers
6273 views
Dec 23 2016 (21:27)   12670/Ganga Kaveri Express | BGTA/Bagratawa (2 PFs) | ET/WDP-4B

भारतीय रेल की पूछताछ सेवा में आपका स्वागत है~   441 blog posts   5 correct pred (100% accurate)
Entry# 2102159            Tags   Past Edits
Construction of Traction Sub Station at Bagra Tawa.
Date- 22-12-2016
Train No.- 12670 Ganga Kaveri Express.
Drive Link - click here
#EtAldElectrification
Notice
...
more...
the pole work started on the single line section of BGTA-SQL.
Update- Now on YouTube :)

5 posts - Fri Dec 23, 2016

  
3709 views
Dec 23 2016 (22:41)
भारतीय रेल की पूछताछ सेवा में आपका स्वागत है~   441 blog posts   5 correct pred (100% accurate)
Re# 2102159-6            Tags   Past Edits
Google drive ki link di h. 3gp video upload nahi ho rha.

  
3650 views
Dec 23 2016 (23:01)
JBP ET OHE OMG 😲 SUPPORTS KKR 😎~   12464 blog posts   22 correct pred (42% accurate)
Re# 2102159-7            Tags   Past Edits
Wo khul h nhi rha h kha se dkhe video

  
3769 views
Dec 24 2016 (00:02)
Waiting for elocos in ET JBP section😌~   53 blog posts
Re# 2102159-8            Tags   Past Edits
Too good👌👌👌....i saw the video of the construction on substation it is with great speed thnxx for the info and also for ur effort...

  
3416 views
Dec 25 2016 (11:44)
LHB for Begampura Exp~   668 blog posts
Re# 2102159-9            Tags   Past Edits
nice video

  
5260 views
Dec 26 2016 (12:50)
2017Year of hopes for JBP~   3294 blog posts   44 correct pred (50% accurate)
Re# 2102159-10            Tags   Past Edits
awesome news and i have also spotted the ongoing TSS work at BGTA while on my jrny towards JBP from KYN in 12141 so i will be also posting some updates with pics of #ETALDELECTRIFICATION work soon and hope by this pace of work CRS inspection of ET-PPI section will be scheduled soon and by JAN end we can see elocos on ET-PPI section so some more days to see elocos action

19 posts - Thu Dec 22, 2016 - are hidden. Click to open.

2 posts - Fri Dec 23, 2016 - are hidden. Click to open.

  
5686 views
Dec 23 2016 (11:52)
arydolly001~   458 blog posts
Re# 2098922-22            Tags   Past Edits
pls upload pic n videos , we r waiting :)

  
5479 views
Dec 23 2016 (13:46)
भारतीय रेल की पूछताछ सेवा में आपका स्वागत है~   441 blog posts   5 correct pred (100% accurate)
Re# 2098922-23            Tags   Past Edits
I'll upload in evening.

  
4987 views
Dec 28 2016 (19:30)
Waiting for elocos in ET JBP section😌~   53 blog posts
Re# 2098922-24            Tags   Past Edits
How much work of electrification is done between KTE-JBP section.....Is the poles reaches near adhartaal?

  
4678 views
Dec 29 2016 (01:42)
भारतीय रेल की पूछताछ सेवा में आपका स्वागत है~   441 blog posts   5 correct pred (100% accurate)
Re# 2098922-25            Tags   Past Edits
I dont know brother. I traveled from. JBP towards ET side.

  
4204 views
Dec 29 2016 (20:14)
Waiting for elocos in ET JBP section😌~   53 blog posts
Re# 2098922-26            Tags   Past Edits
Ok 👍
  
Poll
0 Followers
3198 views
12 votes
Dec 26 2016 (21:26)   12669/Ganga Kaveri Express

300 confirmed timlines~   961 blog posts   76 correct pred (64% accurate)
Entry# 2106047            Tags   Past Edits
Will Ganga Kaveri run Daily? What's your Prediction?
Yes42%5
No58%7

  
2984 views
Dec 29 2016 (15:37)
300 confirmed timlines~   961 blog posts   76 correct pred (64% accurate)
Re# 2106047-1            Tags   Past Edits
Legendary train hai to daily run karna chahiye.
Page#    544 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Desktop site