Full Site Search  
Fri Jun 23, 2017 19:31:35 IST
PostPostPost Trn TipPost Trn TipUpload Train PicUpload Train PicAdvanced Search
×
Forum Super Search
Blog Entry#:
Words:

HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Details Edit
Large TB;
Entry# 1732567-0
Details Edit
Close-up; Front-facing; Large TB; UnReserved; Outside of Train;
Entry# 2226640-0
Refresh Live Status (10m ago)

12728/Godavari SF Express (PT)
గోదావరి సూపర్‌ఫాస్ట్ ఎక్స్‌ప్రెస్     गोदावरी सुपरफास्ट एक्सप्रेस

HYB/Hyderabad Deccan Nampally --> VSKP/Visakhapatnam Junction

Member Trip is in Progress for this Train

Updated: Oct 03 2016 (08:27) by system
Oct 03 2016 (08:27)

Train Forum

Page#    1890 blog entries  next>>
Trip is in progress. Status not available.
Live logging has already been enabled for this trip.
Blog  Time-Table
Trip is in progress. Status not available.
Live logging has already been enabled for this trip.
Blog  Time-Table
Trip is in progress. Status not available.
Live logging has already been enabled for this trip.
Blog  Time-Table
  
General Travel
0 Followers
230 views
Jun 15 2017 (18:55)   12727/Godavari SF Express

Sairam   20 blog posts   1 correct pred (33% accurate)
Entry# 2321845            Tags   Past Edits
Please advise if this PNR 6102010051, will be confirmed. Thank you. It is RAC 21, 22, 23 now for journey on June-18 in 3AC. I got no replies by posting in PNR section. Thank you.
  
General Travel
0 Followers
657 views
Jun 10 2017 (01:28)   12727/Godavari SF Express

xxxx~   794 blog posts   36 correct pred (56% accurate)
Entry# 2314197            Tags   Past Edits
Why this train is getting delayed every day

  
383 views
Jun 13 2017 (20:01)
Venkata Giri Babu K   86 blog posts
Re# 2314197-1            Tags   Past Edits
For last one month, SCR making this train sick. Some of members saying that there is line issue between Annavaram and RJY. It is not true. If we see the trend of Link and Faluknuma they are doing reasonably well with their time table. SCR making this train sick right from Anakapalli where it is taking to AKP with 15 to 20 minutes delay. If we see Link express hardly any delay in taking over SCR. Similarly for no reason, 12727 is getting much delay between Annavaram and RJY stacking up to 50 min delay and further it is getting detained at RJY beyond 20 min for reason (didn't see any over take during the detention). BZA is another is another culprit in admitting this to platform even though there is enough slack is provided between EE - BZA, it is literally crawling between Gunadala and BZA except Sunday departure....
more...
They are only sparing Sunday's departure. Other days, it is just a fast passenger. For strange reasons, 12728 is also getting delayed regularly but with in 15 min, earlier it is used to be on time or before time to VSKP.

  
346 views
Jun 13 2017 (20:14)
Electrification of whole SCR   448 blog posts
Re# 2314197-2            Tags   Past Edits
Queen getting trolled by SCR 😑😑😑

  
317 views
Jun 13 2017 (21:09)
ALCoholic~   760 blog posts   28 correct pred (85% accurate)
Re# 2314197-3            Tags   Past Edits
RF's ki queen controllers ki kadhuga:P

  
302 views
Jun 13 2017 (21:21)
Electrification of whole SCR   448 blog posts
Re# 2314197-4            Tags   Past Edits
Yeah whatever. 😝😝

  
276 views
Jun 13 2017 (21:25)
xxxx~   794 blog posts   36 correct pred (56% accurate)
Re# 2314197-5            Tags   Past Edits
Now what is the fate of this train
Page#    1890 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Desktop site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.