Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

For a RailFan, watching MPS skips are far more interesting than watching F1 race - Prince Maan

Search Forum
Post PNR
Availability Calendar
Search GNT to RJY
Return# 22701
PDF Download

22702/Guntur - Visakhapatnam UDAY Express
गुंटूर - विशाखपट्टणम उदय एक्सप्रेस

GNT/Guntur Junction --> RJY/Rajahmundry

Updated: Mar 30 (19:42) by Padmakant
Mar 30 (19:42)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    224 blog entries  next>>
Info Update
288636 views
2

Aug 01 (17:29)   12958/Swarna Jayanti Rajdhani Express | MMCT/Mumbai Central (5 PFs)
Nothingispermanentvalid~
Nothingispermanentvalid~   529 blog posts
Entry# 6143019            Tags   Past Edits
2 compliments
Agree Agree
In my opinion railways should make future train sets with this coach composition 6 general class coaches including luggage loading capacity , 6 sleeper coaches , 8 ac class coaches ( which can include third ac or second ac or first ac or can be a mixture of these coaches ) and ( either 1 ac coach or 2 ac coaches can be removed to add pantry car coach and extra luggage coach ) so 6+6+8 total 20 and 2 electric locos ( 1 at front side of whole trainset and 1 at back side of the whole trainset ) so 20 +2 total 22 coaches , so that instead of giving lhb rakes to some trains which runs on a longer path railways should directly convert those mail or express or superfast express trains into these trains sets and cost of making lhb coaches will also be reduced or...
more...
saved due to directly conversion of mail or express train into train sets and rake reversal time of many trains will be reduced cost of doing rake reversal of a train will also be reduced ( due to 2 engine 1 at back side of the trainset and 1 and front side of the train set ) and speed of all trains can be increased (due to 2 engine 1 at back side of the trainset and 1 and front side of the train set ) . Please give your opinion on this but please don't give any argument related to politics so that i can save my post from getting archived.

Or either railways can apply this coach composition in in some upcoming amrit bharat express trains so that we can get see that whether this coach composition for train sets will become a successful idea or will become waste idea.

Translate to English
Translate to Hindi

More Posts
General Travel
53281 views
1

Jun 26 (08:41)   17239/Simhadri Express | VSKP/Visakhapatnam Junction (8 PFs)
vgirik69
vgirik69   82 blog posts
Entry# 6106112            Tags   Past Edits
SCR released another PR indicating restoring previously cancelled trains Simhadri, MTM exp, Uday and TPTY DD along with Memus. But Ratnachal and Rayagada are missing in the list.
Translate to English
Translate to Hindi

More Posts
1 Followers
Poll
7261176 views
131 votes
9

Feb 16 2020 (11:08)   12727/Visakhapatnam - Hyderabad Godavari SF Express (PT) | VSKP/Visakhapatnam Junction (8 PFs)
SCoR~
SCoR~   1812 blog posts
Entry# 4566740            Tags   Past Edits
1 compliments
Disagree
From Where Should Rajadhani Express in Andhra Pradesh start
Translate to English
Translate to Hindi
NO vote
Visakhapatnam/Vizag (Executive Capital)
63%
83
Guntur (District headquarter of Amaravati-Legislative Capital)
3%
4
Vijayawada (Nearest station to Amaravati-Legislative Capital)
8%
11
Kurnool/Guntakal (Judicial capital)(as kurnool dosent have pitlines Guntakal is been Kept in Option)
12%
16
Visakhapatnam and Kurnool/Guntakal (As Amaravati- Legislative capital have no railway line)
0%
0
Visakhapatnam.Guntur.Kurnool/Guntakal
2%
2
Visakhapatnam.Vijayawada.Kurnool/Guntakal)
1%
1
None of The above. I will give my option
11%
14

More Posts
General Travel
17704 views
0

Apr 29 (14:56)   22701/Visakhapatnam - Guntur UDAY Express | VSKP/Visakhapatnam Junction (8 PFs)
deepak.yerr~
deepak.yerr~   6471 blog posts
Entry# 6047640            Tags  
Visakhapatnam Guntur Uday express resumed it's run from today and has excellent occupancy both sides even after cancellation of 4 weeks. April month had lot of marriage muhurtas and all trains to Hyd and Vijayawada are in demand and Uday cancellation of this month is a bad decision. Good part is Simhadri ran and saw a vlog where all seats filled up at Tuni and good turnout in Duvvada, AKP, Elamanchili. Today from VSKP to VJA VB, Uday, Janmabhoomi are full. From tomorrow there may be slight drop in occupancy for about 10days except weekend for VB and Uday as Moodam ( no marriage muhurtas) started and rush will come back from next thrusday due to election date and summer holidays till June 15th.
...
more...

Rajahmundry to Vskp is given separate quota and its also full.

Translate to English
Translate to Hindi
General Travel
33910 views
2

Mar 16 (15:49)   22701/Visakhapatnam - Guntur UDAY Express | VSKP/Visakhapatnam Junction (8 PFs)
deepak.yerr~
deepak.yerr~   6471 blog posts
Entry# 6000434            Tags  
Visakhapatnam Guntur Uday express total seats 800 today current availability is only 24 so 100% occupancy breakup of boarding and deboarding Visakhapatnam 680 boarding, Duvvada AKP Tuni 100 while Both Samalkot and Rajahmundry have boarding and deboarding, 70 tavellers have deboarded more then boarding making current availability 95 then TP Gudem 50 Eluru 40 remaining 600 deboarding at Vijayawada and Guntur.

Return its full from GNT VJA and Rjy Visakhapatnam is given separate quota of 80.
Translate to English
Translate to Hindi

2 Posts

17994 views
1

Mar 28 (23:16)
SaiCharan^~
SaiCharan^~   3502 blog posts
Re# 6000434-3              
Only mtm vskp & uday are cancelled in April bza division some diversions via gdv bvrt, rest will run normally in April
Translate to English
Translate to Hindi

16666 views
1

Apr 11 (19:18)
SaiCharan^~
SaiCharan^~   3502 blog posts
Re# 6000434-4              
1 compliments
Great
Additional repercussions
Translate to English
Translate to Hindi

14365 views
0

Apr 11 (19:20)
Sameer2905^~
Sameer2905^~   17475 blog posts
Re# 6000434-5               Past Edits
Yaar I'm seeing too many cancellations of local, normal, semi-premium trains... is there any work happening?? I'm seeing this since the past 3-4 months.... r they doing half-baked work or something???
Translate to English
Translate to Hindi

14174 views
1

Apr 11 (19:25)
SaiCharan^~
SaiCharan^~   3502 blog posts
Re# 6000434-6              
1 compliments
_/\_:OOF....😑😑😑
In some sections works are happening since ages they don't post any updates regarding progress they simply cancel trains and some trains are being intentionally cancelled to run freights to generate more revenue.
Translate to English
Translate to Hindi

14442 views
0

Apr 11 (19:27)
deepak.yerr~
deepak.yerr~   6471 blog posts
Re# 6000434-7              
RJY Vskp MEMU rake is used for MEMUs in Vskp division. One they complete the km cycle they will send the rake to RJY for replacement rake as empty in open timings once in 6-7 days
Translate to English
Translate to Hindi
Page#    224 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy