Full Site Search  
Tue May 30, 2017 02:18:14 IST
PostPostPost Trn TipPost Trn TipUpload Train PicUpload Train PicAdvanced Search
×
Forum Super Search
Blog Entry#:
Words:

HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Details Edit
Large TB;
Entry# 1377625-0
Details Edit
Large TB;
Entry# 2153682-0
Details Edit
Medium; Front-facing; Small TB; UnReserved; Outside of Train; Standing at Station;
Entry# 2242217-0
Details Edit
Medium; Front-facing; Large TB; Outside of Train; Standing at Station;
Entry# 2242217-0
Refresh Live Status (17m ago)

18507/Hirakud (Hirakund) Express (PT)
హీరాకుడ్     हीराकुड एक्सप्रेस

VSKP/Visakhapatnam Junction --> ASR/Amritsar Junction

Updated: Feb 27 2017 (18:56) by PIyUsH SInGH™^~
Feb 27 2017 (18:56)

Train Forum

Page#    756 blog entries  next>>
Departure: Wed May 24 2017 @ 09:20
18507/Hirakud (Hirakund) Express (PT)
Trip# 109599    Traveller: Rahul~    Linked PNR Entry# 2290516
Class:
From: GWL/Gwalior Junction
To: NDLS/New Delhi
7 wishes
HJ HJ HJ HJ शुभ यात्रा HJ HJ
TRIP HAS ENDED.
Blog  Time-Table

30 posts - Wed May 24, 2017 - are hidden. Click to open.

  
577 views
May 24 2017 (14:10)
Rahul~   299 blog posts
Re# 2290516-31            Tags   Past Edits
at TKD/Tuglakabad: 5m late
Entered in Delhi state.

  
558 views
May 24 2017 (14:17)
Rahul~   299 blog posts
Re# 2290516-32            Tags   Past Edits
TKEC/Tuglakabad East Cabin 1 km<-->1 km OKA/Okhla: 7m late
Passed under a metro bridge.

  
614 views
May 24 2017 (14:18)
Rahul~   299 blog posts
Re# 2290516-33            Tags   Past Edits
at OKA/Okhla: 6m late
Skipping in MPS.

  
613 views
May 24 2017 (14:23)
Rahul~   299 blog posts
Re# 2290516-34            Tags   Past Edits
Entering in platform 3

  
591 views
May 24 2017 (14:33)
Rahul~   299 blog posts
Re# 2290516-36            Tags   Past Edits
TRIP HAS ENDED.
Reached NZM
TRIP HAS ENDED.
Blog  Time-Table
TRIP HAS ENDED.
Blog  Time-Table

  
846 views
May 23 2017 (21:28)
Railfan Bilaspur~   1630 blog posts   2831 correct pred (66% accurate)
Re# 2263123-7            Tags   Past Edits
TRIP HAS ENDED.
  
★★  General Travel
Feb 10 2016 (10:16)   VSKP/Visakhapatnam Junction (8 PFs)
 

Mangalagiri   337 blog posts
Entry# 1734723            Tags   Past Edits
Time has come for VSKP to say Good bye to ECoR ..
Announcement on Vizag zone after Union Budget, says Sujana
: Chief Minister N. Chandrababu Naidu has requested the Railway Ministry to take an expeditious decision on the creation of Visakhapatnam railway zone.
The Chief Minister, accompanied by Union Minister Y.S. Chowdary and P. Ashok Gajapati Raju, called on Railway Minister Suresh Prabhu
...
more...
in New Delhi on Tuesday. Mr. Naidu submitted representation seeking speedy completion of pending works in the State, including connectivity between Amaravati and major cities in the south through high-speed trains.
He wanted the Railway Ministry to make sufficient budgetary allocations for the completion of the Kakinada-Pithapuram, Nadikudi-Srikalahasti and Guntukal-Srikalahasti lines besides requesting the Centre to hand over maintenance of the old bridge at Rajahmundry to the State Government. The State emphasised the need for ensuring that the allocations were made in the upcoming railway budget.
Mr. Chowdary said the Centre had given in-principle clearance for the railway zone in Visakhapatnam and the zone would be announced after the Union Cabinet formally gives its nod.
Development package
Creation of the special railway zone was part of the special development package assured to the State post bifurcation.
The State had also sought the Ministry to take up works on feeder line connecting the new capital Amaravati with Guntur and Vijayawada. The Ministry was requested to consider the proposal for laying third line between Visakhapatnam and Chennai besides examining the proposals for development of infrastructure at important railway stations through joint ventures.
The Railway Minister, he said, positively responded to the representation and promised that surveys would be undertaken on the proposals submitted by the State Government as well as the MPs from the State.
Thrust areas
Sufficient budgetary allocations for completion of Kakinada-Pithapuram, Nadikudi-Srikalahasti, Guntukal-Srikalahasti lines
Commencement of works on feeder line connecting the new capital Amaravati with Guntur and Vijayawada
Third line sought between Visakhapatnam and Chennai
click here

22 posts - Wed Feb 10, 2016

66 posts - Thu Feb 11, 2016

  
61079 views
Feb 11 2016 (18:15)
Coro Puru Falak^~   6614 blog posts   8260 correct pred (74% accurate)
Re# 1734723-106            Tags   Past Edits
Even if train got extended to BBS, still its going via VSKP city and catering to both cities.

  
61556 views
Feb 11 2016 (18:23)
Coro Puru Falak^~   6614 blog posts   8260 correct pred (74% accurate)
Re# 1734723-107            Tags   Past Edits
#moderator
#system
#FM
Bashing is going on on full height against a specific Zone and State.
Kindly Lock this blog.

  
Feb 11 2016 (18:28)
South East Coast Railway SECoR™   501 blog posts   449 correct pred (60% accurate)
Re# 1734723-108            Tags   Past Edits
how come it is catering both the cities
quota for VSKP had been decreased by ECoR, infact BBS has more quota than VSKP, for its extended trains - isn't true?
new coaches allotted to WAT are replaced by old coaches within weeks of their inauguration - isn't true?
new trains proposed for VSKP are rejected by ECoR stating irrelevant reasons and the same
...
more...
trains are lobbied to start from BBS - isn't true
trains running from BBS are given proper/effecient TT, while that of VSKP are given TT full of slacks or less TAT - isn't true?

  
60951 views
Feb 11 2016 (18:28)
kalingaUtkal   220 blog posts
Re# 1734723-109            Tags   Past Edits
Yes, you are right.
Nothing has happen till now. But so many bashings are going on. First Rly. Ministry will discuss with Odisha Govt. as per the demands in this reagard, than any fruitful news may come for A.P peoples.

  
Feb 11 2016 (18:30)
system   939 blog posts
Re# 1734723-110            Tags   Past Edits
Auto-Archived due to Objections.
  
General Travel
0 Followers
738 views
May 15 2017 (19:18)   18508/Hirakud (Hirakund) Express

deepakyerr~   918 blog posts
Entry# 2278427            Tags   Past Edits
The arrival time at ASR is 2330 on wed sat sun from Vskp and dep time is 2345 on wed sat sun towards Vskp please clarify whether the same train returns or rakes are kept idle for some days at ASR.

  
734 views
May 15 2017 (19:19)
ssood143   849 blog posts
Re# 2278427-1            Tags   Past Edits
Rake is kept idle. Ideally this train can be extended to SVDK.
  
★★  Rail Fanning
0 Followers
2428 views
Aug 31 2014 (11:14)   18508/Hirakud (Hirakund) Express | TKJ/Tilak Bridge (4 PFs)
 

Abhishek Kumar~   10541 blog posts   9912 correct pred (76% accurate)
Entry# 1202494            Tags   Past Edits
VSKP bound Hirakud Express passes through Tilak Bridge with GZB WAP-1 #22033 grandpa........

  
2303 views
Aug 31 2014 (15:49)
Abhishek Kumar~   10541 blog posts   9912 correct pred (76% accurate)
Re# 1202494-1            Tags   Past Edits
Grandpa capture......
  
General Travel
0 Followers
990 views
Apr 30 2017 (21:08)   18508/Hirakud (Hirakund) Express

Hei man shau   42 blog posts
Entry# 2257408            Tags   Past Edits
Is this train truely runs with 6 rakes??
  
General Travel
0 Followers
1257 views
Apr 19 2017 (18:29)   18507/Hirakud (Hirakund) Express (PT) | GWL/Gwalior Junction (5 PFs)

Kirti Sahni   4978 blog posts   2421 correct pred (64% accurate)
Entry# 2242217            Tags   Past Edits
18507 hirakund express
  
General Travel
0 Followers
1280 views
Apr 19 2017 (18:12)   18507/Hirakud (Hirakund) Express (PT) | GWL/Gwalior Junction (5 PFs) | LDH/WAG-7/24600

Kirti Sahni   4978 blog posts   2421 correct pred (64% accurate)
Entry# 2242195            Tags   Past Edits
Offlink

  
1242 views
Apr 19 2017 (18:22)
Electric Loco Shed Soon at BSP~   1251 blog posts   995 correct pred (75% accurate)
Re# 2242195-1            Tags   Past Edits
Gzb Wap 1 is taking Rest
  
Poll
0 Followers
7938 views
20 votes
Dec 03 2016 (17:38)   18508/Hirakud (Hirakund) Express

हिंदी मीडियम~   2158 blog posts   36 correct pred (68% accurate)
Entry# 2079356            Tags   Past Edits
To decongest Delhi stations and improve the timing of crossing over trains, should each crossing over train be given only single stoppage in Delhi NCR region.
Like mathura-panipat/rohtak - ndls only
gzb- rohtak ndls only
...
more...
rewari - gzb dli only
rewari - panipat dee only
mathura - gzb nzm only
mathura - rohtak dsj only (kindly suggest more add-on and corrections in the list)
Like wise possible terminal For mathura bound nzm
rewari/ rohtak bound dee
gzb bound anvt
pnp bound szm/dli (prestigious trains of all routes may be allowed to originate from ndls)
Yes80%16
No5%1
Cann't say15%3

2 posts - Dec 2016

  
4900 views
Jan 05 2017 (18:10)
Savaari Gaadi~   966 blog posts   2 correct pred (100% accurate)
Re# 2079356-3            Tags   Past Edits
We can also use DEC as terminal if the station is improved.

  
4912 views
Jan 05 2017 (18:14)
हिंदी मीडियम~   2158 blog posts   36 correct pred (68% accurate)
Re# 2079356-4            Tags   Past Edits
But DEC has some transportation issues as well due to its location. lack of city buses by DTC and distance with metro station. May be problem some for east delhi residents.

  
4895 views
Jan 05 2017 (18:37)
Savaari Gaadi~   966 blog posts   2 correct pred (100% accurate)
Re# 2079356-5            Tags   Past Edits
That's why I said if improved. Upcoming Janakpuri - Botanical Garden metro line goes through Palam so if their any metro feeders aur E-rickshaw available then passengers can reach DEC.

  
2024 views
Apr 10 2017 (17:04)
Baaz SGUJ WDP4~   928 blog posts   43 correct pred (62% accurate)
Re# 2079356-6            Tags   Past Edits
The problems in that case is that 16 platforms of New Delhi station will be of no use. I think NDLS can be a major terminus for premium trains like Rajdhani, Shatabdi, Duronto, Humsafar, Tejas, Garib Rath, AC SFs of all directions. Rest can be as you suggested. HOwever, it will leave popular trains like Tamil Nadu, Poorva etc to terminate at NZM, ANVT etc.

  
2031 views
Apr 10 2017 (17:08)
हिंदी मीडियम~   2158 blog posts   36 correct pred (68% accurate)
Re# 2079356-7            Tags   Past Edits
agar cross over trains ka timing sudharna hai to thoda kasht uthana hoga. take for example katra bound himsagar exp , it enters delhi by 8pm and leaves delhi by 1 am . 5 hrs for second longest train wasted due to congestion which could be wrapped up in 1 - 1.5 hrs
Page#    756 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Desktop site