Full Site Search  
Tue Jun 27, 2017 21:21:21 IST
PostPostPost Trn TipPost Trn TipUpload Train PicUpload Train PicAdvanced Search
×
Forum Super Search
Blog Entry#:
Words:

HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Details Edit
Large TB;
Entry# 1002688-0
Details Edit
Large TB;
Entry# 1326018-0
Details Edit
Medium; Large TB;
Entry# 916112-0
Details Edit
Side View; Large TB; EOG/SLR; Outside of Train; Passing Station;
Entry# 2315423-0
Refresh Live Status (not updated)

12648/Kongu Superfast Express (PT)
کونگو ایکسپریس / கொங்கு அதிவிரைவு வண்டி     कोंगु सुपरफास्ट एक्सप्रेस

NZM/Hazrat Nizamuddin --> CBE/Coimbatore Main Junction

Updated: Jan 23 2017 (15:27) by GKP WAP5^~
Jan 23 2017 (15:27)

Train Forum

Page#    529 blog entries  next>>
  
General Travel
0 Followers
261 views
Jun 25 2017 (12:11)   12647/Kongu SF Express | DDN/Dehradun (4 PFs)

rshbaggarwal283   474 blog posts   167 correct pred (58% accurate)
Entry# 2332295            Tags   Past Edits
Can this train be extended to Dehradun via MTC-SRE-HW. This will give direct connectivity to Uttranchal with Hyderabad/Bangalore/Coimbatore. Is this feasible ?

2 posts - Sun Jun 25, 2017

  
204 views
Jun 25 2017 (12:26)
भूत हूँ मैं~   3510 blog posts   3085 correct pred (82% accurate)
Re# 2332295-3            Tags   Past Edits
Yes!
Very good idea!
i think it will be difficult upto DDN as DDN has no such long platforms!
Either HW or KLK would be a good option!

  
191 views
Jun 25 2017 (12:28)
Sudeesh~   1576 blog posts
Re# 2332295-4            Tags   Past Edits
Having approx 18 hrs turn around time at NZM , this can be extended up to DDN or HW, but in the same time the speed also should be increased.

  
192 views
Jun 25 2017 (12:34)
rshbaggarwal283   474 blog posts   167 correct pred (58% accurate)
Re# 2332295-5            Tags   Past Edits
extended even till HW would be good. lets hope railways think about this connectivity soon.

  
196 views
Jun 25 2017 (12:34)
Science is better than Engineering and Technology*^~   14088 blog posts   2 correct pred (100% accurate)
Re# 2332295-6            Tags   Past Edits
as SBC SC portion double electrifying works going on . speed up is possible after work completion.

  
87 views
Yesterday (11:37)
IR no more Safe^~   22542 blog posts   99050 correct pred (75% accurate)
Re# 2332295-7            Tags   Past Edits
yes, possible.
but half rake needs to be detached at HW.
even half part can go to CDG.
like MDU DDN/CDG Exp.
  
★★★  Rail Fanning
0 Followers
1007 views
Jun 10 2017 (21:17)   12648/Kongu Superfast Express (PT) | MJF/Malkajgiri Junction (3 PFs) | LGD/WAP-7/30272

Tapan Sharma~   287 blog posts   1 correct pred (100% accurate)
Entry# 2315423            Tags   Past Edits
12648 Hazrat Nizamuddin to Coimbatore KonguNadu Weekly SF express skipping Malkajgiri!!!
This Train doesn't have a Pantry Car and CC is wrongly Updated the correct one is
ENG-SLR-UR1-S1-S2-S3-S4-S5-S6-S7-S8-S9-S10-S11-S12 -S13-S14-B2-B1-A1-UR2-UR3-SLR (22 Coaches)
Admins kindly update and (Edit according to reversal pattern)!!
The
...
more...
pictures enclosed below are in exact CC order and a '3A' coach in transit!!!

  
881 views
Jun 10 2017 (22:11)
IR no more Safe^~   22542 blog posts   99050 correct pred (75% accurate)
Re# 2315423-1            Tags   Past Edits
you can also post TL for updation.

  
809 views
Jun 10 2017 (22:50)
Tapan Sharma~   287 blog posts   1 correct pred (100% accurate)
Re# 2315423-2            Tags   Past Edits
Ha okay Sir I'll
Give it a try!!

  
633 views
Jun 11 2017 (21:48)
ED WAP7~   596 blog posts   23 correct pred (51% accurate)
Re# 2315423-3            Tags   Past Edits
Why no pantry to this train?😠😠 Tweeted to DRM Salem, Got reply : Your suggested noted shall refer to the concern department; Copy Paste reply 😠😠

  
477 views
Jun 12 2017 (21:29)
Tapan Sharma~   287 blog posts   1 correct pred (100% accurate)
Re# 2315423-4            Tags   Past Edits
KonguNadu Exp should have PC and it should be Speeded up in both the directions and should be made Bi-Weekly this is such an important train after KL Exp!

  
427 views
Jun 12 2017 (22:18)
ED WAP7~   596 blog posts   23 correct pred (51% accurate)
Re# 2315423-5            Tags   Past Edits
Sad thing is it shares the time slot of Samara.. Would be good if it trails KSK within an hour gap..
  
Predictions: 8
confirm: 8
rac: 0
wl: 0
Journey: Wed May 24, 2017 @ 21:00
Class: AC 3-tier - 3A
Travel: ET/Itarsi Junction   to   YPR/Yesvantpur Junction   |   1491 km / 2663 km
12648/Kongu Superfast Express (PT)
Entry# 2283722

Posted by: RAILWAY KA DIL DEKHO ITARSI   582 blog posts   1477 correct pred (56% accurate)
PNR: 271-xxxxxxx   |   Similar PNRs
Posted Status as of: May 19 2017 (23:10)
Boarding Point: ET/Itarsi Junction
Resv To: YPR/Yesvantpur Junction
Resv Quota: SS
Passenger 1: RLWL# 3 (Booking Status: RLWL# 10)
Passenger 2: RLWL# 4 (Booking Status: RLWL# 11)
Total Fare:  2515
Chart NOT Prepared
Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: May 24 2017 (17:28)
Boarding Point: ET/Itarsi Junction
Resv To: YPR/Yesvantpur Junction
Resv Quota: SS
Passenger 1: Confirmed: B1/19 [UB] (Booking Status: RLWL# 10)
Passenger 2: Confirmed: B1/21 [MB] (Booking Status: RLWL# 11)
Total Fare:  2515
Chart PREPARED

Full PNR Status History (2 statuses)
Status as of: May 24 2017 (17:28)
Boarding Point: ET/Itarsi Junction
Resv To: YPR/Yesvantpur Junction
Resv Quota: SS
Passenger 1: Confirmed: B1/19 [UB] (Booking Status: RLWL# 10)
Passenger 2: Confirmed: B1/21 [MB] (Booking Status: RLWL# 11)
Total Fare:  2515
Chart PREPARED

Status as of: May 19 2017 (23:09)
Boarding Point: ET/Itarsi Junction
Resv To: YPR/Yesvantpur Junction
Resv Quota: SS
Passenger 1: RLWL# 3 (Booking Status: RLWL# 10)
Passenger 2: RLWL# 4 (Booking Status: RLWL# 11)
Total Fare:  2515
Chart NOT Prepared


  
1035 views
May 24 2017 (12:48)
RAILWAY KA DIL DEKHO ITARSI   582 blog posts   1477 correct pred (56% accurate)
Re# 2283722-1            Tags   Past Edits
Will this ticket get confirmed?

  
986 views
May 24 2017 (13:59)
RAILWAY KA DIL DEKHO ITARSI   582 blog posts   1477 correct pred (56% accurate)
Re# 2283722-2            Tags   Past Edits
EXPERTS ....reply plss

  
1006 views
May 24 2017 (14:00)
★★★N e H e a r t K i r t i ★★ ★^~   5151 blog posts   2648 correct pred (64% accurate)
Re# 2283722-3            Tags   Past Edits
Yes , it'll confirm
  
Predictions: 13
confirm: 10
rac: 3
wl: 0
Journey: Wed May 24, 2017 @ 21:00
Class: Sleeper - SL
Travel: ET/Itarsi Junction   to   YPR/Yesvantpur Junction   |   1491 km / 2663 km
12648/Kongu Superfast Express (PT)
Entry# 2247423

Posted by: RAILWAY KA DIL DEKHO ITARSI   582 blog posts   1477 correct pred (56% accurate)
PNR: 265-xxxxxxx   |   Similar PNRs
Posted Status as of: Apr 23 2017 (17:46)
Passenger 1: Waitlist# 4 (Booking Status: W/L 4,RLGN)
Passenger 2: Waitlist# 5 (Booking Status: W/L 5,RLGN)
Passenger 3: Waitlist# 6 (Booking Status: W/L 6,RLGN)
Passenger 4: NOSB (Booking Status: NOSB ,GN)
Passenger 5: NOSB (Booking Status: NOSB ,GN)
Total Fare:  2515
Chart NOT Prepared
Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: May 24 2017 (17:14)
Boarding Point: ET/Itarsi Junction
Resv To: YPR/Yesvantpur Junction
Resv Quota: GN
Passenger 1: Confirmed: S5/48 [SU] (Booking Status: RLWL# 4)
Passenger 2: Confirmed: S5/56 [SU] (Booking Status: RLWL# 5)
Passenger 3: Confirmed: S5/67 [UB] (Booking Status: RLWL# 6)
Passenger 4: NOSB//0 (Booking Status: NOSB/NOSB/0)
Passenger 5: NOSB//0 (Booking Status: NOSB/NOSB/0)
Total Fare:  2515
Chart PREPARED

Full PNR Status History (4 statuses)
Status as of: May 24 2017 (17:14)
Boarding Point: ET/Itarsi Junction
Resv To: YPR/Yesvantpur Junction
Resv Quota: GN
Passenger 1: Confirmed: S5/48 [SU] (Booking Status: RLWL# 4)
Passenger 2: Confirmed: S5/56 [SU] (Booking Status: RLWL# 5)
Passenger 3: Confirmed: S5/67 [UB] (Booking Status: RLWL# 6)
Passenger 4: NOSB//0 (Booking Status: NOSB/NOSB/0)
Passenger 5: NOSB//0 (Booking Status: NOSB/NOSB/0)
Total Fare:  2515
Chart PREPARED

Status as of: May 23 2017 (20:35)
Boarding Point: ET/Itarsi Junction
Resv To: YPR/Yesvantpur Junction
Resv Quota: GN
Passenger 1: RAC# 4 (Booking Status: RLWL# 4)
Passenger 2: RAC# 5 (Booking Status: RLWL# 5)
Passenger 3: RAC# 6 (Booking Status: RLWL# 6)
Passenger 4: NOSB//0 (Booking Status: NOSB/NOSB/0)
Passenger 5: NOSB//0 (Booking Status: NOSB/NOSB/0)
Total Fare:  2515
Chart NOT Prepared

Status as of: May 19 2017 (23:08)
Boarding Point: ET/Itarsi Junction
Resv To: YPR/Yesvantpur Junction
Resv Quota: GN
Passenger 1: RAC# 8 (Booking Status: RLWL# 4)
Passenger 2: RLWL# 1 (Booking Status: RLWL# 5)
Passenger 3: RLWL# 2 (Booking Status: RLWL# 6)
Passenger 4: NOSB//0 (Booking Status: NOSB/NOSB/0)
Passenger 5: NOSB//0 (Booking Status: NOSB/NOSB/0)
Total Fare:  2515
Chart NOT Prepared

Status as of: Apr 23 2017 (17:46)
Passenger 1: Waitlist# 4 (Booking Status: W/L 4,RLGN)
Passenger 2: Waitlist# 5 (Booking Status: W/L 5,RLGN)
Passenger 3: Waitlist# 6 (Booking Status: W/L 6,RLGN)
Passenger 4: NOSB (Booking Status: NOSB ,GN)
Passenger 5: NOSB (Booking Status: NOSB ,GN)
Total Fare:  2515
Chart NOT Prepared


  
1272 views
May 21 2017 (08:22)
RAILWAY KA DIL DEKHO ITARSI   582 blog posts   1477 correct pred (56% accurate)
Re# 2247423-1            Tags   Past Edits
#Racallocation 8 from Et to Ypr
  
★★  Rail Fanning
1 Followers
12942 views
Mar 26 2017 (23:04)   16232/Mysuru - Mayiladuthurai (Thanjavur) Express | SBC/KSR Bengaluru City Junction (Bangalore) (10 PFs) | ED/WDM-3D/11183

LHB for TN Express~   1019 blog posts   183 correct pred (70% accurate)
Entry# 2211891            Tags   Past Edits
A NOTE TO ALL VIEWERS :- This is a post of a video; a Journey compilation; every tag in this post is appearing in the video, not tag is random, if anyone feels any tag is unnecessary, please do watch the video first and then point out errors if any. Thank you.
In a sudden trip to Trichy, right in the middle of the monsoon season, the Mysore Mayiladuthurai Express is taken to Tiruchchirapalli; but what is not foreseen is the amount of rains that will lash out and the lightning and thunderstorms that will accompany. The indication is given while at Bengaluru City Jn itself; with Lightning making its presence felt. As the journey progressed; rains started lashing out no
...
more...
sooner had the train departed from Hosur and continued all the way upto Karur late into the night. Fierce spurts of lightning could be seen every now and then. At Kelamangalam, Kongu Express bound for the national capital was looped for us to cross. We reached Salem Junction at a few minutes to midnight; and here Chennai bound Blue Mountain Express and Bengaluru bound Ernakulam Bengaluru Superfast Express crossed us. An hour later; we find ourselves at the ever busy Erode Junction; where as many as 3 trains are sighted in a span of 20minutes that we take for loco reversal, the Bengaluru bound Kannur Yeshvantpur Express; Trivandrum mail from Chennai and Chemmozhi express bound for Coimbatore. While departing after Loco reversal; the announcement for a fourth train also was occurring; the Mangalore Chennai Superfast Express. After Erode, its a sedate run till we knock the gates of Trichy; delay is maintained. At Trichy an array of locos including localites - WDM2; WDP3A and WDP4D of GOC shed welcoming us at the wee hours of the morning.
A Monsoon train journey accompanied by lightning and heavy rains
YT Link - click here
Page#    529 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Desktop site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.