Full Site Search  
Wed Mar 29, 2017 22:41:55 IST
PostPostPost Trn TipPost Trn TipUpload Train PicUpload Train PicAdvanced Search
×
Forum Super Search
Blog Entry#:
Words:

HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Details Edit
Large TB;
Entry# 710709-0
Refresh Live Status (1m ago)

16231/Mayiladuthurai - Mysuru (Thanjavur) Express
மயிலாடுதுறை-மைசூர் எக்ஸ்பிரஸ் / ಮೈಲಾಡುತುರೈ - ಮೈಸೂರು ಎಕ್ಸ್‌ಪ್ರೆಸ್     मयिलाडुतुरै - मैसूरू (तंजावुर) एक्सप्रेस

MV/Mayiladuturai Junction --> MYS/Mysuru Junction (Mysore)

Updated: Oct 01 2016 (09:40) by Minti*^~
Oct 01 2016 (09:40)

Train Forum

Page#    1305 blog entries  next>>
  
Rail Fanning
0 Followers
821 views
Mar 26 2017 (23:04)   16232/Mysuru - Mayiladuthurai (Thanjavur) Express | SBC/KSR Bengaluru City Junction (Bangalore) (10 PFs) | ED/WDM-3D/11183

LHB for TN Express~   965 blog posts   181 correct pred (72% accurate)
Entry# 2211891            Tags   Past Edits
A NOTE TO ALL VIEWERS :- This is a post of a video; a Journey compilation; every tag in this post is appearing in the video, not tag is random, if anyone feels any tag is unnecessary, please do watch the video first and then point out errors if any. Thank you.
In a sudden trip to Trichy, right in the middle of the monsoon season, the Mysore Mayiladuthurai Express is taken to Tiruchchirapalli; but what is not foreseen is the amount of rains that will lash out and the lightning and thunderstorms that will accompany. The indication is given while at Bengaluru City Jn itself; with Lightning making its presence felt. As the journey progressed; rains started lashing out no
...
more...
sooner had the train departed from Hosur and continued all the way upto Karur late into the night. Fierce spurts of lightning could be seen every now and then. At Kelamangalam, Kongu Express bound for the national capital was looped for us to cross. We reached Salem Junction at a few minutes to midnight; and here Chennai bound Blue Mountain Express and Bengaluru bound Ernakulam Bengaluru Superfast Express crossed us. An hour later; we find ourselves at the ever busy Erode Junction; where as many as 3 trains are sighted in a span of 20minutes that we take for loco reversal, the Bengaluru bound Kannur Yeshvantpur Express; Trivandrum mail from Chennai and Chemmozhi express bound for Coimbatore. While departing after Loco reversal; the announcement for a fourth train also was occurring; the Mangalore Chennai Superfast Express. After Erode, its a sedate run till we knock the gates of Trichy; delay is maintained. At Trichy an array of locos including localites - WDM2; WDP3A and WDP4D of GOC shed welcoming us at the wee hours of the morning.
A Monsoon train journey accompanied by lightning and heavy rains
YT Link - click here
  
Predictions: 6
confirm: 0
rac: 0
wl: 6
Journey: Sun Mar 12, 2017 @ 17:45
Class: Sleeper - SL   |   Tot Seats: Avbl >403   |   Charting: < 13:45
Travel: MV/Mayiladuturai Junction   to   BNC/Bengaluru Cantt. (Bangalore)   |   535 km / 677 km
16231/Mayiladuthurai - Mysuru (Thanjavur) Express
Entry# 2195042

PNR: 464-xxxxxxx (E-Ticket)   |   Similar PNRs
Posted Status as of: Mar 12 2017 (13:16)
Passenger 1: S3,15 [SL] (Bo oking Status: W/L 267,HO)
Passenger 2: S3,16 [SU] (Bo oking Status: W/L 268,HO)
Passenger 3: Waitlist# 85 (Booking Status: W/L 269,GNWL)
Passenger 4: Waitlist# 86 (Booking Status: W/L 270,GNWL)
Passenger 5: Waitlist# 87 (Booking Status: W/L 271,GNWL)
Total Fare:  1550
Chart NOT Prepared
Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Mar 12 2017 (14:06)
Passenger 1: S3,15 [SL] (Booking Status: W/L 267,HO)
Passenger 2: S3,16 [SU] (Booking Status: W/L 268,HO)
Passenger 3: Waitlist# 20 (Booking Status: W/L 269,GNWL)
Passenger 4: Waitlist# 21 (Booking Status: W/L 270,GNWL)
Passenger 5: Waitlist# 22 (Booking Status: W/L 271,GNWL)
Total Fare:  1550
Chart PREPARED

Full PNR Status History (5 statuses)
Status as of: Mar 12 2017 (13:46)
Passenger 1: S3,15 [SL] (Booking Status: W/L 267,HO)
Passenger 2: S3,16 [SU] (Booking Status: W/L 268,HO)
Passenger 3: Waitlist# 20 (Booking Status: W/L 269,GNWL)
Passenger 4: Waitlist# 21 (Booking Status: W/L 270,GNWL)
Passenger 5: Waitlist# 22 (Booking Status: W/L 271,GNWL)
Total Fare:  1550
Chart PREPARED

Status as of: Mar 12 2017 (13:46)
Passenger 1:  (Booking Status: W/L 267,HO)
Passenger 2:  (Booking Status: W/L 268,HO)
Passenger 3:  (Booking Status: W/L 269,GNWL)
Passenger 4:  (Booking Status: W/L 270,GNWL)
Passenger 5:  (Booking Status: W/L 271,GNWL)
Total Fare:  1550
Chart NOT Prepared

Status as of: Mar 12 2017 (13:17)
Passenger 1: S3,15 [SL] (Booking Status: W/L 267,HO)
Passenger 2: S3,16 [SU] (Booking Status: W/L 268,HO)
Passenger 3: Waitlist# 79 (Booking Status: W/L 269,GNWL)
Passenger 4: Waitlist# 80 (Booking Status: W/L 270,GNWL)
Passenger 5: Waitlist# 81 (Booking Status: W/L 271,GNWL)
Total Fare:  1550
Chart NOT Prepared

Status as of: Mar 12 2017 (13:15)
Passenger 1: S3,15 [SL] (Booking Status: W/L 267,HO)
Passenger 2: S3,16 [SU] (Booking Status: W/L 268,HO)
Passenger 3: Waitlist# 85 (Booking Status: W/L 269,GNWL)
Passenger 4: Waitlist# 86 (Booking Status: W/L 270,GNWL)
Passenger 5: Waitlist# 87 (Booking Status: W/L 271,GNWL)
Total Fare:  1550
Chart NOT Prepared

Status as of: Mar 11 2017 (14:57)
Passenger 1: Waitlist# 114 (Booking Status: W/L 267,GNWL)
Passenger 2: Waitlist# 115 (Booking Status: W/L 268,GNWL)
Passenger 3: Waitlist# 116 (Booking Status: W/L 269,GNWL)
Passenger 4: Waitlist# 117 (Booking Status: W/L 270,GNWL)
Passenger 5: Waitlist# 118 (Booking Status: W/L 271,GNWL)
Total Fare:  1550
Chart NOT Prepared


  
746 views
Mar 12 2017 (13:46)
rdb*^   30834 blog posts   364148 correct pred (80% accurate)
Re# 2195042-1            Tags   Past Edits
Latest Status as of: Today (13:46)
Passenger 1: (Booking Status: W/L 267,HO)
Passenger 2: (Booking Status: W/L 268,HO)
Passenger 3: (Booking Status: W/L 269,GNWL)
Passenger 4: (Booking Status: W/L 270,GNWL)
Passenger
...
more...
5: (Booking Status: W/L 271,GNWL)
Total Fare: 1550
Chart NOT Prepared
#ChartingIP
TRIP HAS ENDED.
Blog  Time-Table

9 posts - Fri Feb 17, 2017 - are hidden. Click to open.

12 posts - Sat Feb 18, 2017 - are hidden. Click to open.

  
1687 views
Feb 18 2017 (05:38)
Being Educated is Just a statement*^~   11654 blog posts   468 correct pred (66% accurate)
Re# 2168382-22            Tags   Past Edits
at TJ/Thanjavur Junction: 48m late
TJ 5.35/5.38

  
1665 views
Feb 18 2017 (06:04)
Being Educated is Just a statement*^~   11654 blog posts   468 correct pred (66% accurate)
Re# 2168382-23            Tags   Past Edits
at PML/Papanasam: 53m late
6.04

  
1651 views
Feb 18 2017 (06:11)
Being Educated is Just a statement*^~   11654 blog posts   468 correct pred (66% accurate)
Re# 2168382-24            Tags   Past Edits
at SPL/Sundaraperumal Kovil: 48m late
Slowing down.. Crossing with uzhavan Exp mostly

  
1638 views
Feb 18 2017 (06:31)
Being Educated is Just a statement*^~   11654 blog posts   468 correct pred (66% accurate)
Re# 2168382-25            Tags   Past Edits
at KMU/Kumbakonam: 46m late
6.28 KMU

  
1673 views
Feb 18 2017 (06:35)
Being Educated is Just a statement*^~   11654 blog posts   468 correct pred (66% accurate)
Re# 2168382-26            Tags   Past Edits
TRIP HAS ENDED.
_/\_
  
Predictions: 4
confirm: 0
rac: 4
wl: 0
Journey: Sun Feb 12, 2017 @ 19:02
Class: Sleeper - SL
Travel: SBC/KSR Bengaluru City Junction (Bangalore)   to   TRB/Tiruverumbur   |   429 km / 677 km
16232/Mysuru - Mayiladuthurai (Thanjavur) Express
Entry# 2159226

Posted by: चली चली मेरी रेल चली~   1025 blog posts   79 correct pred (85% accurate)
PNR: 432-xxxxxxx (E-Ticket)   |   Similar PNRs
Posted Status as of: Feb 10 2017 (19:12)
Passenger 1: Waitlist# 28 (Booking Status: W/L 46,GNWL)
Total Fare:  300
Chart NOT Prepared
Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Feb 12 2017 (15:01)
Passenger 1: S3,63 [SL] (Booking Status: W/L 46,GNWL)
Total Fare:  300
Chart PREPARED

Full PNR Status History (7 statuses)
Status as of: Feb 12 2017 (15:01)
Passenger 1: S3,63 [SL] (Booking Status: W/L 46,GNWL)
Total Fare:  300
Chart PREPARED

Status as of: Feb 12 2017 (10:55)
Passenger 1: Waitlist# 14 (Booking Status: W/L 46,GNWL)
Total Fare:  300
Chart NOT Prepared

Status as of: Feb 12 2017 (09:52)
Passenger 1: Waitlist# 15 (Booking Status: W/L 46,GNWL)
Total Fare:  300
Chart NOT Prepared

Status as of: Feb 12 2017 (00:45)
Passenger 1: Waitlist# 16 (Booking Status: W/L 46,GNWL)
Total Fare:  300
Chart NOT Prepared

Status as of: Feb 10 2017 (23:38)
Passenger 1: Waitlist# 26 (Booking Status: W/L 46,GNWL)
Total Fare:  300
Chart NOT Prepared

Status as of: Feb 10 2017 (20:15)
Passenger 1: Waitlist# 27 (Booking Status: W/L 46,GNWL)
Total Fare:  300
Chart NOT Prepared

Status as of: Feb 10 2017 (19:12)
Passenger 1: Waitlist# 28 (Booking Status: W/L 46,GNWL)
Total Fare:  300
Chart NOT Prepared


  
1345 views
Feb 10 2017 (20:09)
चली चली मेरी रेल चली~   1025 blog posts   79 correct pred (85% accurate)
Re# 2159226-1            Tags   Past Edits
Predictions friends.
  
General Travel
0 Followers
1422 views
Feb 08 2017 (03:46)   16231/Mayiladuthurai - Mysuru (Thanjavur) Express

Vaneetha Magesh   1 blog posts
Entry# 2155374            Tags   Past Edits
Live arrivals
  
Predictions: 19
confirm: 2
rac: 17
wl: 0
Journey: Fri Jan 13, 2017 @ 19:02
Class: Sleeper - SL   |   Tot Seats: Avbl 275
Travel: SBC/KSR Bengaluru City Junction (Bangalore)   to   MV/Mayiladuturai Junction   |   539 km / 677 km
16232/Mysuru - Mayiladuthurai (Thanjavur) Express
Entry# 2031609

Posted by: piyushabhijeet   0 blog posts   2 correct pred (71% accurate)
PNR: 432-xxxxxxx (PRS)   |   Similar PNRs
Posted Status as of: Oct 21 2016 (16:13)
Passenger 1: Waitlist# 47 (Booking Status: W/L 56,GNWL)
Passenger 2: Waitlist# 48 (Booking Status: W/L 57,GNWL)
Passenger 3: Waitlist# 49 (Booking Status: W/L 58,GNWL)
Passenger 4: Waitlist# 50 (Booking Status: W/L 59,GNWL)
Passenger 5: Waitlist# 51 (Booking Status: W/L 60,GNWL)
Passenger 6: Waitlist# 52 (Booking Status: W/L 61,GNWL)
Total Fare:  2160
Chart NOT Prepared
Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jan 13 2017 (16:32)
Passenger 1: RS2 39 (Booking Status: W/L 56,GNWL)
Passenger 2: RS2 39 (Booking Status: W/L 57,GNWL)
Passenger 3: RS2 47 (Booking Status: W/L 58,GNWL)
Passenger 4: RS2 47 (Booking Status: W/L 59,GNWL)
Passenger 5: RS2 55 (Booking Status: W/L 60,GNWL)
Passenger 6: RS2 55 (Booking Status: W/L 61,GNWL)
Total Fare:  2160
Chart PREPARED

Full PNR Status History (8 statuses)
Status as of: Jan 13 2017 (16:32)
Passenger 1: RS2 39 (Booking Status: W/L 56,GNWL)
Passenger 2: RS2 39 (Booking Status: W/L 57,GNWL)
Passenger 3: RS2 47 (Booking Status: W/L 58,GNWL)
Passenger 4: RS2 47 (Booking Status: W/L 59,GNWL)
Passenger 5: RS2 55 (Booking Status: W/L 60,GNWL)
Passenger 6: RS2 55 (Booking Status: W/L 61,GNWL)
Total Fare:  2160
Chart PREPARED

Status as of: Jan 13 2017 (06:24)
Passenger 1: RAC 48 (Booking Status: W/L 56,GNWL)
Passenger 2: RAC 49 (Booking Status: W/L 57,GNWL)
Passenger 3: RAC 50 (Booking Status: W/L 58,GNWL)
Passenger 4: Waitlist# 1 (Booking Status: W/L 59,GNWL)
Passenger 5: Waitlist# 2 (Booking Status: W/L 60,GNWL)
Passenger 6: Waitlist# 3 (Booking Status: W/L 61,GNWL)
Total Fare:  2160
Chart NOT Prepared

Status as of: Jan 12 2017 (14:29)
Passenger 1: Waitlist# 4 (Booking Status: W/L 56,GNWL)
Passenger 2: Waitlist# 5 (Booking Status: W/L 57,GNWL)
Passenger 3: Waitlist# 6 (Booking Status: W/L 58,GNWL)
Passenger 4: Waitlist# 7 (Booking Status: W/L 59,GNWL)
Passenger 5: Waitlist# 8 (Booking Status: W/L 60,GNWL)
Passenger 6: Waitlist# 9 (Booking Status: W/L 61,GNWL)
Total Fare:  2160
Chart NOT Prepared

Status as of: Jan 12 2017 (11:43)
Passenger 1: Waitlist# 8 (Booking Status: W/L 56,GNWL)
Passenger 2: Waitlist# 9 (Booking Status: W/L 57,GNWL)
Passenger 3: Waitlist# 10 (Booking Status: W/L 58,GNWL)
Passenger 4: Waitlist# 11 (Booking Status: W/L 59,GNWL)
Passenger 5: Waitlist# 12 (Booking Status: W/L 60,GNWL)
Passenger 6: Waitlist# 13 (Booking Status: W/L 61,GNWL)
Total Fare:  2160
Chart NOT Prepared

Status as of: Jan 11 2017 (20:02)
Passenger 1: Waitlist# 13 (Booking Status: W/L 56,GNWL)
Passenger 2: Waitlist# 14 (Booking Status: W/L 57,GNWL)
Passenger 3: Waitlist# 15 (Booking Status: W/L 58,GNWL)
Passenger 4: Waitlist# 16 (Booking Status: W/L 59,GNWL)
Passenger 5: Waitlist# 17 (Booking Status: W/L 60,GNWL)
Passenger 6: Waitlist# 18 (Booking Status: W/L 61,GNWL)
Total Fare:  2160
Chart NOT Prepared

Status as of: Jan 08 2017 (17:58)
Passenger 1: Waitlist# 36 (Booking Status: W/L 56,GNWL)
Passenger 2: Waitlist# 37 (Booking Status: W/L 57,GNWL)
Passenger 3: Waitlist# 38 (Booking Status: W/L 58,GNWL)
Passenger 4: Waitlist# 39 (Booking Status: W/L 59,GNWL)
Passenger 5: Waitlist# 40 (Booking Status: W/L 60,GNWL)
Passenger 6: Waitlist# 41 (Booking Status: W/L 61,GNWL)
Total Fare:  2160
Chart NOT Prepared

Status as of: Dec 12 2016 (17:58)
Passenger 1: Waitlist# 42 (Booking Status: W/L 56,GNWL)
Passenger 2: Waitlist# 43 (Booking Status: W/L 57,GNWL)
Passenger 3: Waitlist# 44 (Booking Status: W/L 58,GNWL)
Passenger 4: Waitlist# 45 (Booking Status: W/L 59,GNWL)
Passenger 5: Waitlist# 46 (Booking Status: W/L 60,GNWL)
Passenger 6: Waitlist# 47 (Booking Status: W/L 61,GNWL)
Total Fare:  2160
Chart NOT Prepared

Status as of: Oct 21 2016 (16:13)
Passenger 1: Waitlist# 47 (Booking Status: W/L 56,GNWL)
Passenger 2: Waitlist# 48 (Booking Status: W/L 57,GNWL)
Passenger 3: Waitlist# 49 (Booking Status: W/L 58,GNWL)
Passenger 4: Waitlist# 50 (Booking Status: W/L 59,GNWL)
Passenger 5: Waitlist# 51 (Booking Status: W/L 60,GNWL)
Passenger 6: Waitlist# 52 (Booking Status: W/L 61,GNWL)
Total Fare:  2160
Chart NOT Prepared


  
2157 views
Jan 13 2017 (10:42)
rdb*^   30834 blog posts   364148 correct pred (80% accurate)
Re# 2031609-1            Tags   Past Edits
Latest Status as of: Today (06:24) Refresh Status wait
Passenger 1: RAC 48 (Booking Status: W/L 56,GNWL)
Passenger 2: RAC 49 (Booking Status: W/L 57,GNWL)
Passenger 3: RAC 50 (Booking Status: W/L 58,GNWL)
Passenger
...
more...
4: Waitlist# 1 (Booking Status: W/L 59,GNWL)
Passenger 5: Waitlist# 2 (Booking Status: W/L 60,GNWL)
Passenger 6: Waitlist# 3 (Booking Status: W/L 61,GNWL)
Total Fare: 2160
Chart NOT Prepared
#RACallocation
50 in sleeper GNWL
  
Predictions: 0
confirm: 0
rac: 0
wl: 0
Journey: Fri Jan 13, 2017 @ 19:38
Class: Sleeper - SL   |   Tot Seats: Avbl >232
Travel: CRLM/Karmelaram   to   SA/Salem Junction   |   194 km / 677 km
16232/Mysuru - Mayiladuthurai (Thanjavur) Express
Entry# 2124927

Posted by: rocketwec~   29 blog posts   11457 correct pred (90% accurate)
PNR: 412-xxxxxxx (PRS)   |   Similar PNRs
Posted Status as of: Jan 12 2017 (19:20)
Passenger 1: Confirmed (Booking Status: S3,38,HO)
Total Fare:  0
Chart NOT Prepared
Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jan 12 2017 (19:24)
Passenger 1: Confirmed (Booking Status: S3,38,HO)
Total Fare:  0
Chart NOT Prepared

  
1947 views
Jan 12 2017 (19:22)
rocketwec~   29 blog posts   11457 correct pred (90% accurate)
Re# 2124927-1            Tags   Past Edits
  
Predictions: 12
confirm: 12
rac: 0
wl: 0
Journey: Mon Jan 09, 2017 @ 23:40
Class: Sleeper - SL   |   Tot Seats: Avbl >399
Travel: ED/Erode Junction   to   BNC/Bengaluru Cantt. (Bangalore)   |   273 km / 677 km
16231/Mayiladuthurai - Mysuru (Thanjavur) Express
Entry# 2107690

Posted by: Tejas*^~   6428 blog posts   4340 correct pred (64% accurate)
PNR: 422-xxxxxxx (PRS)   |   Similar PNRs
Posted Status as of: Dec 28 2016 (08:23)
Passenger 1: Waitlist# 45 (Booking Status: W/L 54,GNWL)
Total Fare:  0
Chart NOT Prepared
Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jan 09 2017 (17:31)
Passenger 1: S5,71 [SL] (Booking Status: W/L 54,GNWL)
Total Fare:  0
Chart PREPARED

Full PNR Status History (13 statuses)
Status as of: Jan 09 2017 (17:31)
Passenger 1: S5,71 [SL] (Booking Status: W/L 54,GNWL)
Total Fare:  0
Chart PREPARED

Status as of: Jan 09 2017 (07:18)
Passenger 1: RAC 86 (Booking Status: W/L 54,GNWL)
Total Fare:  0
Chart NOT Prepared

Status as of: Jan 08 2017 (19:09)
Passenger 1: RAC 87 (Booking Status: W/L 54,GNWL)
Total Fare:  0
Chart NOT Prepared

Status as of: Jan 08 2017 (07:43)
Passenger 1: RAC 90 (Booking Status: W/L 54,GNWL)
Total Fare:  0
Chart NOT Prepared

Status as of: Jan 07 2017 (07:43)
Passenger 1: RAC 99 (Booking Status: W/L 54,GNWL)
Total Fare:  0
Chart NOT Prepared

Status as of: Jan 06 2017 (06:58)
Passenger 1: Waitlist# 6 (Booking Status: W/L 54,GNWL)
Total Fare:  0
Chart NOT Prepared

Status as of: Jan 05 2017 (08:33)
Passenger 1: Waitlist# 18 (Booking Status: W/L 54,GNWL)
Total Fare:  0
Chart NOT Prepared

Status as of: Jan 04 2017 (11:09)
Passenger 1: Waitlist# 27 (Booking Status: W/L 54,GNWL)
Total Fare:  0
Chart NOT Prepared

Status as of: Jan 03 2017 (12:58)
Passenger 1: Waitlist# 29 (Booking Status: W/L 54,GNWL)
Total Fare:  0
Chart NOT Prepared

Status as of: Jan 02 2017 (16:56)
Passenger 1: Waitlist# 30 (Booking Status: W/L 54,GNWL)
Total Fare:  0
Chart NOT Prepared

Status as of: Dec 31 2016 (17:36)
Passenger 1: Waitlist# 37 (Booking Status: W/L 54,GNWL)
Total Fare:  0
Chart NOT Prepared

Status as of: Dec 30 2016 (19:31)
Passenger 1: Waitlist# 43 (Booking Status: W/L 54,GNWL)
Total Fare:  0
Chart NOT Prepared

Status as of: Dec 28 2016 (08:23)
Passenger 1: Waitlist# 45 (Booking Status: W/L 54,GNWL)
Total Fare:  0
Chart NOT Prepared


  
2086 views
Jan 09 2017 (17:31)
PIyUsH SInGH™^~   1708 blog posts   1779 correct pred (74% accurate)
Re# 2107690-1            Tags   Past Edits
Happy journey☺☺
  
Predictions: 0
confirm: 0
rac: 0
wl: 0
Journey: Tue Mar 15, 2011 @ 20:35
Class: Sleeper - SL   |   Tot Seats: Avbl 359
Travel: TPJ/Tiruchchirappalli Junction   to   MYS/Mysuru Junction (Mysore)   |   556 km / 677 km
16231/Mayiladuthurai - Mysuru (Thanjavur) Express

PNR: 412-xxxxxxx    |   Similar PNRs
Entry# 2110584        
Posted Status as of: Dec 30 2016 (17:04)
Passenger 1: Waitlist# 35 (Booking Status: W/L 138,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Mar 14 2011 (18:10) 
Passenger 1: Waitlist# 35 (Booking Status: W/L 138,GNWL)
Chart NOT Prepared

  
2191 views
Dec 30 2016 (17:05)
Banerjee™^~   2757 blog posts   27755 correct pred (75% accurate)
Re# 2110584-1            Tags   Past Edits
  
General Travel
0 Followers
6591 views
Dec 21 2016 (14:24)   16232/Mysuru - Mayiladuthurai (Thanjavur) Express | MYS/Mysuru Junction (Mysore) (6 PFs)

Prometh Suresh   131 blog posts   221 correct pred (67% accurate)
Entry# 2098640            Tags   Past Edits
Pay AC Chair car fare for 3AC
Mangaluru : SWR introduced AC Chair Car fare for 3A coaches of 5 trains b/w SBC-MYS since last month.One can pay ₹260 on Kaveri, Mayiladuthurai, Hampi, Golgumbaz and Thoothukudi(Tuticorin) express trains with railways allotting 1 3A coach in these trains for the purpose.The decision appears to have been taken following 3A coaches remaining empty b/w MYS-SBC-MYS. While current booking of seats begins 1 hour before the departure of these trains online booking is available for journeys starting from February only
Page#    1305 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Desktop site