Full Site Search  
Tue Jan 17, 2017 18:36:06 IST
PostPostPost Trn TipPost Trn TipUpload Train PicUpload Train PicAdvanced Search
×
Forum Super Search
Blog Entry#:
Words:

HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Refresh Live Status (15m ago)

15714/Patna - Katihar InterCity Express
     पटना - कटिहार इंटरसिटी एक्सप्रेस

PNBE/Patna Junction --> KIR/Katihar Junction

Updated: Oct 24 2016 (10:48) by 152 years of Bengaluru Mail^~
Oct 24 2016 (10:48)

Train Forum

Page#    34 blog entries  next>>
  
★★★  Rail Fanning
0 Followers
4643 views
Jan 10 2015 (18:51)   15713/Katihar - Patna InterCity Express | BARH/Barh (3 PFs) | SGUJ/WDP-4/20013
 

RAJWDP4   2796 blog posts   93 correct pred (54% accurate)
Entry# 1336522            Tags   Past Edits
15713 Kir Pnbe intercity exp with NFR beauty Queen WDP 4-20013 SGUJ BAAZ EDITION.

2 posts - Sun Jan 11, 2015

  
2291 views
Jan 28 2015 (17:07)
RAJWDP4   2796 blog posts   93 correct pred (54% accurate)
Re# 1336522-3            Tags   Past Edits
no wdp 4/4b/4b are regular link of this train.

  
Jan 28 2015 (18:31)
×Kosi Ganga Super £xpress×   1670 blog posts
Re# 1336522-4            Tags   Past Edits
ek wap4 v jhak rha hai left side se!!. Nice click , beautiful loco. Lg rha hai ek bihari station.

  
2171 views
Jan 28 2015 (18:50)
RAJWDP4   2796 blog posts   93 correct pred (54% accurate)
Re# 1336522-5            Tags   Past Edits
that is MGS WAP 4 #22977 with DRM inspection saloon.

  
1537 views
Oct 07 2015 (21:13)
Abhishek Jaiswal   44098 blog posts   18249 correct pred (69% accurate)
Re# 1336522-6            Tags   Past Edits
Blog Entry Unlocked.
on request

  
2208 views
Oct 09 2015 (12:41)
RAJWDP4   2796 blog posts   93 correct pred (54% accurate)
Re# 1336522-7            Tags   Past Edits
#Admin can this be updated as locopic of SGUJ WDP-4 20013?
  
General Travel
0 Followers
772 views
Dec 17 2016 (14:04)   15713/Katihar - Patna InterCity Express | FUT/Fatuha Junction (7 PFs) | SPJ/WDM-3D/11531

पूर्वा एक्सप्रेस   7138 blog posts   118 correct pred (73% accurate)
Entry# 2094092            Tags   Past Edits
कटिहार पटना इंटरसिटी गुजरता fatuha

3 posts - Sat Dec 17, 2016

  
641 views
Dec 17 2016 (14:29)
पूर्वा एक्सप्रेस   7138 blog posts   118 correct pred (73% accurate)
Re# 2094092-4            Tags   Past Edits
Kaise ?

  
611 views
Dec 17 2016 (15:14)
PIyUsH SInGH™   1400 blog posts   1474 correct pred (73% accurate)
Re# 2094092-5            Tags   Past Edits
It is pooled by WDP-4D shed-SGUJ

  
553 views
Dec 17 2016 (16:23)
पूर्वा एक्सप्रेस   7138 blog posts   118 correct pred (73% accurate)
Re# 2094092-6            Tags   Past Edits
Pooled or haul me kya antar hai ?? Re Bhai ??

  
566 views
Dec 17 2016 (16:30)
OHE over JBP   983 blog posts   61 correct pred (72% accurate)
Re# 2094092-7            Tags   Past Edits
Iska regular link WDP4D hai SGUJ shed ka. Ye offlink hai. Nice pic btw :)

  
505 views
Dec 17 2016 (20:17)
पूर्वा एक्सप्रेस   7138 blog posts   118 correct pred (73% accurate)
Re# 2094092-8            Tags   Past Edits
Train pickup me tha...aise clic kiya andaza me
  
General Travel
0 Followers
2024 views
Sep 22 2016 (12:43)   15713/Katihar - Patna InterCity Express
 

पूर्वा एक्सप्रेस   7138 blog posts   118 correct pred (73% accurate)
Entry# 1998851            Tags   Past Edits
Kya ye train Kisangani SE chal sakta hai

2 posts - Thu Sep 22, 2016

1 posts - Fri Sep 23, 2016

  
1579 views
Sep 23 2016 (11:18)
Rahul K😎🚂   1766 blog posts   2038 correct pred (76% accurate)
Re# 1998851-4            Tags   Past Edits
Agree bhai.. DRM offc shud be shiftd from Katihar to Siliguri/NJP and KIR shud become part of ECR/Sonpur, then only we can hope of some originating trains from KIR..

  
1475 views
Sep 23 2016 (16:19)
hbkspecial   8 blog posts
Re# 1998851-5            Tags   Past Edits
don't think lyk tht...it never possible tht any div.headquarter cn b shftd anywhr and tht wil degraded with under any othr div... KIR ppl are weak politicaly bt they r nt fool tht they wil allow to tht....i strongly condemn ur dream tht u wnt tht KIR b degraded and lose thr headquarter ........ instd if u wnt it in ECR thn keep it along wid its divisional status.... its just ridiculous hw u think so,ryt frm starting u r against KIR...don't know why.....prhps i wrote sm of its needful demand whch ws shftd smwhr....

  
1416 views
Sep 24 2016 (01:13)
Rahul K😎🚂   1766 blog posts   2038 correct pred (76% accurate)
Re# 1998851-6            Tags   Past Edits
hahaha.. bhai don't take it seriously.. even I am from Katihar and want development of KIR as much as u want..
my comment was a sarcastic one, looking at the sad condition of railways in KIR.. Do not take it seriously :)

  
1296 views
Sep 24 2016 (10:33)
hbkspecial   8 blog posts
Re# 1998851-7            Tags   Past Edits
kkk....i urge u pls! tweet n all othr means, to RM and KIR representative abt needful&rightful demabd f KIR... bro it ws our unawareness tht we lost many projects til nw fr whch KIR was equally eligible.... see the mldt loco shed example( though m nt against to any place) wht a strange,it z f NFR- KIR div.shed bt is in ER territory!!! ...why it so...ws thr crunch f land in NFR-KIR hq.???...certainly no...it ws our weak represntative who never raised abt neglecting KIR rights....othrs r among today no much originating trains except few,virtually it became road station.... janshatbdi stopped on ground f loss,and this loss was due to ill maintainance & late running bkoz of war between ECR&NFR.....RRB sud b at KIR bt made at SGU(thr z 3 RRB in bengal,bt only 2 in bihar,thr z only 2+1 loco shed in bihar bt in begal thr z 8 )...why...
more...
this disparity....it seems its nt indian railway....its bengal railway(again i say m nt against any region bt against to disparity)......today KIR z only fr name as div hq...bt virtually ruled by NJP as a div.hq.status......thts y i wnt KIR div.with retaining its Divisional status to transfer in ECR asap whch was earlier proposed to b in ECR at the tym f ECR formation bt kept aside...also e-loco shed must b at KIR hq. .

  
1202 views
Sep 25 2016 (01:25)
Rahul K😎🚂   1766 blog posts   2038 correct pred (76% accurate)
Re# 1998851-8            Tags   Past Edits
Can't agree more :)
  
General Travel
0 Followers
1094 views
Sep 21 2016 (19:08)   15713/Katihar - Patna InterCity Express
 

पूर्वा एक्सप्रेस   7138 blog posts   118 correct pred (73% accurate)
Entry# 1998202            Tags   Past Edits
Speed itna kum aur Fatuha me stoppage nahi
  
General Travel
0 Followers
1186 views
Sep 21 2016 (19:07)   15713/Katihar - Patna InterCity Express
 

पूर्वा एक्सप्रेस   7138 blog posts   118 correct pred (73% accurate)
Entry# 1998201            Tags   Past Edits
This train was first Jan shatabdi express of Indian railways..

  
Sep 22 2016 (11:41)
भूत हूँ मैं   3291 blog posts   3077 correct pred (82% accurate)
Re# 1998201-1            Tags   Past Edits
Agree!
But due to low patronage, it was converted to normal ICE.
  
General Travel
0 Followers
1087 views
Sep 22 2016 (12:42)   15713/Katihar - Patna InterCity Express
 

पूर्वा एक्सप्रेस   7138 blog posts   118 correct pred (73% accurate)
Entry# 1998849            Tags   Past Edits
Why not daily
  
General Travel
0 Followers
1470 views
Sep 14 2016 (07:41)   15714/Patna - Katihar InterCity Express
 

amaljha411   231 blog posts
Entry# 1990974            Tags   Past Edits
Now mne- kir section is completely electrified according to new Atlas update. So now it should be hauled by eloco end to end. That loco can be MGS shed WAP 4.

  
1328 views
Sep 14 2016 (23:54)
Rahul K😎🚂   1766 blog posts   2038 correct pred (76% accurate)
Re# 1990974-1            Tags   Past Edits
Some work at KIR is still pending.. MNE-KIR CRS inspection is also pending.. Wish we had someone like NER GM.. Kabka start ho chuka hota KIR-BJU route bhi.

  
1288 views
Sep 14 2016 (23:57)
©The Dark Lord™   3905 blog posts
Re# 1990974-2            Tags   Past Edits
MNE-KIR ka CRS ho gaya kya?

  
1279 views
Sep 15 2016 (00:02)
Rahul K😎🚂   1766 blog posts   2038 correct pred (76% accurate)
Re# 1990974-3            Tags   Past Edits
Nahi bhai.. Not yet..
ECR-NFR co-ordination ka locha lag raha hai.. Kaam ruka pada hai kab se..
  
General Travel
0 Followers
2059 views
Sep 06 2016 (22:18)   15714/Patna - Katihar InterCity Express
 

amaljha411   231 blog posts
Entry# 1983296            Tags   Past Edits
Ise MGS WAP 4 de do as its route is 100% electrified. It would save energy, time, environment.

2 posts - Tue Sep 06, 2016

  
1568 views
Sep 06 2016 (23:56)
IR no more Safe   16874 blog posts   93168 correct pred (74% accurate)
Re# 1983296-3            Tags   Past Edits
kisine jaldi me update kia hoga.
kuch kam rehta hai KIR tak.
Dec -Jan tak ho jayega.

  
1618 views
Sep 07 2016 (00:11)
PatrickB   52 blog posts
Re# 1983296-4            Tags   Past Edits
Hmmmmm!!!!!
Your point is right but the thing
is that some of the work is left
at Katihar station area.
And expected to be complete in
the
...
more...
month of December of this
year or January of next year.
Then it is possible to run by
Electric Locomotive.

  
1553 views
Sep 07 2016 (00:18)
PatrickB   52 blog posts
Re# 1983296-5            Tags   Past Edits
No!!!!!
It is electrified route that's why
it is indicating like this.
And current is flowing in the wire.
Biggest reason is that
some
...
more...
of the incident robbery of wire
took place so to avoid it railway has
decided that the section where work is done
there without any further delay pass the
current in the wires.

  
1391 views
Sep 09 2016 (21:16)
Rohan Damodar S   15 blog posts   32 correct pred (89% accurate)
Re# 1983296-6            Tags   Past Edits
Not completely electrified.

  
1358 views
Sep 09 2016 (21:18)
amaljha411   231 blog posts
Re# 1983296-7            Tags   Past Edits
Bahot jaldi bata diya
  
General Travel
0 Followers
1708 views
Jun 24 2016 (02:23)   15714/Patna - Katihar InterCity Express
 

amaljha411   231 blog posts
Entry# 1905172            Tags   Past Edits
Now long awaited bju-kir section is electrified. So now some trains should run on e loco in this section.
1. 15713/14- E2E MGS WAP4
2. 12505/05 KIR-ANVT
3. 12487/88, 22487/22488 KIR-ANVT
4. 55537/38 E2E
5.
...
more...
55521/22 E2E(KIR-BJU)
6. 55539/40 E2E( KIR-HJP)

  
1638 views
Jun 24 2016 (19:13)
Rahul K😎🚂   1766 blog posts   2038 correct pred (76% accurate)
Re# 1905172-1            Tags   Past Edits
KIR-Mansi CRS inspection is still pending bro..
  
General Travel
0 Followers
2190 views
Jun 22 2016 (11:19)   15713/Katihar - Patna InterCity Express | KIR/Katihar Junction (7 PFs) | SGUJ/WDP-4D/40096
 

Aakash The Don Sharma   99 blog posts   319 correct pred (72% accurate)
Entry# 1903308            Tags   Past Edits
KIR-PNBE I/C EXPRESS departing Katihar

  
2048 views
Jun 22 2016 (11:49)
Jayashree ❖ Amita*^   11626 blog posts   97034 correct pred (77% accurate)
Re# 1903308-1            Tags   Past Edits

  
1919 views
Jun 22 2016 (12:16)
Rahul K😎🚂   1766 blog posts   2038 correct pred (76% accurate)
Re# 1903308-2            Tags   Past Edits
Old pic I guess!! No OHE wires in KIR??

  
1850 views
Jun 22 2016 (13:14)
Aakash The Don Sharma   99 blog posts   319 correct pred (72% accurate)
Re# 1903308-3            Tags   Past Edits
Yes... This is an old pic

  
1795 views
Jun 22 2016 (13:17)
Aakash The Don Sharma   99 blog posts   319 correct pred (72% accurate)
Re# 1903308-4            Tags   Past Edits
2014 ka pic hai
Page#    34 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Desktop site