Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Purvanchal Express - Poorvottar ka Sikandar

Search Gallery
Post PNR
Side View; Large TB; EOG/SLR; Outside of Train; Standing at Station;
Entry# 5632436-0
Night Pic; Side View; Small TB; Outside of Train;
Entry# 5638366-0


Availability Calendar
Search MTM to DMM
Return# 17216
PDF Download

17215/Machilipatnam - Dharmavaram Express
मचिलीपट्णम - धर्मवरम एक्सप्रेस

MTM/Machilipatnam --> DMM/Dharmavaram Junction

Updated: Apr 26 (09:07) by aaqibahamad~
Apr 26 (09:07)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Picture & Video Gallery

Page#    54 Pic/Video Blogs  <<prev  next>>

17215/Machilipatnam - Dharmavaram Express

MTM/Machilipatnam


5580 views
2

Cumbum-tarlupadu everything completed except the major bridge. One km stretch wiring is pending from talupadu.one time trampling with machine is required. Signal wires are laid and need to be closed with soil. So, JBK puram-tarlupadu is in June. In may it may not be possible. One more goods train waiting for signal in tarlupadu towards nandyala. Two PFs with 2 loop lines in tarlupadu.
×

17215/Machilipatnam - Dharmavaram Express

MTM/Machilipatnam


5580 views
2

Cumbum-tarlupadu everything completed except the major bridge. One km stretch wiring is pending from talupadu.one time trampling with machine is required. Signal wires are laid and need to be closed with soil. So, JBK puram-tarlupadu is in June. In may it may not be possible. One more goods train waiting for signal in tarlupadu towards nandyala. Two PFs with 2 loop lines in tarlupadu.
×

17215/Machilipatnam - Dharmavaram Express

MTM/Machilipatnam


5580 views
2

Cumbum-tarlupadu everything completed except the major bridge. One km stretch wiring is pending from talupadu.one time trampling with machine is required. Signal wires are laid and need to be closed with soil. So, JBK puram-tarlupadu is in June. In may it may not be possible. One more goods train waiting for signal in tarlupadu towards nandyala. Two PFs with 2 loop lines in tarlupadu.
×

17215/Machilipatnam - Dharmavaram Express

MTM/Machilipatnam


5344 views
3

Total land is levelled from yedavalli to somidevipalli except two minor bridges and one major bridge. Minor bridges nearing completion and major bridge will take 1 or 2 months for completion. Very huge amount of ballast is procured and placed near yadavalli that is sufficient for entire ghat section. No electric pole pits from giddalur to gudimitta. Two goods trains with twin locos are waiting for signal at somidevipalli towards nandyala.
×

17215/Machilipatnam - Dharmavaram Express

MTM/Machilipatnam


5344 views
3

Total land is levelled from yedavalli to somidevipalli except two minor bridges and one major bridge. Minor bridges nearing completion and major bridge will take 1 or 2 months for completion. Very huge amount of ballast is procured and placed near yadavalli that is sufficient for entire ghat section. No electric pole pits from giddalur to gudimitta. Two goods trains with twin locos are waiting for signal at somidevipalli towards nandyala.
×

17215/Machilipatnam - Dharmavaram Express

MTM/Machilipatnam


5344 views
3

Total land is levelled from yedavalli to somidevipalli except two minor bridges and one major bridge. Minor bridges nearing completion and major bridge will take 1 or 2 months for completion. Very huge amount of ballast is procured and placed near yadavalli that is sufficient for entire ghat section. No electric pole pits from giddalur to gudimitta. Two goods trains with twin locos are waiting for signal at somidevipalli towards nandyala.
×

17215/Machilipatnam - Dharmavaram Express

MTM/Machilipatnam


5344 views
3

Total land is levelled from yedavalli to somidevipalli except two minor bridges and one major bridge. Minor bridges nearing completion and major bridge will take 1 or 2 months for completion. Very huge amount of ballast is procured and placed near yadavalli that is sufficient for entire ghat section. No electric pole pits from giddalur to gudimitta. Two goods trains with twin locos are waiting for signal at somidevipalli towards nandyala.
×

17215/Machilipatnam - Dharmavaram Express

MTM/Machilipatnam


5344 views
3

Total land is levelled from yedavalli to somidevipalli except two minor bridges and one major bridge. Minor bridges nearing completion and major bridge will take 1 or 2 months for completion. Very huge amount of ballast is procured and placed near yadavalli that is sufficient for entire ghat section. No electric pole pits from giddalur to gudimitta. Two goods trains with twin locos are waiting for signal at somidevipalli towards nandyala.
×

17215/Machilipatnam - Dharmavaram Express

MTM/Machilipatnam


5454 views
3

After giddalur land works started and chips also poured for levelleing. Ghat also cleared b/w giddalur-yadavalli. Work force is seen near by the track
×

17215/Machilipatnam - Dharmavaram Express

MTM/Machilipatnam


5454 views
3

After giddalur land works started and chips also poured for levelleing. Ghat also cleared b/w giddalur-yadavalli. Work force is seen near by the track
×

17215/Machilipatnam - Dharmavaram Express

MTM/Machilipatnam


54361 views
2

2 3 AC coaches permanently augumented. With this sufficient AC coaches are there. Need to augument Sleeper coaches.
×

17215/Machilipatnam - Dharmavaram Express


24986 views
3

Some more partial cancellations & diversions
×
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy