Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Forget AI; our RailFans are endowed with NI - Natural Intelligence

Search Gallery
Post PNR
Availability Calendar
Search DNR to NJP
Return# 12505
PDF Download

12506/North East Express
Other Names: SUPER
नॉर्थ ईस्ट एक्सप्रेस

DNR/Danapur --> NJP/New Jalpaiguri Junction

Updated: Aug 20 (23:37) by Siddharth98^~
Aug 20 (23:37)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Picture & Video Gallery

Page#    252 Pic/Video Blogs  next>>

12506/North East Express

NYN/Naini Junction


36363 views
17

The story through the blurred frames.1. A JHS ALCo and a DDU(D) WAG-7 waiting alongside empty coaches before Naini.2. A SPJ WAP-4 standing with the idle rake of ET-PCOI Express, probably.3. A monkey crossing the tracks in rain, with a row of red-lit signals in the background.4. Poorva Express rushing past a deserted station between JNH and PRYJ.5. A GZB WAP-5 and a TKD WDP-4D wait with their consists while being overtaken by Poorva Express somewhere around PFM. Interestingly all the UP tracks were occupied by trains waiting for Poorva to pass.
×

12506/North East Express

NYN/Naini Junction


36363 views
17

The story through the blurred frames.1. A JHS ALCo and a DDU(D) WAG-7 waiting alongside empty coaches before Naini.2. A SPJ WAP-4 standing with the idle rake of ET-PCOI Express, probably.3. A monkey crossing the tracks in rain, with a row of red-lit signals in the background.4. Poorva Express rushing past a deserted station between JNH and PRYJ.5. A GZB WAP-5 and a TKD WDP-4D wait with their consists while being overtaken by Poorva Express somewhere around PFM. Interestingly all the UP tracks were occupied by trains waiting for Poorva to pass.
×

12506/North East Express

NYN/Naini Junction


36363 views
17

The story through the blurred frames.1. A JHS ALCo and a DDU(D) WAG-7 waiting alongside empty coaches before Naini.2. A SPJ WAP-4 standing with the idle rake of ET-PCOI Express, probably.3. A monkey crossing the tracks in rain, with a row of red-lit signals in the background.4. Poorva Express rushing past a deserted station between JNH and PRYJ.5. A GZB WAP-5 and a TKD WDP-4D wait with their consists while being overtaken by Poorva Express somewhere around PFM. Interestingly all the UP tracks were occupied by trains waiting for Poorva to pass.
×

12506/North East Express

NYN/Naini Junction


36363 views
17

The story through the blurred frames.1. A JHS ALCo and a DDU(D) WAG-7 waiting alongside empty coaches before Naini.2. A SPJ WAP-4 standing with the idle rake of ET-PCOI Express, probably.3. A monkey crossing the tracks in rain, with a row of red-lit signals in the background.4. Poorva Express rushing past a deserted station between JNH and PRYJ.5. A GZB WAP-5 and a TKD WDP-4D wait with their consists while being overtaken by Poorva Express somewhere around PFM. Interestingly all the UP tracks were occupied by trains waiting for Poorva to pass.
×

12506/North East Express

NYN/Naini Junction


36363 views
17

The story through the blurred frames.1. A JHS ALCo and a DDU(D) WAG-7 waiting alongside empty coaches before Naini.2. A SPJ WAP-4 standing with the idle rake of ET-PCOI Express, probably.3. A monkey crossing the tracks in rain, with a row of red-lit signals in the background.4. Poorva Express rushing past a deserted station between JNH and PRYJ.5. A GZB WAP-5 and a TKD WDP-4D wait with their consists while being overtaken by Poorva Express somewhere around PFM. Interestingly all the UP tracks were occupied by trains waiting for Poorva to pass.
×

12506/North East Express

ANVT/Anand Vihar Terminal

TKD/WAP-7/30496


46232 views
5

12506 North East Express With 30496 TKD WAP-7 Standing on PF4 of ANVT
×

12506/North East Express

ANVT/Anand Vihar Terminal

TKD/WAP-7/30496


46232 views
5

12506 North East Express With 30496 TKD WAP-7 Standing on PF4 of ANVT
×

12506/North East Express

ANVT/Anand Vihar Terminal

TKD/WAP-7/30496


46232 views
5

12506 North East Express With 30496 TKD WAP-7 Standing on PF4 of ANVT
×

12506/North East Express

ANVT/Anand Vihar Terminal

TKD/WAP-7/30496


46232 views
5

12506 North East Express With 30496 TKD WAP-7 Standing on PF4 of ANVT
×

12506/North East Express

ANVT/Anand Vihar Terminal

TKD/WAP-7/30496


46232 views
5

12506 North East Express With 30496 TKD WAP-7 Standing on PF4 of ANVT
×

12506/North East Express

ANVT/Anand Vihar Terminal

TKD/WAP-7/30496


46232 views
5

12506 North East Express With 30496 TKD WAP-7 Standing on PF4 of ANVT
×

12310/New Delhi - Rajendra Nagar Terminal Tejas Rajdhani Express

PRYJ/Prayagraj Junction (Allahabad)


1947592 views
7

Temporary Platform Change of following trains at Prayagraj Jn due to upgradation work on Platform 4,5wef 12/06/2024
×

12506/North East Express

RPR/Raghunathpur

GZB/WAP-7/30521


59363 views
3

Final report of 12506 accident at Raghunathpur (RPR).Track fatigue and failure of DNR division Engineering department to detect the failure main reason. UFSD report of track testing two months ago at the accident site is also present.Also 30521 GZB WAP 7 had some wheel defect issue related to dia which was not properly attended by GZB loco shed. Source-Rail whisper
×

12506/North East Express

RPR/Raghunathpur

GZB/WAP-7/30521


59363 views
3

Final report of 12506 accident at Raghunathpur (RPR).Track fatigue and failure of DNR division Engineering department to detect the failure main reason. UFSD report of track testing two months ago at the accident site is also present.Also 30521 GZB WAP 7 had some wheel defect issue related to dia which was not properly attended by GZB loco shed. Source-Rail whisper
×

12506/North East Express

RPR/Raghunathpur

GZB/WAP-7/30521


59363 views
3

Final report of 12506 accident at Raghunathpur (RPR).Track fatigue and failure of DNR division Engineering department to detect the failure main reason. UFSD report of track testing two months ago at the accident site is also present.Also 30521 GZB WAP 7 had some wheel defect issue related to dia which was not properly attended by GZB loco shed. Source-Rail whisper
×

71366 views
0

@RPR   7m late@RPR: Raghunathpur &25 km/h #12506: North East Express accident site
×

71366 views
0

@RPR   7m late@RPR: Raghunathpur &25 km/h #12506: North East Express accident site
×

71366 views
0

@RPR   7m late@RPR: Raghunathpur &25 km/h #12506: North East Express accident site
×
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy