Full Site Search  
Wed Mar 29, 2017 18:57:47 IST
PostPostPost Trn TipPost Trn TipUpload Train PicUpload Train Pic
Details Edit
Large TB;
Entry# 467343-0
Refresh Live Status (not updated)

12153/Mumbai LTT - Bhopal Habibganj SF Express
मुंबई लोकमान्य टिळक टर्मिनस - भोपाळ हबीबगंज सुपरफास्ट एक्सप्रेस     मुंबई लोकमान्य तिलक टर्मिनस - भोपाल हबीबगंज सुपरफास्ट एक्सप्रेस

LTT/Lokmanya Tilak Terminus --> HBJ/Bhopal HabibGanj

Updated: Jan 16 2017 (23:03) by Saif Ali^~
Jan 16 2017 (23:03)
This is the Shortest Route between LTT and HBJ.
Departs @ 16:25 (Avg on time)
Platform# 2
    T  
Arrives @ 05:30 +1 night (Avg 1m late)
Platform# 4
     F 
Type: SuperFast     Zone: CR/Central
Travel Time: 13h 5m     9 halts
Distance: 817 km     Avg Speed: 62 km/hr
Max Permissible Speed: 109 km/hr between MMR/Manmad Junction and BSL/Bhusaval Junction
Latest News
(You need to double-check/verify this info yourself)
--
Fri Mar 04, 2016 (01:30AM)
Rating: 3.8/5 (17 votes)
cleanliness - good (3)
punctuality - good (3)
food - good (3)
ticket avbl - good (3)
u/r coach - good (2)
railfanning - good (3)
safety - good (2)
Pantry/Catering
✓ Pantry Car
✓ On-board Catering
✓ E-Catering
ICF Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
GEN
  3
GEN
  4
 A1
  5
 B3
  6
 B2
  7
 B1
  8
S13
  9
 PC
 18
 S4
 17
 S5
 16
 S6
 15
 S7
 14
 S8
 13
 S9
 12
S10
 11
S11
 10
S12
 19
 S3
 20
 S2
 21
 S1
 22
GEN
 23
SLR
RSA - Rake Sharing

9 halts. 132 intermediate Stations

Show ALL intermediate Stations

Time-Table has Changed. Show Changes
No Speed Change.
#1
/==/

0.0 km
LTT» Lokmanya Tilak Terminus»   Zone: CR
PF# 2   Day: 1   Spd: 55   Elev: 2m

16:25 +0
16.5 km8 intermediate stations00:18
#2
/==/

16.5 km
TNA Thane   Zone: CR
PF# 7   Day: 1   Spd: 52   Elev: 10m
16:43 +5
16:45 +6
18.1 km8 intermediate stations00:22
#3
/==/

34.7 km
X
KYN Kalyan Junction   Zone: CR
PF# 4   Day: 1   Spd: 53   Elev: 10m
Xing with 15018/Kashi Express | Thu
17:07 +9
17:10 +10
67.4 km13 intermediate stations01:16
#4
/==/

102.1 km
KSRA Kasara   Zone: CR
  Day: 1   Spd: 51   Elev: 294m

Technical Halt Bankers attached,
18:26 +5
18:31 +0
14.4 km4 intermediate stations00:17
#5
/==/

116.5 km
IGP Igatpuri   Zone: CR
PF# 2   Day: 1   Spd: 84   Elev: 590m

Bankers detached.
18:48 +9
18:50 +16
307.8 km37 intermediate stations03:40
#6
/==/

424.3 km
X
BSL Bhusaval Junction   Zone: CR
PF# 6   Day: 1   Spd: 51   Elev: 209m
22:30 +42
22:40 +48
123.6 km19 intermediate stations02:25
#7
/==/

547.8 km
X
KNW Khandwa Junction   Zone: CR
PF# 3   Day: 2   Spd: 95   Elev: 309m
01:05 -2
01:10 +6
107.5 km12 intermediate stations01:08
#8
/==/

655.4 km
X
HD Harda   Zone: WCR
PF# 2   Day: 2   Spd: 61   Elev: 289m
Xing with 11094/Mahanagari Express | Fri
02:18 +15
02:20 +15
75.7 km12 intermediate stations01:15
#9
/==/

731.1 km
ET Itarsi Junction   Zone: WCR
PF# 2   Day: 2   Spd: 47   Elev: 329m
03:35 +8
03:40 +15
18.1 km2 intermediate stations00:23
#10
/==/

749.2 km
HBD Hoshangabad   Zone: WCR
PF# 2   Day: 2   Spd: 48   Elev: 309m
04:03 +13
04:05 +15
67.6 km8 intermediate stations01:25
#11
/==/

816.7 km
HBJ• Bhopal HabibGanj•   Zone: WCR
PF# 4   Day: 2     Elev: 496m
05:30 +1
Scroll to Top
Scroll to Bottom


Go to Desktop site