Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

हम उस देश के वासी हैं, जिस देश में Shiv Ganga दौड़ती है

Search Trains
Post PNR
Availability Calendar
Search BLS to JJKR
Return# 22811
PDF Download

12422⇒22812/New Delhi - Bhubaneswar Tejas Rajdhani Express (via Adra) (PT)
नई दिल्ली - भुवनेश्वर तेजस राजधानी एक्सप्रेस (आद्रा के रास्ते)

BLS/Baleshwar --> JJKR/Jajpur Keonjhar Road

Updated: Jan 13 (01:11) by jishnuthakur12301^~
Jan 13 (01:11)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips
Other Trains in the News
Compare with the Shortest Route between Baleshwar and Jajpur Keonjhar Road.
Travel Time: 1h 37m     1 halts
Distance: 106 km     Avg Speed: 66 km/hr
Max Permissible Speed: 130 km/hr
Departs @ 12:41
Baleshwar/BLS 
Platform# 2
 
 
Tue
 
 
 
Sat
Arrives @ 14:18
JJKR/Jajpur Keonjhar Road 
Platform# 3
 
 
Tue
 
 
 
Sat
Type: Rajdhani
Rake Zone: ECoR/East Coast
Latest News
(You need to double-check/verify this info yourself)
JCO 02.02.24 is rescheduled by 01:00 hrs.
Fri Feb 02, 2024 (04:02PM)
News History
JCO 29.01.24 is rescheduled by 04:00 hrs.
Mon Jan 29, 2024 (01:54PM)
▪️Departure from New Delhi on 22.01.24 will be controlled for 1 hr in Adra Division & is rescheduled to leave New Delhi at 23.10 hrs
Mon Jan 22, 2024 (11:00PM)
▪️ Departure from New Delhi on 22.01.24 will be controlled for 1 hr in Adra Division
Sat Jan 20, 2024 (10:20PM)
▪️ Rescheduled to leave New Delhi at 02.30 hrs on 13.01.24 instead of 17.00 hrs on 12.01.24
Fri Jan 12, 2024 (10:46PM)
▪️To run with Tejas rakes from 01.09.23
Tue Aug 29, 2023 (06:32PM)
▪️ Departure from New Delhi on 02.06.23 is diverted via Gomoh - Anara - Chandil - Chakradharpur - Jharsuguda
Sun Jun 04, 2023 (03:52AM)
▪️ Departure from Anand vihar on 02.06.23 is diverted via Gomoh - Anara - Chandil - Chakradharpur - Jharsuguda
Sat Jun 03, 2023 (12:51AM)
➡️One Rake has a complete opposite CC -- L EOG B1...B11..H1 EOG ➡️ JCO 13.01.23 has been Cancelled.
Wed Jan 11, 2023 (09:07PM)
▪️One Rake has a complete opposite CC -- L EOG B1...B11..H1 EOG
Fri Feb 04, 2022 (12:38AM)
▪️ 3rd rake CC is -- L EOG H1 A1 A2 PC B1 -- B11 EOG 📢⚟ ➡️ JCO 15.10.2021 is Rescheduled by 6 Hours 30 Minutes ex. NDLS. Expected Departure Time - 2330hrs
Fri Oct 15, 2021 (05:23PM)
0 Follows
Rating: 4.4/5 (130 votes)
cleanliness - excellent (21)
punctuality - good (22)
food - good (22)
ticket avbl - good (21)
railfanning - excellent (22)
safety - excellent (22)
Bedroll/Linen: AVAILABLE change
Inaugural Run
Fri Apr 01, 1994
Pantry/Catering
✓ Pantry Car
✓ On-board Catering
✓ E-Catering
E-Catering at NDLS, HIJ, BLS, BHC, CTC, BBS
LHB Rake

Rake/Coach Position

  0
  L
  1
EOG
  2
AE1
  3
 A2
  4
 A1
  5
 H1
  6
 PC
  7
B11
  8
B10
  9
 B9
 18
EOG
 17
 B1
 16
 B2
 15
 B3
 14
 B4
 13
 B5
 12
 B6
 11
 B7
 10
 B8
▪️One rake running with completely opposite CC.
Loco
NDLS -> BBS

Show ALL intermediate Stations

1 halts. 17 intermediate Stations between Baleshwar and Jajpur Keonjhar Road
#1
-1525.8 km
/==/
Zone: NR
PF# 11
Speed: 94
Elev: 214m

17:00
Day: 1
440.2 km
68 intermediate stations
04:42
#2
-1085.5 km
/==/
Zone: NCR
PF# 5
Speed: 93
Elev: 127m
21:42
21:47
Day: 1
Remote Location Quota Starting and Charting Station.
194.5 km
29 intermediate stations
02:06
#3
-891.0 km
/==/
Zone: NCR
PF# 4
Speed: 82
Elev: 97m
23:53
23:55
Day: 1
152.6 km
21 intermediate stations
01:52
#4
-738.4 km
/==/
Zone: ECR
PF# 3
Speed: 92
Elev: 79m
01:47
01:57
Day: 2
205.0 km
39 intermediate stations
02:13
#5
-533.4 km
/==/
Zone: ECR
PF# 3
Speed: 71
Elev: 109m
04:10
04:13
Day: 2
Remote Location Quota Starting and Charting Station.
77.4 km
13 intermediate stations
01:05
#6
-456.0 km
/==/
Zone: ECR
PF# 3
Speed: 59
05:18
05:20
Day: 2
Remote Location Quota Starting and Charting Station.
93.5 km
17 intermediate stations
01:35
#7
-362.5 km
/==/
Zone: ECR
PF# 2
Speed: 54
Elev: 235m
06:55
07:00
Day: 2
72.7 km
11 intermediate stations
01:20
#8
-289.8 km
/--/
Zone: SER
PF# 4
Speed: 74
Elev: 185m
08:20
08:25
Day: 2
Remote Location Quota Starting and Charting Station.
53.0 km
9 intermediate stations
00:43
#9
-236.8 km
/==/
Zone: SER
PF# 1,2
Speed: 57
09:08
09:10
Day: 2
Remote Location Quota Starting and Charting Station.
124.7 km
18 intermediate stations
02:05
#10
-112.2 km
/==/
Zone: SER
PF# 2
Speed: 91
Elev: 44m
11:15
11:25
Day: 2
Xing with 18046/East Coast Express | Tue,Sat
112.2 km
16 intermediate stations
01:14
#11
0.0 km
/==/
Zone: SER
PF# 2
Speed: 56
Elev: 17m
12:39
12:41
Day: 2
62.4 km
9 intermediate stations
01:07
#12
62.4 km
%≡≡%
Zone: ECoR
PF# 2
Speed: 93
Elev: 17m
13:48
13:50
Day: 2
43.6 km
7 intermediate stations
00:28
#13
106.0 km
%≡≡%
Zone: ECoR
PF# 3
Speed: 76
Elev: 32m
14:18
14:20
Day: 2
72.1 km
13 intermediate stations
00:57
#14
178.2 km
/==/
Zone: ECoR
PF# 3
Speed: 30
Elev: 28m
15:17
15:19
Day: 2
27.7 km
7 intermediate stations
00:56
#15
205.9 km
/==/
Zone: ECoR
PF# 6

Elev: 33m
16:15

Day: 2
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy