Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Bhrigu Express: рдмрд▓рд┐рдпрд╛ рдХреА рдЖрди рдмрд╛рди рдФрд░ рд╢рд╛рди , рднреГрдЧреБ рдПрдХреНрд╕рдкреНрд░реЗрд╕ рд╣реИ рддреБрдореНрд╣рд╛рд░рд╛ рдирд╛рдоред рд╣рд░ рд░рд╡рд┐рд╡рд╛рд░ рддреБрдорд╕реЗ рдорд┐рд▓рдирд╛ рд╣реИ рдореЗрд░рд╛ рдХрд╛рдоред - Shanzil Kabir

Search Trains
Post PNR
Night Pic; Side View; EOG/SLR;
Entry# 4163626-0
Medium; Side View; Small TB; 3 AC;
Entry# 5563512-0


Availability Calendar
Search CNB to LKO
Return# 19054
PDF Download

19053/Surat - Muzaffarpur Express (PT)
Other Names: Mahuva
рд╕реВрд░рдд - рдореБрдЬрд╝рдлрд╝реНрдлрд╝рд░рдкреБрд░ рдПрдХреНрд╕рдкреНрд░реЗрд╕

CNB/Kanpur Central --> LKO/Lucknow Charbagh NR

Updated: Apr 25 (18:24) by PrakharYadav^~
Apr 25 (18:24)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips
Other Trains in the News
This is the Shortest Route between CNB and LKO.
Travel Time: 1h 40m     0 halts
Distance: 72 km     Avg Speed: 43 km/hr
Max Permissible Speed: 130 km/hr
Departs @ 11:50
Kanpur Central/CNB 
Platform# 5
 
 
 
 
 
 
Sat
Arrives @ 13:30
LKO/Lucknow Charbagh NR 
Platform# 2
 
 
 
 
 
 
Sat
Type: Mail/Express
Rake Zone: WR/Western
Latest News
(You need to double-check/verify this info yourself)
ЁЯФ╣Train No 19053 Surat-Muzaffarpur Exp dated 19/01/2024 will be operated on a diverted route VIA Kanpur Central, Prayagraj JN, Banaras, Varanasi Jn, Varanasi City, Ballia due to NI (doubling Work) at Lucknow Division/NR.
Sat Jan 13, 2024 (06:45AM)
News History
рд╕реВрд░рдд рд╕реЗ 08 рдПрд╡рдВ 15 рджрд┐рд╕рдореНрдмрд░ рдХреЛ рдЪрд▓рдиреЗ рд╡рд╛рд▓реА 19053 рд╕реВрд░рдд - рдореБрдЬрдлреНрдлрд░рдкреБрд░ рдПрдХреНрд╕рдкреНрд░реЗрд╕ рдкрд░рд┐рд╡рд░реНрддрд┐рдд рдорд╛рд░реНрдЧ рд▓рдЦрдирдК - рдмрд╛рд░рд╛рдмрдВрдХреА - рдЧреЛрдгреНрдбрд╛ - рдЧреЛрд░рдЦрдкреБрд░ - рдЫрдкрд░рд╛ рдХреЗ рд░рд╛рд╕реНрддреЗ рдЪрд▓рд╛рдИ рдЬрд╛рдПрдЧреАред
Fri Dec 08, 2023 (07:22PM)
тАв JCO 24.02.2023 will be diverted to run Via Chhapra-Gorakhpur-Mankapur-Ayodhya due to Non- Interlocking work at Kheta Sarai and Shahganj stations o┬нn Barabanki тАУAyodhya Cantt - Akbarpur - Zafarabad section of Lucknow Division over NR.
Sat Feb 18, 2023 (01:00PM)
ЁЯФ╣Due to BNI/NI Work at Lucknow NR Division Train No. 19053 Surat - Muzaffarpur Jn. ( ST-MFP ) as on Dt. 06-01-2023 will be diverted via Barabanki Jn.- Gonda Jn.- Gorakhpur Jn.- Chhapra. ( Via BBK-GD-GKP-CPR ).
Sat Dec 31, 2022 (09:48AM)
To run with LHB rakes wef 02/12/2022
Thu Nov 24, 2022 (09:36PM)
Will Run with end to end E-Loco W.E.F. 23/04/2022
Thu Apr 21, 2022 (06:51PM)
Train No. 19053/19054 Surat тАУ Muzaffarpur Junction тАУ Surat Express augmented with an additional Sleeper Class Coach Ex Surat (Friday) from 01.04.2022 to 27.05.2022Ex Muzaffarpur (Wednesday) from 03.04.2022 to 29.05.2022
Sun Apr 03, 2022 (09:41AM)
Augmented with an additional o┬нne second class sleeper and two AC 3 tier coaches. Ex Surat from 31.12.2021
Wed Dec 29, 2021 (08:24PM)
тЮбя╕П JCF 19.11.21 is operating with Regular Number.
Mon Nov 15, 2021 (09:03PM)
0 Follows
Rating: 5.0/5 (36 votes)
cleanliness - excellent (6)
punctuality - excellent (6)
food - excellent (6)
ticket avbl - excellent (6)
u/r coach - excellent (6)
railfanning - excellent (6)
safety - excellent (6)
Bedroll/Linen: AVAILABLE change
Pantry/Catering
✕ Pantry Car
✓ On-board Catering
✓ E-Catering
LHB Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
 GS
  3
 GS
  4
 S8
  5
 S7
  6
 S6
  7
 S5
  8
 S4
  9
 S3
 18
 A2
 17
 B1
 16
 B2
 15
 B3
 14
 B4
 13
 B5
 12
 B6
 11
 S1
 10
 S2
 19
 A1
 20
HA1
 21
 GS
 22
EOG
BINA
RSA - Rake Sharing
20955/20956. PM @ ST with RBPC


Show ALL intermediate Stations

0 halts. 12 intermediate Stations between Kanpur Central and Lucknow Charbagh NR
#1
-1488.1 km
/==/
Zone: WR
PF# 4
Speed: 73
Elev: 59m

07:35
Day: 1
129.7 km
25 intermediate stations
01:47
#2
-1358.4 km
/==/
Zone: WR
PF# 2
Speed: 52
Elev: 36m
09:22
09:32
Day: 1
146.9 km
22 intermediate stations
02:48
#3
-1211.4 km
/==/
Zone: WR
PF# 3
Speed: 66
Elev: 312m
12:20
12:22
Day: 1
113.9 km
16 intermediate stations
01:43
#4
-1097.5 km
/==/
Zone: WR
PF# 5
Speed: 51
Elev: 494m
14:05
14:15
Day: 1
41.1 km
5 intermediate stations
00:48
#5
-1056.5 km
/==/
Zone: WR
Speed: 55
Elev: 469m
15:03
15:05
Day: 1
55.5 km
8 intermediate stations
01:00
#6
-1001.0 km
/==/
Zone: WR
PF# 6
Speed: 34
Elev: 492m
16:05
16:15
Day: 1
Remote Location Quota Starting and Charting Station
41.2 km
5 intermediate stations
01:13
#7
-959.8 km
/==/
Zone: WR
PF# 1
Speed: 75
Elev: 510m
17:28
17:30
Day: 1
116.5 km
10 intermediate stations
01:33
#8
-843.3 km
/--/
Zone: WCR
PF# 1
Speed: 49
19:03
19:05
Day: 1
97.5 km
9 intermediate stations
02:00
#9
-745.8 km
/==/
Zone: WCR
PF# 2
Speed: 85
Elev: 476m
21:05
21:15
Day: 1
44.2 km
5 intermediate stations
00:31
#10
-701.6 km
/==/
Zone: WCR
PF# 2
Speed: 33
Elev: 500m
21:46
21:48
Day: 1
74.4 km
9 intermediate stations
02:17
#11
-627.2 km
/==/
Zone: WCR
PF# 4
Speed: 54
Elev: 411m
00:05
00:25
Day: 2
Rake Reversal (the train reverses direction)
153.2 km
19 intermediate stations
02:50
#12
-474.0 km
/==/
Zone: NCR
PF# 4
Speed: 76
Elev: 258m
03:15
03:23
Day: 2
Remote Location Quota Starting and Charting Station
97.5 km
11 intermediate stations
01:17
#13
-376.5 km
%≡≡%
Zone: NCR
PF# 2,3
Speed: 54
Elev: 212m
04:40
04:42
Day: 2
65.6 km
9 intermediate stations
01:13
#14
-310.9 km
%≡≡%
Zone: NCR
Speed: 83
Elev: 175m
05:55
05:57
Day: 2
52.5 km
3 intermediate stations
00:38
#15
-258.3 km
%≡≡%
Zone: NCR
PF# 2
Speed: 20
Elev: 167m
06:35
06:40
Day: 2
Remote Location Quota Starting and Charting Station
27.2 km
6 intermediate stations
01:20
#16
-231.1 km
/==/
Zone: NCR
PF# 7
Speed: 63
Elev: 167m
08:00
08:05
Day: 2
231.1 km
30 intermediate stations
03:40
#17
0.0 km
/==/
Zone: NCR
PF# 5
Speed: 43
Elev: 127m
11:45
11:50
Day: 2
72.0 km
12 intermediate stations
01:40
#18
72.0 km
/==/
Zone: NR
PF# 2
Speed: 48
Elev: 124m
13:30
13:40
Day: 2
Remote Location Quota Starting and Charting Station
127.7 km
17 intermediate stations
02:40
#19
199.7 km
/==/
Zone: NR
Speed: 10
16:20
16:25
Day: 2
7.0 km
1 intermediate stations
00:41
#20
206.7 km
/==/
Zone: NR
PF# 1,2
Speed: 30
Elev: 98m
17:06
17:08
Day: 2
97.9 km
10 intermediate stations
03:17
#21
304.6 km
/==/
Zone: NR
PF# 4
Speed: 45
Elev: 90m
20:25
20:30
Day: 2
Rake Reversal (the train reverses direction)
55.9 km
7 intermediate stations
01:15
#22
360.5 km
/==/
Zone: NER
PF# 1
Speed: 58
Elev: 84m
21:45
21:50
Day: 2
43.3 km
5 intermediate stations
00:45
#23
403.8 km
%==%
Zone: NER
PF# 3
Speed: 59
Elev: 70m
22:35
22:40
Day: 2
68.6 km
10 intermediate stations
01:10
#24
472.4 km
/==/
Zone: NER
PF# 2
Speed: 44
Elev: 65m
23:50
23:55
Day: 2
66.2 km
10 intermediate stations
01:30
#25
538.6 km
/==/
Zone: NER
PF# 3,4
Speed: 55
Elev: 58m
01:25
01:35
Day: 3
59.5 km
13 intermediate stations
01:05
#26
598.1 km
/==/
Zone: ECR
PF# 4,5
Speed: 31
Elev: 55m
02:40
02:45
Day: 3
53.8 km
9 intermediate stations
01:45
#27
651.9 km
/==/
Zone: ECR
PF# 3,4

Elev: 57m
04:30

Day: 3
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy