Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal Android   RailCal iPhone

site support

TKD WDP-4B "प्रतीक" - रंग ऐसा कि हर किसी को प्यार हो जाए - Anubhav Kashyap

Search Trains
Post PNR
IMAGINARY Train. NOT an ACTUAL running Train.
(Imaginary Trains are created by RailFans to explore various alternative Train Routes and TTs. Such trains are NOT ACTUALLY RUNNING on the tracks.)
Availability Calendar
Search CSMT to MAS
Return# IMG12906-1963210
PDF Download

IMG12905-1963210/♥♥Mumbai CSMT - MGR Chennai Central Duronto Express♥♥

CSMT/Mumbai CSM Terminus --> MAS/MGR Chennai Central

IMAGINARY Train.
HarshaI22159^~
Mar 16 (23:40)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips
The Shortest Route between CSMT and MAS is 23 km (2%) shorter.
Travel Time: 18h 15m     7 halts
Distance: 1280 km     Avg Speed: 70 km/hr
Max Permissible Speed: 130 km/hr between WADI/Wadi Junction and RU/Renigunta Junction
Departs @ 12:00
Mumbai CSM Terminus/CSMT 
Platform# --
 
Mon
 
Wed
 
 
 
Arrives @ 06:15 +1 night
MAS/MGR Chennai Ctrl 
Platform# --
 
 
Tue
 
Thu
 
 
Type: Duronto
Rake Zone: CR/Central
Not Practical - Futuristic
0 Follows
5
Bedroll/Linen: Don't know change
Pantry/Catering
✕ Pantry Car
✓ On-board Catering
✓ E-Catering
LHB Rake

Rake/Coach Position

  0
  L
  1
DL1
  2
 S1
  3
 S2
  4
 B1
  5
 B2
  6
 B3
  7
 B4
  8
 B5
  9
 B6
 18
 A4
 17
 A3
 16
 A2
 15
 A1
 14
B11
 13
B10
 12
 B9
 11
 B8
 10
 B7
 19
 A5
 20
 PC
 21
 H1
 22
EOG
 23
HCP
RSA - Rake Sharing
No RSA ☆ Single Rake ☆ PM @WB ☆

Show ALL intermediate Stations

7 halts. 243 intermediate Stations between Mumbai CSM Terminus and MGR Chennai Central
#1
0.0 km
/==/
Zone: CR
Speed: 60
Elev: 14m

12:00
Day: 1
53.5 km
33 intermediate stations
00:42
#2
53.5 km
/==/
Zone: CR
Speed: 54
Elev: 9m
12:42
12:45
Day: 1
46.5 km
9 intermediate stations
00:52
#3
100.1 km
/==/
Zone: CR
Speed: 35
Elev: 52m
13:37
13:40
Day: 1
Technical Halt Bankers Attached
27.8 km
5 intermediate stations
00:48
#4
127.9 km
/==/
Zone: CR
Speed: 55
Elev: 623m
14:28
14:30
Day: 1
Technical Halt Bankers Detached
63.7 km
17 intermediate stations
01:10
#5
191.6 km
/==/
Zone: CR
Speed: 87
Elev: 560m
15:40
15:45
Day: 1
262.4 km
38 intermediate stations
03:00
#6
454.0 km
/==/
Zone: CR
Speed: 86
Elev: 455m
18:45
18:50
Day: 1
149.8 km
19 intermediate stations
01:45
#7
603.8 km
/==/
Zone: CR
Speed: 83
Elev: 428m
20:35
20:40
Day: 1
229.3 km
29 intermediate stations
02:45
#8
833.2 km
/==/
Zone: SCR
Speed: 66
Elev: 451m
23:25
23:30
Day: 1
446.8 km
86 intermediate stations
06:45
#9
1280.0 km
/==/
Zone: SR

Elev: 3m
06:15

Day: 2
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy