Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal - Train Search + Time-Tables + Avl Calendar + Forum

Gatimaan Express: Raftaar meri Pehchaan - Sajid Akhtar

Search Trains
Post PNR
Availability Calendar
Search BKN to DDR
Return# 14708
PDF Download

14707/Ranakpur Express (PT)
राणकपुर एक्सप्रेस

BKN/Bikaner Junction --> DDR/Dadar Western

Updated: Mar 17 (00:34) by Himanshu_372138^~
Mar 17 (00:34)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips
Other Trains in the News
This is the Shortest Route between BKN and DDR.
Travel Time: 22h 40m     32 halts
Distance: 1218 km     Avg Speed: 54 km/hr
Max Permissible Speed: 110 km/hr between BANE/Basni and VR/Virar
Departs @ 08:30
Bikaner Junction/BKN 
Platform# 1
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Arrives @ 07:10 +1 night
DDR/Dadar Western 
Platform# 6,7
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Type: Mail/Express
Rake Zone: NWR/North Western
Latest News
(You need to double-check/verify this info yourself)
🔹गाडी संख्या 14707/14708, बीकानेर- दादर-बीकानेर रेलसेवा में बीकानेर से दिनांक 01.08.23 से 31.08.23 तक एवं दादर से दिनांक 02.08.23 से 01.09.23 तक 03 द्वितीय शयनयान श्रेणी डिब्बे की अस्थाई बढोतरी की जा रही है।
Sun Jul 30, 2023 (05:48AM)
News History
🔹Train No. 14708/14707 Dadar – Bikaner augmented with o­ne additional AC 3-Tier coach and three Sleeper Class coaches. Ex Dadar from 2nd March,to 1st April 2023 and Ex Bikaner from 1st March to 31st March, 2023.
Tue Feb 28, 2023 (07:58PM)
गाडी संख्या 14707 / 14708, बीकानेर-दादर-बीकानेर रेलसेवा में बीकानेर से दिनांक 01. 02.23 से 28.02.23 तक एवं दादर से दिनांक 02.02.23 से 01.03.23 तक 01 थर्ड एसी व 02 द्वितीय शयनयान श्रेणी डिब्बो की अस्थाई बढोतरी की जा रही है।
Mon Jan 30, 2023 (03:36PM)
गाड़ी संख्या 14707, बीकानेर-दादर रेलसेवा दिनांक 02.01.23 को बीकानेर से प्रस्थान करने वाली परिवर्तित मार्ग लूणी- भीलडी - पाटन - मेहसाना होकर संचालित की जाएगी।
Mon Jan 02, 2023 (12:15PM)
गाड़ी संख्या 14707, बीकानेर-दादर रेलसेवा दिनांक 02.01.23 को बीकानेर से प्रस्थान करने वाली परिवर्तित मार्ग नूनी-श्रीमही पाटन मेहसाना होकर संचालित की जाएगी।
Mon Jan 02, 2023 (09:34AM)
गाडी संख्या 14707 / 14708, बीकानेर-दादर-बीकानेर रेलसेवा में बीकानेर से दिनांक 01.08.22 से 31.08.22 तक एवं दादर से दिनांक 02.08.22 से 01.09.22 तक 01 थर्ड एसी व 04 द्वितीय शयनयान श्रेणी डिब्बो की अस्थाई बढोतरी की जा रही है।
Fri Jul 29, 2022 (03:56PM)
गाडी संख्या 14707 / 14708, बीकानेर - दादर - बीकानेर रेलसेवा में बीकानेर से दिनांक - 11.06.22 से 14.06.22 तक एवं दादर से दिनांक 12.06.22 से 15.06.22 तक 01 द्वितीय शयनयान श्रेणी डिब्बे की अस्थाई बढोतरी की जा रही है।
Sat Jun 11, 2022 (11:55AM)
गाडी संख्या 20971/20972, उदयपुर सिटी-शालीमार- उदयपुर सिटी रेलसेवा में उदयपुर सिटी से दिनांक 04.06.22 से 25.06.22 तक एवं शालीमार से दिनांक 05.06.22 से 26.06.22 तक 01 द्वितीय साधारण श्रेणी डिब्बे की अस्थाई बढोतरी की जा रही है।
Sat May 28, 2022 (10:26PM)
गाडी संख्या 14707 / 14708, बीकानेर-दादर- बीकानेर रेलसेवा में बीकानेर से दिनांक 21.05.22 से 31.05.22 तक एवं दादर से दिनांक 22.05.22 से 01.06.22 तक 01 द्वितीय शयनयान श्रेणी डिब्बे की अस्थाई बढोतरी की जा रही है।
Thu May 19, 2022 (10:51PM)
📢 दिनांक 01.04.2022 से 30.04.2022 तक बीकानेर से 1 तृतीय वातानुकूलित और 4 द्वितीय शयनयान श्रेणी के डिब्बों की अस्थायी रूप से बढ़ोतरी की जा रही है।।।
Sun Apr 03, 2022 (03:29AM)
📢 दिनांक 01.03.2022 से 31.03.2022 तक बीकानेर से 1 तृतीय वातानुकूलित और 5 द्वितीय शयनयान श्रेणी के डिब्बों की अस्थायी रूप से बढ़ोतरी की जा रही है।।।
Wed Mar 02, 2022 (03:02AM)
📢 Due to NI work in connection with doubling of Chandisar-Palanpur section of ADI Division, train no. 14707 will be diverted via Jodhpur-Bhildi-Patan-Mahesana on JCO 25.02.2022...
Fri Feb 25, 2022 (03:44AM)
📢 दिनांक 01.02.2022 से 28.02.2022 तक बीकानेर से 1 तृतीय वातानुकूलित और 5 द्वितीय शयनयान श्रेणी के डिब्बों की अस्थायी रूप से बढ़ोतरी की जा रही है।।।
Tue Feb 01, 2022 (03:40AM)
Train No. 14708/14707 Dadar – Bikaner augmented with an additional AC 3-Tier and 5 Sleeper Class coaches with immediate effect. Ex Dadar upto 1st January, 2022 and Ex Bikaner upto 31st December, 2021.
Mon Dec 06, 2021 (05:56AM)
Train Number 04708/04707 Dadar-Bikaner Special to run with an additional AC 3-Tier and two Sleeper Class coaches. The train will run from Dadar from 8 October 2021 to 1 December 2021 (on nominated days) and Bikaner from 7 October 2021 to 30 November 2021.
Mon Oct 11, 2021 (08:48AM)
4 Follows
Rating: 4.2/5 (59 votes)
cleanliness - good (11)
punctuality - excellent (11)
food - good (8)
ticket avbl - good (10)
u/r coach - average (8)
railfanning - excellent (9)
safety - good (10)
Bedroll/Linen: AVAILABLE change
Inaugural Run
Sat Aug 15, 1998
Pantry/Catering
✕ Pantry Car
✓ On-board Catering
✓ E-Catering
ICF Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
 GN
  3
 GN
  4
 S1
  5
 S2
  6
 S3
  7
 S4
  8
 S5
  9
 S6
 18
 A1
 17
 B4
 16
 B3
 15
 B2
 14
 B1
 13
SE3
 12
SE2
 11
SE1
 10
 S7
 19
 GN
 20
 GN
 21
SLR
RSA - Rake Sharing
No RSA. 3 Dedicated Rakes. PM @BKN

Show ALL intermediate Stations

32 halts. 213 intermediate Stations between Bikaner Junction and Dadar Western
#1
0.0 km
/--/
Zone: NWR
PF# 1
Speed: 80
Elev: 235m

08:30
Day: 1
32.0 km
2 intermediate stations
00:24
#2
32.0 km
/--/
Zone: NWR
PF# 1
Speed: 88
Elev: 275m
08:54
08:56
Day: 1
32.1 km
1 intermediate stations
00:22
#3
64.2 km
/--/
Zone: NWR
PF# 1
Speed: 115
Elev: 322m
09:18
09:20
Day: 1
51.7 km
4 intermediate stations
00:27
#4
115.8 km
/--/
Zone: NWR
PF# 1
Speed: 76
Elev: 296m
09:47
09:52
Day: 1
17.7 km
0 intermediate stations
00:14
#5
133.6 km
/--/
Zone: NWR
PF#: 1
Speed: 87
Elev: 334m
10:06
10:08
Day: 1
39.3 km
4 intermediate stations
00:27
#6
172.8 km
%==%
Zone: NWR
PF# 3
Speed: 60
Elev: 322m
10:35
10:40
Day: 1
19.9 km
1 intermediate stations
00:20
#7
192.7 km
/==/
Zone: NWR
PF# 2
Speed: 92
Elev: 324m
11:00
11:02
Day: 1
81.1 km
9 intermediate stations
00:53
#8
273.8 km
/==/
Zone: NWR
PF# 2
Speed: 9
Elev: 237m
11:55
11:57
Day: 1
2.0 km
0 intermediate stations
00:13
#9
275.8 km
/==/
Zone: NWR
PF# 1
Speed: 44
Elev: 241m
12:10
12:25
Day: 1
Remote Location Quota Starting and Charting Station
32.0 km
4 intermediate stations
00:44
#10
307.8 km
/==/
Zone: NWR
PF# 2
Speed: 32
13:09
13:12
Day: 1
41.2 km
3 intermediate stations
01:18
#11
348.9 km
/--/
Zone: NWR
PF# 1
Speed: 34
14:30
14:35
Day: 1
31.0 km
2 intermediate stations
00:55
#12
379.9 km
/--/
Zone: NWR
PF# 1,2
Speed: 75
Elev: 269m
15:30
15:35
Day: 1
27.6 km
3 intermediate stations
00:22
#13
407.5 km
/==/
Zone: NWR
PF# 1
Speed: 75
15:57
15:59
Day: 1
23.9 km
2 intermediate stations
00:19
#14
431.4 km
/==/
Zone: NWR
PF# 1
Speed: 59
Elev: 282m
16:18
16:20
Day: 1
14.8 km
1 intermediate stations
00:15
#15
446.1 km
/==/
Zone: NWR
PF# 1
Speed: 69
Elev: 283m
16:35
16:37
Day: 1
Xing with 19031/Yoga Express | Daily
16.1 km
1 intermediate stations
00:14
#16
462.2 km
/==/
Zone: NWR
PF# 1
Speed: 80
Elev: 291m
16:51
16:53
Day: 1
38.8 km
5 intermediate stations
00:29
#17
501.1 km
/==/
Zone: NWR
PF# 2
Speed: 51
Elev: 372m
17:22
17:24
Day: 1
43.8 km
5 intermediate stations
00:51
#18
544.8 km
/==/
Zone: NWR
PF# 1
Speed: 57
Elev: 262m
18:15
18:25
Day: 1
52.5 km
7 intermediate stations
00:55
#19
597.3 km
/==/
Zone: WR
PF# 2
Speed: 46
Elev: 231m
19:20
19:25
Day: 1
64.8 km
8 intermediate stations
01:25
#20
662.2 km
/==/
Zone: WR
PF# 2
Speed: 84
Elev: 93m
20:50
20:55
Day: 1
41.9 km
14 intermediate stations
00:30
#21
704.1 km
/==/
Zone: WR
PF# 2
Speed: 45
Elev: 74m
21:25
21:27
Day: 1
21.0 km
6 intermediate stations
00:28
#22
725.0 km
/--/
Zone: WR
PF# 1
Speed: 7
Elev: 55m
21:55
21:57
Day: 1
5.9 km
1 intermediate stations
00:48
#23
731.0 km
/==/
Zone: WR
PF# 9
Speed: 58
Elev: 52m
22:45
22:55
Day: 1
45.8 km
11 intermediate stations
00:47
#24
776.7 km
/==/
Zone: WR
PF# 1
Speed: 87
Elev: 37m
23:42
23:44
Day: 1
18.8 km
3 intermediate stations
00:13
#25
795.5 km
/==/
Zone: WR
PF# 4
Speed: 52
Elev: 40m
23:57
23:59
Day: 1
35.5 km
9 intermediate stations
00:41
#26
831.0 km
/==/
Zone: WR
PF# 3
Speed: 80
Elev: 36m
00:40
00:45
Day: 2
70.6 km
12 intermediate stations
00:53
#27
901.5 km
/==/
Zone: WR
PF# 4
Speed: 60
Elev: 18m
01:38
01:40
Day: 2
Xing with 22945/Saurashtra Mail | Daily
59.2 km
12 intermediate stations
00:59
#28
960.7 km
/==/
Zone: WR
PF# 2
Speed: 68
Elev: 59m
02:39
02:44
Day: 2
29.6 km
5 intermediate stations
00:26
#29
990.3 km
/==/
Zone: WR
PF# 2
Speed: 67
Elev: 12m
03:10
03:15
Day: 2
39.3 km
8 intermediate stations
00:35
#30
1029.6 km
/==/
Zone: WR
PF# 3
Speed: 60
Elev: 14m
03:50
03:55
Day: 2
26.1 km
4 intermediate stations
00:26
#31
1055.7 km
/==/
Zone: WR
PF# 2
Speed: 89
Elev: 27m
04:21
04:26
Day: 2
81.5 km
10 intermediate stations
00:55
#32
1137.2 km
%≡≡%
Zone: WR
PF# 2
Speed: 62
Elev: 15m
05:21
05:26
Day: 2
57.0 km
11 intermediate stations
00:55
#33
1194.2 km
/==/
Zone: WR
PF# 8
Speed: 30
Elev: 18m
06:21
06:23
Day: 2
23.6 km
13 intermediate stations
00:47
#34
1217.8 km
/==/
Zone: WR
PF# 6,7

Elev: 7m
07:10

Day: 2
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy