Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal - Train Search + Time-Tables + Avl Calendar + Forum

Ranikhet Express - रेगिस्तान में हरियाली

Search Trains
Post PNR
Large TB; EOG/SLR; Outside of Train; Standing at Station;
Entry# 3994107-0
Front-facing; Large TB; EOG/SLR; Outside of Train; Standing at Station;
Entry# 4452665-0


Availability Calendar
Search AWB to MMR
Return# 18504
PDF Download

22801⇒18503/Visakhapatnam - Sainagar Shirdi Weekly Express (PT)
विशाखपट्टणम - साईनगर शिरडी साप्ताहिक एक्सप्रेस

AWB/Aurangabad --> MMR/Manmad Junction

Updated: Mar 02 (13:17) by KarnavatiExpress^~
Mar 02 (13:17)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips
Other Trains in the News
Compare with the Shortest Route between Aurangabad and Manmad Jn.
Travel Time: 2h 30m     1 halts
Distance: 113 km     Avg Speed: 45 km/hr
Max Permissible Speed: 130 km/hr between DVD/Duvvada and CHZ/Charlapalli
Departs @ 06:20
Aurangabad/AWB 
Platform# 1,2
 
 
 
 
 
Fri
 
Arrives @ 08:50
MMR/Manmad Jn 
Platform# 5
 
 
 
 
 
Fri
 
Type: Mail/Express
Rake Zone: ECoR/East Coast
Latest News
(You need to double-check/verify this info yourself)
🔹Railways have decided to add o­ne additional AC-3 Tier coach to 18504/18503 Sainagar Shirdi-Visakhapatnam Express w.e.f. December 30, 2022 from Sainagar Shirdi and w.e.f December 29, 2022 from Visakhapatnam. 🔹Revised composition: o­ne AC-2 Tier, 5 AC-3 Tier, 7 Sleeper Class, 4 General Second class including o­ne Guard’s brake van and o­ne...
more...
generator van.
Mon Dec 26, 2022 (09:49PM)
News History
Due to Non-Interlocking work for commissioning of 3rd line between Rayanapadu - Kondapalli section, train num 18503 from Visakhapatnam to Sainagar Shirdi will be diverted via Guntur, Pagidipalli & Secunderabad, thereby skipping halts at Khammam, Warangal & Kazipet, with temporary halts provided at Guntur, Sattenapalli, Miryalaguda & Nalgonda, on journey commencing...
more...
on 01.09.2022, 08.09.2022, 15.09.2022.
Fri Sep 02, 2022 (11:11PM)
▪️Will run with LHB coaches from 07.07.22
Thu Jun 23, 2022 (07:38PM)
▪️CC;- 2AC—1, 3AC—4, SL—9, 2S—5, SLR/D—2▪️ ~Train number 08505 Visakhapatnam Sainagar Shirdi Special will be diverted via Vijayawada - Guntur - Nadikudi - Pagidipalli for JCO 08/07/2021 and the stoppages eliminated due to diversion are Khammam, Warangal and Kazipet.
Thu Jul 01, 2021 (11:03AM)
2 Follows
Rating: 3.6/5 (41 votes)
cleanliness - good (7)
punctuality - good (7)
food - average (5)
ticket avbl - good (7)
u/r coach - excellent (4)
railfanning - good (8)
safety - good (7)
Bedroll/Linen: AVAILABLE change
Inaugural Run
Sat Dec 15, 2012
Pantry/Catering
✕ Pantry Car
✓ On-board Catering
✓ E-Catering
LHB Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
 GS
  3
 GS
  4
 B1
  5
 B2
  6
 B3
  7
 B4
  8
 B5
  9
 A1
 BZA
 18
EOG
 17
 GS
 16
 S7
 15
 S6
 14
 S5
 13
 S4
 12
 S3
 11
 S2
 10
 S1
Loco
VSKP -> SCSC -> SNSI
Loco/Rake Reversals
BZA/Vijayawada Junction
SC/Secunderabad Junction

Show ALL intermediate Stations

1 halts. 11 intermediate Stations between Aurangabad and Manmad Junction
#1
-1205.6 km
/==/
Zone: ECoR
PF# 6
Speed: 37
Elev: 6m

08:20
Day: 1
17.2 km
4 intermediate stations
00:28
#2
-1188.4 km
/==/
Zone: ECoR
PF# 1
Speed: 73
Elev: 41m
08:48
08:50
Day: 1
15.8 km
1 intermediate stations
00:13
#3
-1172.5 km
/==/
Zone: SCR
PF# 2
Speed: 80
Elev: 31m
09:03
09:05
Day: 1
23.9 km
3 intermediate stations
00:18
#4
-1148.7 km
/==/
Zone: SCR
PF# 1
Speed: 86
Elev: 22m
09:23
09:25
Day: 1
40.0 km
3 intermediate stations
00:28
#5
-1108.7 km
/==/
Zone: SCR
PF# 1
Speed: 75
Elev: 25m
09:53
09:55
Day: 1
53.6 km
10 intermediate stations
00:43
#6
-1055.0 km
/==/
Zone: SCR
PF# 3
Speed: 70
Elev: 17m
10:38
10:40
Day: 1
50.1 km
9 intermediate stations
00:43
#7
-1004.9 km
/==/
Zone: SCR
PF# 1
Speed: 61
Elev: 14m
11:23
11:25
Day: 1
89.3 km
17 intermediate stations
01:28
#8
-915.6 km
/==/
Zone: SCR
PF# 3
Speed: 51
Elev: 13m
12:53
12:55
Day: 1
59.6 km
12 intermediate stations
01:10
#9
-856.0 km
/==/
Zone: SCR
PF# 4
Speed: 67
Elev: 19m
14:05
14:15
Day: 1
Rake Reversal (the train reverses direction)
99.1 km
17 intermediate stations
01:29
#10
-756.9 km
%≡≡%
Zone: SCR
PF# 2
Speed: 73
Elev: 118m
15:44
15:45
Day: 1
107.5 km
14 intermediate stations
01:28
#11
-649.4 km
/==/
Zone: SCR
PF# 2
Speed: 47
Elev: 271m
17:13
17:15
Day: 1
10.2 km
1 intermediate stations
00:13
#12
-639.2 km
/==/
Zone: SCR
PF# 3
Speed: 48
Elev: 286m
17:28
17:30
Day: 1
131.7 km
20 intermediate stations
02:45
#13
-507.5 km
/==/
Zone: SCR
PF# 9
Speed: 60
20:15
20:30
Day: 1
Rake Reversal (the train reverses direction)
Remote Location Quota Starting and Charting Station || Loco Change from Electric to Diesel
108.7 km
29 intermediate stations
01:49
#14
-398.8 km
/--/
Zone: SCR
PF# 1
Speed: 73
22:19
22:20
Day: 1
52.1 km
4 intermediate stations
00:43
#15
-346.6 km
/--/
Zone: SCR
PF# 1
Speed: 43
Elev: 383m
23:03
23:05
Day: 1
110.7 km
16 intermediate stations
02:35
#16
-236.0 km
%==%
Zone: SCR
PF# 1
Speed: 37
Elev: 362m
01:40
01:45
Day: 2
30.4 km
3 intermediate stations
00:50
#17
-205.5 km
%==%
Zone: SCR
PF# 2
Speed: 61
Elev: 382m
02:35
02:40
Day: 2
28.4 km
2 intermediate stations
00:28
#18
-177.1 km
/==/
Zone: SCR
PF# 1
Speed: 64
Elev: 412m
03:08
03:10
Day: 2
Xing with 11401/Nandigram Express | Fri
114.5 km
12 intermediate stations
01:48
#19
-62.7 km
/--/
Zone: SCR
PF# 1
Speed: 50
Elev: 502m
04:58
05:00
Day: 2
Xing with 17057/Devagiri Express | Fri
62.7 km
6 intermediate stations
01:15
#20
0.0 km
/--/
Zone: SCR
PF# 1,2
Speed: 56
Elev: 556m
06:15
06:20
Day: 2
88.8 km
7 intermediate stations
01:35
#21
88.8 km
/--/
Zone: SCR
PF# 1
Speed: 27
07:55
08:00
Day: 2
Xing with 12716/Sachkhand Express | Fri
24.6 km
3 intermediate stations
00:50
#22
113.4 km
/--/
Zone: CR
PF# 5
Speed: 44
Elev: 558m
08:50
08:55
Day: 2
42.2 km
4 intermediate stations
00:58
#23
155.6 km
/==/
Zone: CR
PF# 2
Speed: 49
Elev: 550m
09:53
09:55
Day: 2
Experimental basis halt w.e.f 1.03.24 to till further advice.
40.8 km
3 intermediate stations
00:50
#24
196.5 km
/--/
Zone: CR
PF# 1

Elev: 508m
10:45

Day: 2
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy