Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal - Train Search + Time-Tables + Avl Calendar + Forum

TKD WDP-4B "प्रतीक" - रंग ऐसा कि हर किसी को प्यार हो जाए - Anubhav Kashyap

Search Trains
Post PNR
Side View; Large TB; EOG/SLR; Outside of Train; Standing at Station;
Entry# 3776137-0
Small TB; Chair Car;
Entry# 5588510-1


Availability Calendar
Search SGNR to UMB
Return# 14525
PDF Download

14526/Shri Ganganagar - Ambala Cantt. InterCity Express
श्री गंगानगर - अम्बाला छावनी इंटरसिटी एक्सप्रेस

SGNR/Shri Ganganagar Junction --> UMB/Ambala Cantt. Junction

Updated: Oct 01 2023 (01:39) by AlphaTauri^
Oct 01 2023 (01:39)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips
Other Trains in the News
This is the Shortest Route between SGNR and UMB.
Travel Time: 7h 35m     13 halts
Distance: 328 km     Avg Speed: 43 km/hr
Max Permissible Speed: 110 km/hr
Departs @ 13:35
Shri Ganganagar Junction/SGNR 
Platform# 1
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Arrives @ 21:10
UMB/Ambala Cantt Jn 
Platform# 3
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Type: Mail/Express
Rake Zone: NR/Northern
Latest News
(You need to double-check/verify this info yourself)
🔹Train no. 14526/Shri Ganganagar - Ambala Cantt. InterCity Express JCO 01/12/2023 to 29/02/2024 (91 trips) will be fully cancelled due to foggy weather.
Tue Nov 14, 2023 (05:50PM)
News History
गाड़ी संख्या 14526, श्रीगंगानगर- अम्बाला कैंट प्रतिदिन रेलसेवा दिनांक 01.12.23 से 29.02.24 तक (91 ट्रिप) रद्द रहेगी।
Sat Nov 11, 2023 (10:36AM)
🔹Train no. 14526/Shri Ganganagar - Ambala Cantt. InterCity Express JCO 18/09/2023 to 28/09/2023 will be fully cancelled.
Fri Sep 15, 2023 (01:26PM)
🔹14525/14526 Ambala Cantt –Shri Ganganagar- Ambala Cantt Express JCO 15.03.23 to 24.03.23 has been cancelled.
Tue Feb 28, 2023 (08:16AM)
JCO 23/12/2022 has been rescheduled by 1 hour 30 minutes to leave Sri Ganganagar at a new departure time of 15:15 instead of 13:45
Fri Dec 23, 2022 (03:02PM)
📢 Due to NI work in Bathinda-Shri Ganganagar section of Ambala Division of Northern Railway, JCO 31.03.2022 will remain partially cancelled between Shri Ganganagar-Bathinda...
Wed Mar 30, 2022 (03:53AM)
📢 Due to NI work in Bathinda-Shri Ganganagar section of Ambala Division of Northern Railway, JCO 07.03.2022 will remain partially cancelled between Shri Ganganagar-Bathinda...
Mon Mar 07, 2022 (03:36AM)
📢 Due to NI work in Ambala Division of Northern Railway, JCF 18.02.2022 to 28.02.2022, will remain cancelled ...
Wed Feb 16, 2022 (03:22AM)
Coach Composition; ┃CC—1┃—┃2S—3┃—┃GS(2S)—4┃—┃SLR/D—2┃ ; 10 Coach 📢 Will remain cancelled from 12 sep 21 to 14 sep.2021
Mon Sep 06, 2021 (08:28PM)
0 Follows
Rating: 3.3/5 (28 votes)
cleanliness - good (5)
punctuality - good (5)
food - average (4)
ticket avbl - excellent (4)
u/r coach - good (4)
railfanning - average (5)
safety - average (5)
Bedroll/Linen: NOT Available change
Inaugural Run
Sat Jul 02, 2005
Pantry/Catering
✕ Pantry Car
✕ On-board Catering
✓ E-Catering
E-Catering avbl at BTI and UBC only
ICF Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
 GS
  3
 GS
  4
 C1
  5
 GS
  6
 GS
  7
 D1
  8
 D2
  9
 D3
 10
SLR
RSA - Rake Sharing
One Dedicated Rake with PM at UMB

Show ALL intermediate Stations

13 halts. 51 intermediate Stations between Shri Ganganagar Junction and Ambala Cantt. Junction
#1
0.0 km
/--/
Zone: NWR
PF# 1
Speed: 41
Elev: 176m

13:35
Day: 1
53.0 km
9 intermediate stations
01:17
#2
53.0 km
/--/
Zone: NR
PF# 1
Speed: 84
Elev: 186m
14:52
14:54
Day: 1
29.5 km
3 intermediate stations
00:21
#3
82.6 km
/--/
Zone: NR
PF# 1
Speed: 69
Elev: 194m
15:15
15:17
Day: 1
16.0 km
1 intermediate stations
00:14
#4
98.6 km
/--/
Zone: NR
PF# 1
Speed: 52
Elev: 188m
15:31
15:33
Day: 1
27.6 km
4 intermediate stations
00:32
#5
126.2 km
/--/
Zone: NR
PF# 7
Speed: 64
Elev: 207m
16:05
17:10
Day: 1
8.5 km
0 intermediate stations
00:08
#6
134.8 km
/==/
Zone: NR
PF# 1
Speed: 80
17:18
17:20
Day: 1
23.9 km
4 intermediate stations
00:18
#7
158.7 km
%==%
Zone: NR
PF#: 1
Speed: 66
Elev: 232m
17:38
17:40
Day: 1
13.1 km
1 intermediate stations
00:12
#8
171.9 km
%==%
Zone: NR
PF#: 1
Speed: 68
Elev: 222m
17:52
17:54
Day: 1
19.1 km
2 intermediate stations
00:17
#9
191.0 km
/==/
Zone: NR
PF# 1
Speed: 47
Elev: 229m
18:11
18:13
Day: 1
30.7 km
3 intermediate stations
00:39
#10
221.7 km
/==/
Zone: NR
PF# 1
Speed: 65
Elev: 241m
18:52
18:54
Day: 1
27.0 km
3 intermediate stations
00:25
#11
248.7 km
/==/
Zone: NR
PF# 1
Speed: 48
Elev: 248m
19:19
19:21
Day: 1
25.6 km
3 intermediate stations
00:32
#12
274.2 km
/==/
Zone: NR
PF# 2
Speed: 51
Elev: 252m
19:53
19:55
Day: 1
25.4 km
3 intermediate stations
00:30
#13
299.6 km
/==/
Zone: NR
PF# 2
Speed: 64
Elev: 269m
20:25
20:27
Day: 1
20.3 km
1 intermediate stations
00:19
#14
319.9 km
/==/
Zone: NR
PF# 1
Speed: 21
Elev: 272m
20:46
20:48
Day: 1
7.7 km
1 intermediate stations
00:22
#15
327.6 km
/==/
Zone: NR
PF# 3

Elev: 273m
21:10

Day: 1
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy