Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Bandra Garib-Rath - नाम से गरीब, लेकिन मेरे दिल के करीब - Abdul Rehman

Search Forum
Filters:
Page#    38 Blog Entries  <<prev  next>>
Info Update
39668 views
6

Jan 23 2023 (18:31)   TATA/Tatanagar Junction (6 PFs)
ShashankSwain99^~
ShashankSwain99^~   5642 blog posts
Entry# 5610085            Tags  
1 compliments
_/\_
#Tender for Providing architectural and technical consultancy for feasibility study, master planning, urban designing, engineering & Preparation of Detailed Project Report (DPR) for integrated Re-Development of TATANAGAR Railway Station of Chakradharpur Division

Approx. Cost : Rs. 31 Lakhs, Bid Security : Rs. 62,500/- & Completion period : 180 Days
Translate to English
Translate to Hindi

1 Public Posts - Mon Jan 23, 2023
Info Update
30448 views
3

Dec 20 2022 (14:53)   ADTP/Adityapur (3 PFs)
ShashankSwain99^~
ShashankSwain99^~   5642 blog posts
Entry# 5577433            Tags  
2 compliments
Agree Great
#Tender

Conducting Final Location Survey, Traffic survey, submission of comprehensive DPR for all civil, electrical and S&T work, preparation of detail estimate along with Alignment Plan, Yard Plan, drawing for minor bridges, major bridges, ROB/RUB, FOB, level crossing drawings, Hydrological & Geotechnical Investigation and all other ancillary works for (A) Flyover at A-cabin of Bondamunda (Item No. 31) (5.0 Km); (B) Flyover Padphar /Dongoaposi down grid to Dongoaposi 3rd line/Joint line (5.0 Km) (Item No. 28); (C) Flyover Up grid of Adityapur-Gamharia section to Birarajpur (Item No. 28) (5.0 Km); (D)
...
more...
Flyover Birarajpur to Kandra (Chandil) end (Item No. 32) (5.0 Km); (E) Bypass at Padapahar (Bolanikhadan to Banspani to Dhamra Port) (Item No. 33) (10.0 Km) under the jurisdiction of CPM/GS/CKP of S.E. Railway.
............
Approx. Cost: Rs. 53 Lakh, Bid Security: Rs. 1,06,800/- & Completion period: 03 months

Translate to English
Translate to Hindi

1 Public Posts - Tue Dec 20, 2022
Info Update
105943 views
5

Dec 13 2022 (15:08)   SLF/Silli (3 PFs)
ShashankSwain99^~
ShashankSwain99^~   5642 blog posts
Entry# 5570515            Tags  
#Tender

Conducting Final Location Survey, Traffic survey, submission of comprehensive DPR for all civil, electrical and S&T work, preparation of detail estimate along with Alignment Plan, Yard Plan, drawing for minor bridges, major bridges, ROB/RUB, FOB, level crossing drawings, Hydrological & Geotechnical Investigation and all other ancillary works for ILLOO-SILLI Bypass line avoiding MURI Jn. (5.9 km) under the jurisdiction of CPM/GSU/RNC of S. E. Railway.
.............
...
more...

Approx. Cost: Rs. 8.75 Lakh, Bid Security: Rs. 17,500/- & Completion period: 02 months

Translate to English
Translate to Hindi

1 Public Posts - Tue Dec 13, 2022
Info Update
18518 views
4

Dec 13 2022 (13:57)   TATA/Tatanagar Junction (6 PFs)
ShashankSwain99^~
ShashankSwain99^~   5642 blog posts
Entry# 5570473            Tags  
#Tender

Elimination of 01 Nos Manned Level crossings (LC No.139) by construction of RUB between Salgajhari - Tatanagar section under ADEN/I/TATA.(By Pushing Method)
.............
Approx. Cost: Rs. 10.84 Cr, Bid Security: Rs.
...
more...
6,92,000/- & Completion period: 12 months (1 Year)

Translate to English
Translate to Hindi
Info Update
15821 views
4

Dec 13 2022 (13:20)   TATA/Tatanagar Junction (6 PFs)
ShashankSwain99^~
ShashankSwain99^~   5642 blog posts
Entry# 5570439            Tags  
#Tender

Consultancy Services for Detailed Project Report and Detailed Design Consultancy in connection with Execution of Final Location Survey, Soil Investigation, Preparation Yard Plans, Slope stability analysis and Submission of various detailed Design & Drawings between (i) Nimpura Reception Yard-Kharagpur 3rd Line (4.40 Km), (ii) Hijli-Nimpura 3rd Line (5 Km), (iii) Nimpura Reception Yard-Kharagpur 4th Line (4.00 Km), (iv) KharagpurTatanagar 4th Line (134.1 Km) & (v) Kalaikunda-Nimpura West Outer-Gokulpur Connectivity Avoiding Nimpura Reception Yard (5 Km) under the jurisdiction of Dy CE/Con/Kharagpur of S. E. Railway. Estimate Nos. 14/FLS-SUR/2022, 15/FLS-SUR/2022, 16/FLS-SUR/2022,
...
more...
24/FLS-SUR/2022 and 25/FLS-SUR/2022.
................
Approx. Cost: Rs. 3.23 Cr, Bid Security: Rs. 3,11,600/- & Completion period: 06 months

Translate to English
Translate to Hindi
Page#    38 Blog Entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy