Full Site Search  
Thu Sep 21, 2017 03:10:06 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
×
Forum Super Search
Blog Entry#:
Words:

HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Filters:
Page#    322360 Blog Entries  next>>
  
Rail Fanning
0 Followers
40 views
Today (02:03)   04611/Ghazipur City - Shri Mata Vaishno Devi Katra Inaugural Special | BDKN/Bandhua Kalan (2 PFs) | IZN/WDP-4D/40421

Harsh*^~   28631 blog posts   75914 correct pred (77% accurate)
Entry# 2414444            Tags   Past Edits
INAUGRAL RUN | GHAZIPUR MATA VAISHNO DEVI KATRA Gliding Sultanpur !!
VIDEO LINK click here
04611 Ghazipur Shri Mata Vaishno Devi Katra express powred by IZZATNAGAR (IZN) WDP4D 40421Glides through Bandhua Kalan (BDKN) A sub Station of Sultanpur (SLN) on its first inaugral run.
Train is having 18 coaches consisting 3 general coaches,7 sleeper coaches,4 3AC Coaches,1 2A Coaches,1 Pantry Car and 2
...
more...
EOG.
Starting Clip Details:-
TKD WDM 3A 14135 Hauling 14015 Sadbhavna Express bounding To Delhi.Due to this train newly inaugrated GCT SVDK Express got knocked of its shedule.
#HDP
Train Status: 21m late
Last Update: at LXD/Lakshannath Road @ Today (03:01)
Next Station: NSI/Nekurseni
Next Halt: HIJ/Hijli


Blog  Time-Table

22 posts - Yesterday - are hidden. Click to open.

16 posts - Today - are hidden. Click to open.

  
27 views
Today (02:43)
instant journey in 18477^~   1545 blog posts   99 correct pred (58% accurate)
Re# 2414145-39            Tags   Past Edits
at ARD/Amarda Road
Passse at mps

  
18 views
Today (02:48)
instant journey in 18477^~   1545 blog posts   99 correct pred (58% accurate)
Re# 2414145-40            Tags   Past Edits
Heavy downpour started

  
16 views
Today (02:53)
instant journey in 18477^~   1545 blog posts   99 correct pred (58% accurate)
Re# 2414145-41            Tags   Past Edits
at JER/Jaleswar
Arrived @ pf 2

  
13 views
Today (02:55)
instant journey in 18477^~   1545 blog posts   99 correct pred (58% accurate)
Re# 2414145-42            Tags   Past Edits
at JER/Jaleswar
Departs.....amisdt the thunderstorms

  
5 views
Today (03:01)
instant journey in 18477^~   1545 blog posts   99 correct pred (58% accurate)
Re# 2414145-43            Tags   Past Edits
at LXD/Lakshannath Road
Passses
  
Rail News
0 Followers
6 views
Today (00:45)   India gets its first high horse power loco from Alstom France

Akhlaq~   32 news posts
Entry# 2414462   News Entry# 317570         Tags   Past Edits
India’s dream for high horse power locomotive moved closer to reality with the arrival of the first bodyshell of 12000 HP loco from Alstom France at Kolkata port today. This first-of-its-kind high-power electric locomotive will be used to haul freight trains at twice the existing speed by next year. The bodyshell for the fleet of the twin-section electric locomotives which Alstom is to supply to Indian Railways was unloaded at Haldia, ready for delivery to the factory at Madhepura where it will be assembled.
In November 2015, the public transporter inked a contract with the French company to manufacture 800 such train engines over the next 11 years in a joint venture at the Madhepura locomotive factory in Bihar. This is the
...
more...
first major FDI (Foreign Direct Investment) project in the rail sector.
The first such locomotive, estimated to cost about Rs 30 crore, will be assembled with components brought in from Alstom’s factories in France and will have its trial run by February next year.
The contract allows for the first five locomotives to be imported, but the remaining 795 are to be manufactured locally in support of the government’s Make in India campaign.
The total contract is worth above three billion euro. This project includes the set-up of a plant at Madhepura (Bihar state) and two maintenance depots at Saharanpur (Uttar Pradesh state)and Nagpur (Maharashtra state). The delivery of the locomotives will spread between 2018 and 2028. The locomotive will run at a speed up to 120 km/h.
The Railways is currently using 6,000HP locomotives for freight services. The increase in speed would also result in improving line capacity in the rail network, a railway official said.
As per schedule, 35 locomotives would be rolled out from the factory by 2020, 60 in 2021, followed by 100 every year till the target of 800 is completed.

  
14 views
Today (02:57)
©THE DARK LORD™   881 blog posts
Re# 2414462-1            Tags   Past Edits
Great News, Prima-F aa raha hai.
Page#    322360 Blog Entries  next>>

Scroll to Top
Scroll to Bottom


Go to Desktop site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.