Search Forum
Blog Entry# 1070729
Posted: Apr 25 2014 (11:03)
No Responses Yet
No Responses Yet
Please update the following section of Routes on the Atlas of this Site:
1. Uttratia - Chandaraulli Section on Lucknow Varanasi Mughal Sarai Section (Via SLN) is Electrified but further from Chandaraulli to Bandhua Kalan, the site does not show it to be electrified. (Under Construction).
2. Further from Bandhua Kalan to Sultanpur, the Section is Double electrified BG but from, Sultanpur to Sri Krisna Nagar, the electrification is under construction.
3....
more...
1. Uttratia - Chandaraulli Section on Lucknow Varanasi Mughal Sarai Section (Via SLN) is Electrified but further from Chandaraulli to Bandhua Kalan, the site does not show it to be electrified. (Under Construction).
2. Further from Bandhua Kalan to Sultanpur, the Section is Double electrified BG but from, Sultanpur to Sri Krisna Nagar, the electrification is under construction.
3....
more...