Search Forum
Blog Entry# 1085292
Posted: May 05 2014 (21:54)
5 Responses
Last Response: May 06 2014 (19:34)
5 Responses
Last Response: May 06 2014 (19:34)
does loco link shown here is right? Full journey on diesel loco while 85% of section is electrified!
yes it should get a WAP-7 of Howrah shed till Ludhiana atleast.
yes, it runs with diesel loco, seen it once at Mgs
need wap 7 hwh with revised TT:- HWH 23.55 62;536 PNBE 08.35/50 61;
749 MGS 12.20/40 38;768 BSB 13.10/20 69;929 SLN 15.40/45 57;
1062 LKO 18.05/25 65;1297 BE 22.05/10 61;1388 MB 23.40/55 67;
1584 SRE 02.50/03.00 75;1629 JUD 03.36/38 59;1665 UMB 04.15/25 68;
1778...
more...
749 MGS 12.20/40 38;768 BSB 13.10/20 69;929 SLN 15.40/45 57;
1062 LKO 18.05/25 65;1297 BE 22.05/10 61;1388 MB 23.40/55 67;
1584 SRE 02.50/03.00 75;1629 JUD 03.36/38 59;1665 UMB 04.15/25 68;
1778...
more...
time table will not be changed for sure as it shares its slot with some other assam bound trains, but its high time to use atleast a wap4 from howrah to ludhiana..pure waste of diesel..