Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Talk to a RailFan - you will learn a LOT about Trains.

Search Forum
<<prev entry    next entry>>
Blog Entry# 1100387
Posted: May 17 2014 (13:56)

13 Responses
Last Response: May 19 2014 (10:00)
Info Update
32554 views
15

★★
May 17 2014 (13:56)   DUI/Dhuri Junction (4 PFs)
 
gauravrockz
gauravrockz   492 blog posts
Entry# 1100387            Tags  
Station board
Translate to English
Translate to Hindi

9 Posts

13120 views
0

May 17 2014 (20:49)
Erode_WAP4^~
Erode_WAP4^~   32538 blog posts
Re# 1100387-10              
Semaphores are not removed yet there ???
I was thinking that it had removed in LDH DUI RPJ section. ...
Translate to English
Translate to Hindi

12194 views
1

May 17 2014 (20:56)
TheRailMail^~
TheRailMail^~   56721 blog posts
Re# 1100387-11              
yes not removed!
Translate to English
Translate to Hindi

11132 views
0

May 18 2014 (09:35)
thetrainexplorer~
thetrainexplorer~   3156 blog posts
Re# 1100387-12              
This is too late, I thought they must have been removed/replaced by now. Now how can OHE be installed with these semaphore masts erected. I dunno what IR is doing.
Translate to English
Translate to Hindi

13331 views
0

May 19 2014 (09:35)
Erode_WAP4^~
Erode_WAP4^~   32538 blog posts
Re# 1100387-13              
This not good at all. These semaphores need to be replaced with modern signals ASAP , otherwise it will take 2-3 more years for electrification...... :(
Translate to English
Translate to Hindi

12568 views
0

May 19 2014 (10:00)
thetrainexplorer~
thetrainexplorer~   3156 blog posts
Re# 1100387-14              
It feels so bad to see as how IR is so slow in upgrading the routes. I had a word with a Signal and Telecom engg at Patiala in DEC 2013, he said the up gradation of signal masts with 2CL and 3CL is going on at Dhuri. But after seeing these pics, they are nowhere even near that. Anyhow , I was told by the Dy CPM at DFCCIL, that by March 2016, everything will change on this route, IR may also plan for doubling RBR before DFC starts in 2016. Because to repay the loan DFCCIL took from World-bank, they must start functioning by March 2016. I am a little inquisitive about this that the DFC is entirely going to be on 2x25 KV, and its rolling stock is also going to be wider than the IR rolling stock, How they'll manage to move the traffic of DFC on...
more...
IR feeder routes ? Whether they'll consider to commission 2x25Kv for feeder route also ? Or they'll keep a switchover points from where the rolling stock also get switched ? But this is going to be time consuming. IR has a pressure under DFCCIL, as it has told IR to upgrade their feeder routes ASAP, with repair of old bridges, commissioning of ROBs and RUBs , track up gradation etc, electrification as i was told by the engg, would take only 4-6 months only if IR speeds up the up gradation process. Lets see and hope that this new govt shall speed up the process if Mr E. Sreedharan is inducted as Railway Minister. He is the one who started Delhi Metro and also known as Metro Man.

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy