Semaphores are not removed yet there ???
I was thinking that it had removed in LDH DUI RPJ section. ...
I was thinking that it had removed in LDH DUI RPJ section. ...
This is too late, I thought they must have been removed/replaced by now. Now how can OHE be installed with these semaphore masts erected. I dunno what IR is doing.
This not good at all. These semaphores need to be replaced with modern signals ASAP , otherwise it will take 2-3 more years for electrification...... :(
It feels so bad to see as how IR is so slow in upgrading the routes. I had a word with a Signal and Telecom engg at Patiala in DEC 2013, he said the up gradation of signal masts with 2CL and 3CL is going on at Dhuri. But after seeing these pics, they are nowhere even near that. Anyhow , I was told by the Dy CPM at DFCCIL, that by March 2016, everything will change on this route, IR may also plan for doubling RBR before DFC starts in 2016. Because to repay the loan DFCCIL took from World-bank, they must start functioning by March 2016. I am a little inquisitive about this that the DFC is entirely going to be on 2x25 KV, and its rolling stock is also going to be wider than the IR rolling stock, How they'll manage to move the traffic of DFC on...