Will Soon Below train are get AC Loco of End to End
train
12631/32 12633/34 12641/42 12665/66 12667/68 16127/28 16723/24 22627/28 because of Ten to Vpt station get electrification finished but Waiting for Clearance of CRS
train
12631/32 12633/34 12641/42 12665/66 12667/68 16127/28 16723/24 22627/28 because of Ten to Vpt station get electrification finished but Waiting for Clearance of CRS
2 Posts
Good to see WAP-4/7 :), but will miss those monstrous WDP-4B locos after electrification :(
You won't miss coz for some trains due to operational difficulties, loco shed maintainance difficulties and electric loco shortages it will run with diesel locos in electric traction...
DEC 8 and 9 CRS for electrification between VPT-MEJ-TEN/TN.......Already TEN-CAPE is electrified and trains like TEN-BSP TEN-HAPA running with AC Loco from TEN.....So Soon we can expect trains like CAPE-HWH/Thirukkural and all chennai bound trains from TEN/CAPE/TN/ via VRI will run with AC loco
Thats a great news. It will take a big load off MDU division which is struggling with loco changes.
95 % of the Chennai - Nagercoil section runs with in track. Will Electrification bring any significant time savings(apart from Loco change time ~20 min) in Nagercoil -> Chennai direction, as all trains aggregate in this route ?