Search Forum
Blog Entry# 1299911
Posted: Dec 07 2014 (19:14)
3 Responses
Last Response: Dec 07 2014 (21:07)
3 Responses
Last Response: Dec 07 2014 (21:07)
OMG, 9 AC coaches not required, instead of AC coaches, SL can increase
Add some more halts like SY... over speed at some stretch kindly correct it better u change as express type and 9 AC coaches are not required and operating wdp4b through ML is a bit tough under present conditions so give wap1 till vm and wdm/p 3 goc till SCT
he is not creator.
TT of it ahead pallavan. which will cause operational difficulty in MS
TT of it ahead pallavan. which will cause operational difficulty in MS