Search Forum
Blog Entry# 1303363
Posted: Dec 10 2014 (20:22)
30 Responses
Last Response: Dec 22 2014 (22:41)
30 Responses
Last Response: Dec 22 2014 (22:41)
New Facilities/Technology
SECR/South East Central
Milan Bhatnagar 1 news posts
Within 1.5 year , semihighspeed train that is 160 kmph will run between Bilaspur-Nagpur, rupees 300 crore has been sanctioned. ...
read more... Semi Highspeed Train between Bilaspur Nagpur
26 Posts
Yes its busy on constructing new line on katangi side but nothing on Ngp CWA isme bahut time h abhi. Kuch bhi samaan nhi aaya gc ka koradih khaprikheda station pe
CWA side se chalu hai but very slow
Tunnels being constructed and bridges almost complete
Tunnels being constructed and bridges almost complete
But ngp side se bilkul nhi h. Koradih khaparkheda, itwari kahi bhi kuch nhi ho raha gc k liye
Oh... so the Bilaspur Rajdhani can run at 130 Kmph MPS on this stretch... IR should first enable EVERY Rajdhani train in India to run at an MPS of 130 Kmph on most straight track stretches. Trains like GHY Raj via LKO, ADI Raj and BSP Raj still do not run at 130 Kmph for their entire or most of the journey :-p
yes..very soon may be from may 2015 tracks between BSP and DURG will be ready for 130 kmph ! Work is in great progress now